Monthly Operating Rept for Jul 1974 for Monticello Nuclear Generating Power
ML20127H652
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 07/31/1974
From: Jacobson G, Neils G
NORTHERN STATES POWER CO.
To: Chapman S
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 9211180573
Download: ML20127H652 (4)


Text

le

..[..

s NSE3 NORTHERN STAYES POWER COMPANY M I N N E A PO L.l S M l N N E S OT A 99401 August 9, 1974 r-f6I Y a %,, *R 4s v' -. '

k ',3 w#

~ "#'

Office of Plans & Schedules 4

Directorate of Licensing f\\

U S Atomic Energy Conrnission Washington, DC 20545 t

Attention: Mr S Chapman Gentlemen:

MONTICELLO NUCLEAR GENERATING PIANT Docket No. 50-263 License No. DPR-22 Monthly Operating Data July 1974 In accordance with the request of February 19, 1974 from Mr L Manning Muntzing, the attached operating data for the month of July 1974 from the Monticello Nuclear Generating Plant is provided.

Very truly yours,

/f*w*-

< ($

G H Neils General Superintendent of Nucicar Power Plant Operation GHN/ts cc: J G Keppler

,s q

gtG,

a Attachments g d' fh$

l l

bbbb 9211180573 740731 PDR ADOCK 05000263 R

PDR__

?

2,026-UNIT NA51E _ tDNflGF1.i.0 NHCLEAR GD:EPATING PIAVf

'IRTE

, J gust 5, 1974 CfWLITED BY _C. H. _Jacobson OPERATING STATUS I

1.

REPORTING PDlIOD:

0000740701 TO 2400740731 GROSS IDURS IN REPORTING PERIOD; 744 2.

ClIRRENTLY ALTD 0R12ED POWiiR LIVEL hkit 1670 hMc-NET 559 (Pool Winter Rating, M\\rCA test) 3.

P0hTR LEVEL TO L11101 RESTRICTED (IF ANY):

4.

RFASONS FOR RESTRICfl0NS (IF NN):

1111 S CUMULATIVE 3DNDI YR-TO-DATE TO DATE 5.

Hmn9 PiMCTOP li\\S CRITICAL 734 3,478 19,915 6.

HOUB9 Giliilui0n ON-LINE 606 3,139 21,519 7.

CROES THEF:nl PTliER GU,TRATED (!4,11) 83J,608

_(32J1J)12 2R.R31 223 8.

CROSS ElIriUTCA1 P01lER GENFMTED (Nh11) 283,830 1,480,610

_ 9,870,840 9.

NET ElECTRKAL NihTi; GEhTRATFD (bth11) 268,292 1,412,478 9,438,276

10. REACTOR AVAllAr,ILITY FACTOR (1) 98.7%

68.4%

73.6%

11. PLAVf AVAILABILITY FACTOR (2) 81.5% _

61.7%

79.6%

64.5%

49.7%

62.4%

12. PLET CAPACITY FICTOR (3) 13.

FORCED OiffAGE RATE (4) 3.4%

4.2%

14.0%

14. SHlIITXT,GS 50[EDlnrD TO BEGIN IN NFA'T 6 FDNTHS (STATE TYPE, DATE, AND DUMTION OF EA01):

Refueling Outage, 1/2/75, six weeks duration.

15.

IF EHITTDOWN AT END OF REPORT PERIOD, ESTIM\\TED DATE OF STARTUP:

16. PLWrS IN TEST STATUS (DELETED)

(1) REACTOR AVA11 ABILITY FACTOR = IlOURS REACTOR WAS CRITICAL

  • 100 CTDSS IKURS IN IEPORTING PERIOD (2) PIANT AVAI1 ABILITY FACTOR = IDURS GTATRATOR ON-LINE
  • 100 CROSS IDtilLTTN REPORTIKG PERIOD l

(3) PLANT CAPACITY FACTOR = NET ELECIfRICAL P0hTR GENERATED

  • 100 Ri'T DEbON$TfMTED^ GROSS lDIlh5 IN REPORTING PERIOII f

(4) FORCED CITTAGE RATE = FORCED OUTAGE HOURS

  • 100 Il0DRS GEfERATOR ON-LINE + FORCED OUI AGE HUlT5 l

l l

)

2025 Abnticello Nuclear UNIT Generating Plant InTE August 5,1974 l

CofIPLim!D BY G.11. Jacobson 4,

DAILY PIR,T Pohl!R NfPLTT 4

1 j

I FITGI July g

y yg. net

-net DAY MTRACE il0UPLY IMe 466 25 457 1

461 26 457 2

379 27 456 I

3

-5 28 459 4

-5 29-459 5

30 459

-5 6

31 457

-6 7

6 8

247 9

451 10 J

437 11 469 12 465 l

13 472 i

14 243 15 i

?>97 16 365 17 475 18 499 19 20 454 21 452 22 447 23 444 459 i

24 l

l

~ ~.

- ~.

-. =.

~

2027 SONTIELLO.'iiCliAR UNIT NAME GENER\\ TING PLnT sust.nRT DATE Auzust 6. 1974 Operated as base loaded unit. Out-CGFLElw BY W. A. Shamla' ages described below.

REPORT BDNIII July 9

PIET SiTuTICCS TYPE FET DiiJF F-FORCED IURATION SIMIT'NG ii7cY NO.

DATE S-Si!E'UI.ED O!OURS)

REASON (1)

T!:E Fl V'""! C ).

CG FGTS S

! 116.8 B

A Shutdown in preparation for CGU system 8

l740703 tie-in for testing.

^

4 9

740708 F

11.1 A

A Off Gas ignition.

10 740715 F

'10.5 I

G C

Plant low reactor water level scram from 60% power level due to instabilities initiated by inadvertent flooding of off gas line.

i-k' i

i l

(1) Fli/GON:

(2) MErr0D:

1 A-EQUIP!aT FAIi>UPE(EXFLAIN)

A-312?TdAL 34nIN. CR TEST B->nNJAL C-PIFUELING SCPat D-RElilATORY RESTRICTION C-A'JianTI f

E-CPERATOR TPAINING G SGAM LICENSE EXAMINATION F-AB!INISTPATIVE G-OPEPATIONAL ERRCR (Explain) u -

.