Monthly Operating Rept for Aug 1976 for Monticello Nuclear Generating Plant Unit 1
ML20127H280
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 08/31/1976
From: Mayer L, Shamla W
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 9211180472
Download: ML20127H280 (4)


Text

.

NORTHERN 5TATES POWER COMPANY MlNN E A POLI S. MIN N E S OTA 95408 c,: ' \\ ?un September 10, 1976 g

6:

SEP201976> F3 Director, Office of E'8yggrpon Ni s.mn Inspection and Enforcement 7

U S Nuclear Regulatory Commission Y

Washington, DC 20555

Dear Sir:

HONTICELIA NUCLEAR GENERATING PIANT Docket No. 50-263 License No. DPR-22 Monthly Operating Report August 1976 Attached are ten copies of the Monthly Operating Report for August 1976 for the Monticello Nuclear Generating Plant.

Yours very truly, ho f

L 0 Mayer, FL Manager of Nuclear Support Services LOM/ak cc: Director, IE-III, USNRC (1) 9536 Director, MIPC, USNRC (2)

'\\,

j d

b l

C 50 h

T9 i

Y U %Y

~

9 e

s E

j L

9211180472 760831 ADOCKOSOOg3 l

DR

<w w

~, - -

2026.

Rev. 3

?/13/76 OPERATING DATA REPORT DOCKET NO.

50-263 UNIT 1

DATE 9/7/76 Ca@LETED BY W. A. Shamla TELEP110NE 612/295-5151, Ext. 111 OPliRATING STAniS 1.

Reporting Period:

August Gross !!ours in Report Period:

744 2.

Currently Authorized Power Leyel (hMt):

1670 htu. Depend. Capacity (hMe-NET):

536 Design Electrical 13ating OMe-Net):

545.4 3.

Power Level to Which Restricted (if any) (hMe-Net)i N/A 4

Reasons for Restriction (if any):

N/A T111S FONTil YR TO DATE CUSU1ATIVE 5.

Nttnber of flours Reactor h*as Critical...........

570.6 5,413.4 35,262.0 6.

Reactor Reserve Shutdown Hours.................

0.0 0.0 940.7

't. Hours Generator On Line........................

554.3 5,311.2 34,048.4 h

Unit Reserve Shutdown IIours....................

0.0 0.0 0.0 9.

Cross Therraal Energy Generated (bNi)...........

825,249.6 8,179,-478.4 58,498,716.2 30.

Grcss Electrical Energy Generated ('WI)........

274,880 _

2,773,200 17,244,250 11.

Net Electrical Fnergy Generated (bMI).......... _259,924 2,652,632 16,473,724

'7 Reactor Service Factor.........................

76.7%

92.5%

77.8%

1 ':..

R:acter Availability Factor....................

76.7%

92.5%

79.9%

~1 it Savice Factor............................

74.5%

90.7%

75.1%

13 II ' t Ava 21abilit y fac tor.......................

74.5%

90.7%

75.1%

' ~. Th : t Ct.paci ty Factar (Using MDC)...............

65.2%

84.5%

67.8%

17.

' inia Capacity Facter (Using Design LMe)........

64.1%

83.1%

66.6%

M.

Unit Forced Outige Rate........................

4.9%

_ 0.7%

9.9%

19.

Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

N/A 20.

If Shutdown at End of-Report Period, Estimated Date of Startup:

1 l

2025 licy. 0 3/3/.76 AVERAGE DAILY UNIT POWER LEVEL DOCKET 10, 50-263 UNIT 1

DATE 9-9-76 CO@LETED BY W. A. Shamla TELEPtONE 612/295-5151, Ext.111 1

St.ATil Am, DAY AVEDAGE DAILY IMER LEVEL DAY AVERAGE DAILY POWER LEVEL (f W Net)

&Bie-Net) 1 aos 17 q7 g 2

son 18 qu 3

343 19 gz, 4

- 6_

20 Rin 5

-4 21 i;g 6

..._ 4 22 gi j 7

, _,._1 23 qu 8

.a 24 Ron 25 gza 9

_5 10

_..._. 64

'26 su 27 qzy U

... 2 66 28 770 I

.__ _.322, 29 so 33

... 4 58____

30 zgo Ii

... K1 n 31 4an li 36 8_ _

x 16

._.501

2427-

77. 0 4 76-DOCKET NG. 50-263 UNIT NAME Monticello UNIT.SUfD0hWS AND POKER REDUCTIONS DATE 09/08/76 i

COIPLETED BY W..A. Shamla REFORT lOND{

AUGUST TELEPIDNE 612/2';5-5151 i

Ext. 111 l

l MEI110D OF M-i SUITING D0hN '

F: ' FORCED I

IURATION

' DIE REACIOR OR.

.O.

DATE S:

SCHEDULED (ifURS)

REASON (1)

REDtK'I?C IUhTR (2)

CORRILTIVE ACTIONS /COME.NTS i

,_.._.___.m__

,27 l 760803 S

160.9 B

1

. Plant outage taken to repair 8

leaks in feedwater heaters.

'28 760814 S

0 B

4 Power reduced to 50% of' rated' for stop valve limit swi'tch l

repair and feedwater pump seal j

cooler leak. Power reduction.

i j

accomplished via manual reactor

.l recirc flow reduction.

l 28.8 H

3 Automatic Scram initiated by t

i 29.

760828 F

[

l reactor high neutron' flux.

.I.

4

.(2) Em (1) REASON I

l

.A: Equipment Failure (Explain) f 1

i B:. Maint. or Test 3: Autanatic Scram 4: Other (Explain) i gu ory Restriction

~ E: Operator Training and Licente Examination STMUY: Operated.as base loaded

.F: Ad:oinis t rati.'c

{

unit.except for load G: Operational Error (Explain) following during first 11: Other (T'. plain) three days of the month 1

.