ML20127J149

From kanterella
Jump to navigation Jump to search
Fr Notice of Issuance of Amend 27 to Provisional OL DPR-22, Revising TS to Incorporate Reduced MAPLHGR Limits at Reduced Core Flow
ML20127J149
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 05/24/1977
From: Desiree Davis
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20127J146 List:
References
NUDOCS 9211190214
Download: ML20127J149 (2)


Text

___ _ .___ _ _ _ _ . . - . _ _ _ _ _ _ ______ __ _ _ _ _ . _ _ _ _ _ . _ _

t.

UMITTD Sl ATES NUCLE /A DECULATnY COM:11Sil0:1 DDCKET 1:0. 50-253 ,

f,0RTHECU STATES PO'.s'ER C9MPANY NOTICE OF ISSUAMCE OF At'.Ef:D"EllT T0 PRWISIONAL OlVRTiiHG 1.fcliiSE 4

The U. S. Iluclear Regulatory Concnission (the Loa. mission) has issued Amendment l'o. 27 to Provisional Operating License Mr. DPR-22, issued to Morthern States Po,ier Company (the licensee), which revised Technic al Specifications for operation of the l',onticello Nuclear Generating Plant (the facility) located in Wright County, liinnesota. The cuandmont is effective as of its date of issucnce.

The cmend :nt modified the existing !'onticello Tuchnical Specifi-cations to incorporate reduced t',aximt.m /verage Planar Lineer heat Generating Rate (MAPLH3R) limits at reduced core flow. Those char.ges core in response to revised General Electric analyses t:hich had been acknculedged

! by the licensee and acted upon voluntarily.

The filing by the licensee complies with the st;ndards and requirements of the Atomic Energy Act of 1954, as amended (the Act),

and the Commission's rules and rcoulctions. The Cen. mission hes mde approprinto findings as required by he Att cr.d the CcMission's rules and regulations in 10 CFR Chapter 1, which are set forth in the license caendment. Prior public notice of this cmendment was not required since the amenda3at does not involve a sienificant hazards ccasideration.

l 9211190214 770621 gDN ADOCK 05000263 PDR ~~ ~~

_ _ . . . . _ - ,- _ . ~ . _ _ - - - _ _ - . ., _ . - . _ . , _ , - ~ , . _ , . _ , . _ _

,a

- 2-The Conciission has determined that the issuance of this ameadment will not result in any significant environmental iupact and that pursuant to 10 CFR 551.5(d)(4) an environmental inpact statement or negative declaration and environmental impact appraisal need not be prepared in connection with issuance of this emendment. l For further details with respect to this action, see (1) the licensee's filing dated !!ovember 15,1976,(2) General Electric Company's letters dated August T.4, 1976, and !-!ovember 4,1970,(3) Amendment No -27 -

to Liecaw tio. DPR-22, and (4) the Conission's related Safety Evaluation.

All of the:,e items are availabic for public inspection at the Commission's .

Public Document Room,1717 li Street, !!. U. , l!ashington, D. C and at The Environmental Conservation Library, liinneapolis Public Library, 200

!!icollet Mall, !!inneapolis, liinnesota 55401. A single ccpy of items (3) hnd (4) may be obtained upon request addressed to the U. S. llucleur Regulatory Commission, Washington, D.-C. 20555, Attention: Dirccior, Division of' Operating Reactors.

Dated ct Dethesda, !%ryland, this 24th' day of !!ay,1977.

F THE I;UCLEAR REGULATORY COBil5SIOW 1 ,3 ,q d'W No s Don K; Dasis, Acting Chief Operating Reactors Branch #2

'- Divi':f oa of Operating Reactors i

l ,

i l

1:

l-

. - . , , . - . - ,,, _ .. _ . _ , . , , , _ , - , , , . . . _ . . - , , , , , _ ...,,,a.,_,~._.u..,,. . _,,,.-- . u ..,_, .-,.u.-..-, ;