ML20127H328
| ML20127H328 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 10/31/1976 |
| From: | Mayer L, Shamla W NORTHERN STATES POWER CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| NUDOCS 9211180485 | |
| Download: ML20127H328 (4) | |
Text
'{jh..QYe w
u Lo NORTNERN STATES POWER COMPANY F
M I N N E A PO L.l s, M t N N E G OT A 9 5 4 04 N
0 8
" ic' 9
November 4, 1976 m.
t 8 1976 > 10 Director, Of fice of ll3]<{[g
//
Inspection and Enforcement U S Nuclear Regulatory Commission Washington, DC 20555
Dear Sir:
MONTICELLO NUCLEAR GENERATING PIANT Docket No. 50-263 License No. DPR-22 Monthly Operating Report October 1976 4
Attached are ten copies of the Monthly Operating Report for October 1976 for the Monticello Nuclear Generating Plant.
Yours very truly, 7
L 0 Mayer, PE Manager of Nuclear Support Services
\\
g-IDM/ak IC,.
m Ed*
cc:
Director, IE-III, USNRC (1)
D! rector, MIPC, USNRC (2) s.
Y
.s vg Il.Ol6 9211180485 761031 POR ADOCK 05000263 R
2026 Rev. 3
,F/13/76 OPERATING DATA REPORT DOCKLT NO.
50 263 UNIT 1
DATE 11/1/76 C04PLETED BY W. A. Shamla TELEPl!ONE 612/295-5151, Ext. 111 OPERATING STA'IUS 1.
Reporting Period: October Gross llours in Report Period:
745 2.
Currently Authorized Power Level @Mt):
1670 htax. Depend. Capacity (hMc-NET):
536 Design Electrical Rating (hMe-Net):
545.4 3.
Power Level to hhich Restricted (if any) (hMc-Net);
None 4.
Reasons for Restriction (if any): N/A THIS SONTil YR TO DATE CU5UIATIVE 5.
Number of Hours Reactor h*as Critical...........
652.8 6,778.2 36,626.8 6.
Reactor Reserve Shutdown Hours.................
0.0 0.0 940.7 7.
Hours Generator On Line........................
626.5 6,646.1 35,383.3 8.
Unit Reserve Shutdown Hours....................
0.0 0.0 0.0
' '. Gross Thermal Energy Generated (hN1).......... 931,596.0 10,240,828.8 60.560.066,6
- 10. Gross Electrical Energy Generated (SNI)........ 314,200 3,467.630 17.938.680
- 11. Net Electrical Energy Generated (hthH).......... 297,762 3,312.036 17.133.128 12 Reactor Service Factor.........................
87.6 92.6 78.3 T'.
P.eactor Availability Factor....................
87.6 92.6 80.3-m it Service Factor............................ _ _84.1 90.8 75.6 I a Availability Factor.......................
84.1 90.8 75.6 "r.it Capacity Factor (Using 2 0C)...............
74.6 84.4 68.3 P.
tinit Capacity Factor (Using Design hMe)........
73.3 83.0 67.1 1".
Unit Forced Outage Rate........................
2.6
_1. 0 9.6
- 19. Shutdowns Scheduled Over Next 6 htonths (Type, Date and Duration of Each):
N/A
- 20. -If Shutdown at End of Report Period, Estimated Date of Startup:
)
'.025 Rev. 0 3/3/76 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-263 UNIT
_1 DATE 11/1/76 C04PLETED BY W. A. Shamla TELEPHONE 612/295-5151, Ext. 111 MONTH October DAY AVERAGE DAILY FOhTR LEVEL DAY AVERAGE DAILY POWER LEVEL (bMe-Net)
(bMe-Net) 1 537 17
-4 2
534 18
-4 3
19
-6 194 4
350 20 134 5
405 21 287 6
464 22 386 7
517 23 446 8
537 24 449 9
536 25 484 10
__ 509 26 507 il
_ _, _5 3 3 27 510 1 ;-
533 28 527 13 532 29 538 14 537 30 534 15 387 31 521 16
-5 e
i e
'tc~
a
,e DOCIGT NO. 50-263 UNIT NAME abaticello U'IT SILTfDOLGS AIO POWER REDUCTIONS DATE 11/2/76 CG@LLTED BY W. A. Shamla RENRT fO?ITH October TELEPIONE 612/295-5151' Ext. 111 7
l ?EH100 0F 2
SIfLTITING DOWN F: FORCED l DURATION Tl!E REACTOR OR NO.
DATE S:
S01EDULED' (liOUF5)
REASON (1)
REDUCING P0lfER (2)
CORRILTIVE ACTIONS /COFMENTS 31 761003 F
6.9 B
3 Ili Flux Scram received while adjustments were being made to test stroke speed of turbine control valve.
32 761015 F
111.6 A
3 Ili Flux Scram received as a resul t
of pressure control system (tur-bine control valve linkage) failute.
I N0'lE: Only 9.6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> of this f
outage are cmsidered forced hours since 102 i
hours of the outage were l
(1) RFASON (2) SEH10D Previously scheduled.
1: Manual A: Equipnent Failure (Explain) 2: Manual Scram B: m int. or Test 3: Autanatic Scram C: Refueling 4: Other (Explain)
D: Regulatory Restriction E: Operator Training and License Examination SbMlU'I: Operated as Base Loaded F.
Admir.istrati te Unit.
G: Operational t.rror (Explain)
H-Other (F': plain)
.