SNRC-1181, Proposed Tech Spec 3.10.5 Suspending Provisions of Tech Spec 3.6.6.2 During Performance of Startup Test Program Until Reactor Has Operated for 120 EFPD
| ML20127J288 | |
| Person / Time | |
|---|---|
| Site: | Shoreham File:Long Island Lighting Company icon.png |
| Issue date: | 06/19/1985 |
| From: | LONG ISLAND LIGHTING CO. |
| To: | |
| Shared Package | |
| ML20127J278 | List: |
| References | |
| SNRC-1181, NUDOCS 8506260541 | |
| Download: ML20127J288 (1) | |
Text
. _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _
ATTACHMENT
['
l SNRC-1181 Page 1 of 1 PROPOSED TECHNICAL SPECIFICATION CHANGE i
4 I
j' SPECIAL TEST EXCEPTIONS 1
3/4.10.5 OXYGEN CONCENTRATION LIMITING CONDITION FOR OPERATION I
3.10.5 The provisions of Specification 3.6.6.2 may be suspended during the performance of the Startup Test Program until the reactor has operated for 120 effective full power days.
j j
APPLICABILITY:
OPERATIONAL CONDITION 1.
ACTION l
1 t
With the requirements of the above specification not satisfied, j
be in at least STARTUP within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
i SURVEILLANCE REQUIREMENTS l
I 4.10.5 The number of effective full power days of operation j
l since initial criticality shall be verified to be less than or equal to 120, by calculation, at lease once per 7 days during the Startup Test Program.
These calculations shall be performed once t
Power Ascension Testing above 5% of rated THERMAL POWER occurs.
i I
J 0506260541050ggj22 PDR ADOCK 05 PDR i
P l
i 1
l Shoreham - Unit 1 3/4 10-5 4
-