ML20127J329

From kanterella
Jump to navigation Jump to search
Requests Withdrawal of TS Change Request 138, Instrumentation Sys Operating Conditions, & TS Change Request 140, SG Overfill Protection, . Requests That TS Change 154 Be Processed
ML20127J329
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/08/1993
From: Link B
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-93-005, CON-NRC-93-5 VPNPD-93-006, VPNPD-93-6, NUDOCS 9301250104
Download: ML20127J329 (1)


Text

__ _

Wisconsin

' Dectnc k

PCM R COMPMY p y, w 4 y r,

o s mum w 4

pmm:

VPNPD-9 3- 00 6

- NRC 00 5 January 8, 1993 Document Control Desk U.S. HUCLEAR REGULATORY COMMISSION Mail Station F1-137 Washington, DC 20555 Gentlemen:

DQClETS S0-266 AND 50-301 REQUEST TOETJiDPAW TEclitLICAL SPECIFICATIQ1L CllAliGFEQUlfiTS 138_ AND 140 POINT _ BGOL11ELER PLANT. UNITS 1_ ANL2 On December 10,-

1992, Wisconsin Electric submitted Technical Specification Change Request 154, " Modifications to Technical Specifications sections 15.3.5 and 15.4.1."

This change proposes revisions to various tables in' Sections 15.3.5, " Instrumentation System," and 15.4.1,

" Operational Safety Review."

In order to make that change request an complete as possible, several items that were previously proposed in earlier change. requests were also included in Technical Specification Change Request 354.-

For this-reason, we request that Technical Specification Change Request 138,

" Instrumentation System Operating Conditions," dated March 30, 1990, and Technical Specification Change Request 140, " Steam Generator Overfill Protection," dated July 31, 1990 be withdrawn from the docket.

In conclusion, Wisconsin Electric believeu that the proposed withdrawal of these two change requests does not lessen-the significance of their proposed revisions.

Therefore,_it is j

requested that you process Technical Specification Change L

Request-154 at the earliest opportunity.

I Please-contact us if-there are any questions.

(

Sincerely, l

(pr/ '/ p')

s gg.

y 21 u l. r..-uu

-Dob Link Vice President Nuclear Power FDP/jg 9301250104 930109 i

Enclosure hDH ADOCK 05000266

- PDR cc: _NRC Regional Administrator,-Region III-0 NRC-Resident InspcSME,o uwe/h,ppew -

?

" - -