SNRC-1181, Proposed Tech Spec 3.10.5 Suspending Provisions of Tech Spec 3.6.6.2 During Performance of Startup Test Program Until Reactor Has Operated for 120 EFPD

From kanterella
(Redirected from ML20127J288)
Jump to navigation Jump to search
Proposed Tech Spec 3.10.5 Suspending Provisions of Tech Spec 3.6.6.2 During Performance of Startup Test Program Until Reactor Has Operated for 120 EFPD
ML20127J288
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 06/19/1985
From:
LONG ISLAND LIGHTING CO.
To:
Shared Package
ML20127J278 List:
References
SNRC-1181, NUDOCS 8506260541
Download: ML20127J288 (1)


Text

. _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _

ATTACHMENT

['

l SNRC-1181 Page 1 of 1 PROPOSED TECHNICAL SPECIFICATION CHANGE i

4 I

j' SPECIAL TEST EXCEPTIONS 1

3/4.10.5 OXYGEN CONCENTRATION LIMITING CONDITION FOR OPERATION I

3.10.5 The provisions of Specification 3.6.6.2 may be suspended during the performance of the Startup Test Program until the reactor has operated for 120 effective full power days.

j j

APPLICABILITY:

OPERATIONAL CONDITION 1.

ACTION l

1 t

With the requirements of the above specification not satisfied, j

be in at least STARTUP within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

i SURVEILLANCE REQUIREMENTS l

I 4.10.5 The number of effective full power days of operation j

l since initial criticality shall be verified to be less than or equal to 120, by calculation, at lease once per 7 days during the Startup Test Program.

These calculations shall be performed once t

Power Ascension Testing above 5% of rated THERMAL POWER occurs.

i I

J 0506260541050ggj22 PDR ADOCK 05 PDR i

P l

i 1

l Shoreham - Unit 1 3/4 10-5 4

-