UNIT ED 8TATES
y[p8%,h' n
k
NUCLEAR REGULATORY COMMISSION
-\\
)
REGION lll
(
7W nOOSEVELT n0AD
I,;, ,
f
GLIN iLLYN,ILUNOIS 00137-%21
o
a
% ,,,,,
JAN 1 f
.7
P
Docket No. 50-295
License fio. OPR-39
,
Commonwealth Edison Company
Allit:
Mr. L. O. DelGeorge
Vice president, fluclear Oversight
and Regulatory Services
Executive lowers West 111
1400 Opus Place, Suite 300
Downers Grove, IL 60515
Dear Mr. DelGeorge:
This refers to the special safety inspection conducted by D. E. Jones of this
office from October 27, 1992 through January 8, 1993. lhe inspection included
a review of activities authorized for your Zion fluclear Generating Station,
At the conclusion of the inspection, the findings were discussed with
Unit 1.
those members of your staff ident'fied in the enclosed report.
The enclosed copy of our inspection report identifies areas examined during
Within these areas, the inspection consisted of a selective
the inspect lon.
examination nf procedure and representative records, observations, and
interviews wiD norsonnel .
.
During this inspection, certain of your activities appeared to be in violation
in addition to a
of t4RC requiremants, as specified in the enclosed Notice,
written response, an enforcement conference will be conducted to discuss the
violation, your corrective actions, and the occurrences of personnel errors at
personnel error events in which we are particularly interested include
Zion.
the following:
foreign object damage to the 1A AFW pump, Unit 2 AfW support
damage, ILRT valve lineup errors, and an inadvertent steam dump isolation.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
public Document Room.
i
9301250033 930119
,
ADOCK 05000295
.
G
PDET
}/0
q
--
-
_
._
l
,
.
,
l-
i
Congnonwealth [dison Company
2
.
i
We will gladly discuc<. any questions you have concerning this inspection.
Sincerely,
t
b
7
firent Clayton, Chief
-
-
Reactor projects tiranch 1
,
Enclosure:
Inspection Reports
flo, 50-295/92031(DRP)
,
cc w/ enclosure:
R. luetken, Site Vice President
S. Kaplan, Regulatory Assurance
Supervisor
D. farrar, fluclear Regulatory Services
Manager
DCD/DCll(RIDS)
OC/lfDCil
ltesident inspectors, lion, tiraidwood,
Ilyron
R, llubbard
J. McCaffroy, Chief, Public Utilities
!
Division
Mayor, City of Zion
Licensing Project Manager, f1RR
11. flewmann, Offico of Public Counsel,
State of Illinois Center
R. Iliompson, Administrator, Wisconsin
Division of Emergency Covernment
State 1.laison Officer
i
E
q
- -
i
. - . -
- - - .
.-
. - . -
.
-.
.
- - - .
__ - -
-- -.