.o Putsc Serwce Electnc and Gas Company 80 Park Plaza, Newark, NJ 07101/ 201430-8217 MAILING ADDRESS / P.O. Box 570, Newark, NJ 07101 Robert L. Mitti General Manager Nuclear Assurance and Regulation May 17, 1985 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, Maryland 20814 Attention:
Mr. Walter Butler, Ntief Licensing Branch 2 Division of Licensing Gentlemen HOPE CREEK GENERATING STATION DOCKET NO. 50-354 FSAR COMMITMENT STATUS THROUGH APRIL 1985 Public Service Electric and Gas Company presently plans to issue Amendment No. ll.to the Hope Creek Generating Station Final Safety Analysis Report by July 12, 1985.
Accordingly, this letter is-provided to document the status of Hope Creek Generating Station responses to FSAR commitments which were forecasted to be responded to by April 1985.
Attachment I is a tabulation of the Hope Creek Generating Station Final Safety Analysis Report commitments for April 1985, and the corresponding resolution for each commitment.
Should you have any questions in this regard, please contact us.
Very truly yours,
$f 8505210316 850517 PDR ADOCK 05000354 A
PDR i
Hope Creek Generating Station - FSAR Attachment I Commitment Status through April 1985 C
D. H. Wagner (w/ attach)
USNRC Licensing Project Manager dD A. R. Blough (w/ attach) iI i
USNRC Senior Resident Inspector The Energy People s
MP84 123/06 1 944112 (4MI 7 81 1
l
- ~
s.
Page 1 of-2 Attachment I Hope Creek Generating Station
'FSAR Commitment Status Through April 1985
.FSAR Commitment Location Commitment Resolution 1..FSAR Section 1.14.120.2 This commitment concerns providing SORT forms for safety-related equipment.
This information has been submitted for review in
- letter, R. L. Mittl (PSE&G) to A.
Schwencer (NRC), dated April 23, 1985, in support of the HCGS SORT audit conducted May 7-10,-1985.
2.
FFAR Section 9.3.2.2.2.11 This commitment concerns providing procedures for disposal of lab samples.
This information will be provided in May 1985.
- 3. FSAR Section 9.3.2.3.2.b.1 This commitment concerns providing a plant specific procedure to assess the extent of core damage based on radionuclide concentra-tions and other parameters.
This information will be provided in May 1985.
- 4. Question / Response This commitment concerns
. Appendix:
providing a revised FSAR Ouestions 210.1 Figure 3.6-34.
This information has been provided in Amendment 10 to the HCGS FSAR.
- 5. Question / Response This commitment concerns Appendix:
updating FSAR Section 3.6 Question 210.21 tables and figures for final stress analysis rcsults.
This information will be provided in May 1985.
- 6. Question / Response
'(Same as Question 210.21 Appendix:
above)
Question 210.24 MP 85 9 6/10 1-mr
m,-
,, 61 Page 2 of 2 Attachment I Hope Creek Generating Station
- FSAR
- Commitment Status Through April 1985 IFSAR1 Commitment Location Commitment' Resolution 17.:Ouestion/ Response This commitment concerns
' Appendix:
providing procedure for Question 220.10 functional testing, channel-checks, and calibration of seismic instrumentation.
This information will be provided in J une 1985.
8.-Question / Response This commitment concerns Appendix:
providing procedures for-Question 430.40 periodic testing of Class lE safety systems.
This information has been provided
-c in Amendment 10 to the HCGS FSAR.
- 9. Question / Response This commitment concerns Appendix:
providing diesel fuel oil Question 430.94 emergency fill procedures.
This information-is available
.for review.
s
- 10. Question / Response This commitment concerns Appendix:
providing emergency DG Ouestion 430.111 operating procedure including
. conditions for no-load operation.
This information-is available for review.
- ll. Question / Response This commitment concerns Appendix:
providing local diesel Question 430.133 operation procedures.
This information is available for r e'v iew.
- 12. Question / Response This commitment concerns Appendix:
providing trip settings for Question 440.10 the leak detection system.
This information, which was scheduled to be included in Amendment 10 to the HCGS FSAR, has been revised.
This information will be provided in May 1985.
MP 85 9 6/10 2-mr 7,
~