ML20127H348
| ML20127H348 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 07/11/1974 |
| From: | Wachter L NORTHERN STATES POWER CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| IEB-74-06, IEB-74-6, NUDOCS 9211180489 | |
| Download: ML20127H348 (1) | |
Text
_
NORTHERN STATES POWER OMPANY Minneapolis, Minnesota 55401 1
o(9 t
July 11, 1974 Mr. J. G. Keppler, Regional Director Directorate of Regulatory Operations Region III United States Atomic Energy Comissian 799 Roosevelt Road Glen Ellyn, Illinois 61073
Dear Mr. Keppler:
FONTICELLO NLCLEAR GENERATING PIANT Docket No. 50-263 License No. DPR-22 In accordance with DRO bulletin No. 74-6, this report is submitted to inform you that Westinghouse Type W-2 control switches are not used in Safety Systems at the bbnticello Nucicar Generating Plant.
Yours very truly, Y
h$r.se,bh)
L. J. Wachter Vice Pres.-Power Prod.
6 System Operations
(
IJW/mm J F O' Leary, Directorate of Licensing l
cc:
G d.arnoff Minnesota Pollution Control Agency Ara e A Pryzina File i
1 I
~
\\
l l
i JUL
? g 3974 0
9211180489 740711 PDR ADOCK 05000263 G