Monthly Operating Rept for Oct 1976 for Monticello Nuclear Generating Plant Unit 1
ML20127H328
Person / Time
Site: Monticello 
Issue date: 10/31/1976
From: Mayer L, Shamla W
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 9211180485
Download: ML20127H328 (4)


Text

'{jh..QYe w

u Lo NORTNERN STATES POWER COMPANY F

M I N N E A PO L.l s, M t N N E G OT A 9 5 4 04 N

0 8

" ic' 9

November 4, 1976 m.

t 8 1976 > 10 Director, Of fice of ll3]<{[g

//

Inspection and Enforcement U S Nuclear Regulatory Commission Washington, DC 20555

Dear Sir:

MONTICELLO NUCLEAR GENERATING PIANT Docket No. 50-263 License No. DPR-22 Monthly Operating Report October 1976 4

Attached are ten copies of the Monthly Operating Report for October 1976 for the Monticello Nuclear Generating Plant.

Yours very truly, 7

L 0 Mayer, PE Manager of Nuclear Support Services

\\

g-IDM/ak IC,.

m Ed*

cc:

Director, IE-III, USNRC (1)

D! rector, MIPC, USNRC (2) s.

Y

.s vg Il.Ol6 9211180485 761031 POR ADOCK 05000263 R

PDR

2026 Rev. 3

,F/13/76 OPERATING DATA REPORT DOCKLT NO.

50 263 UNIT 1

DATE 11/1/76 C04PLETED BY W. A. Shamla TELEPl!ONE 612/295-5151, Ext. 111 OPERATING STA'IUS 1.

Reporting Period: October Gross llours in Report Period:

745 2.

Currently Authorized Power Level @Mt):

1670 htax. Depend. Capacity (hMc-NET):

536 Design Electrical Rating (hMe-Net):

545.4 3.

Power Level to hhich Restricted (if any) (hMc-Net);

None 4.

Reasons for Restriction (if any): N/A THIS SONTil YR TO DATE CU5UIATIVE 5.

Number of Hours Reactor h*as Critical...........

652.8 6,778.2 36,626.8 6.

Reactor Reserve Shutdown Hours.................

0.0 0.0 940.7 7.

Hours Generator On Line........................

626.5 6,646.1 35,383.3 8.

Unit Reserve Shutdown Hours....................

0.0 0.0 0.0

' '. Gross Thermal Energy Generated (hN1).......... 931,596.0 10,240,828.8 60.560.066,6

10. Gross Electrical Energy Generated (SNI)........ 314,200 3,467.630 17.938.680
11. Net Electrical Energy Generated (hthH).......... 297,762 3,312.036 17.133.128 12 Reactor Service Factor.........................

87.6 92.6 78.3 T'.

P.eactor Availability Factor....................

87.6 92.6 80.3-m it Service Factor............................ _ _84.1 90.8 75.6 I a Availability Factor.......................

84.1 90.8 75.6 "r.it Capacity Factor (Using 2 0C)...............

74.6 84.4 68.3 P.

tinit Capacity Factor (Using Design hMe)........

73.3 83.0 67.1 1".

Unit Forced Outage Rate........................

2.6

_1. 0 9.6

19. Shutdowns Scheduled Over Next 6 htonths (Type, Date and Duration of Each):

N/A

20. -If Shutdown at End of Report Period, Estimated Date of Startup:

)

'.025 Rev. 0 3/3/76 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-263 UNIT

_1 DATE 11/1/76 C04PLETED BY W. A. Shamla TELEPHONE 612/295-5151, Ext. 111 MONTH October DAY AVERAGE DAILY FOhTR LEVEL DAY AVERAGE DAILY POWER LEVEL (bMe-Net)

(bMe-Net) 1 537 17

-4 2

534 18

-4 3

19

-6 194 4

350 20 134 5

405 21 287 6

464 22 386 7

517 23 446 8

537 24 449 9

536 25 484 10

__ 509 26 507 il

_ _, _5 3 3 27 510 1 ;-

533 28 527 13 532 29 538 14 537 30 534 15 387 31 521 16

-5 e

i e

'tc~

a

,e DOCIGT NO. 50-263 UNIT NAME abaticello U'IT SILTfDOLGS AIO POWER REDUCTIONS DATE 11/2/76 CG@LLTED BY W. A. Shamla RENRT fO?ITH October TELEPIONE 612/295-5151' Ext. 111 7

l ?EH100 0F 2

SIfLTITING DOWN F: FORCED l DURATION Tl!E REACTOR OR NO.

DATE S:

S01EDULED' (liOUF5)

REASON (1)

REDUCING P0lfER (2)

CORRILTIVE ACTIONS /COFMENTS 31 761003 F

6.9 B

3 Ili Flux Scram received while adjustments were being made to test stroke speed of turbine control valve.

32 761015 F

111.6 A

3 Ili Flux Scram received as a resul t

of pressure control system (tur-bine control valve linkage) failute.

I N0'lE: Only 9.6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> of this f

outage are cmsidered forced hours since 102 i

hours of the outage were l

(1) RFASON (2) SEH10D Previously scheduled.

1: Manual A: Equipnent Failure (Explain) 2: Manual Scram B: m int. or Test 3: Autanatic Scram C: Refueling 4: Other (Explain)

D: Regulatory Restriction E: Operator Training and License Examination SbMlU'I: Operated as Base Loaded F.

Admir.istrati te Unit.

G: Operational t.rror (Explain)

H-Other (F': plain)

.