February 13, 1978 If f; p
~.. - )
.a, v.,' )][t<a,. *% ~}j
,,e a
'i.(*[ % g/]/
Director of Nuclear Reactor Regulation i
U S Nuclear Regulatory Comission A
M; ;d"p '2 Washington, DC 20555 J.,
MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Replacement of Spent Fuel Storage Racks - Supplement 4 On August 17, 1977 we submitted a document entitled, " Design Report and Safety Evaluation for Replacement of Spent Fuel Pool Storage Racks, August 1977".
Attached is Supplement 4 to that report. Because of the number of supplements to the initial report, a record of current pages is provided as part of Supplement 4.
Supplement 4 documents the type of neutron absorber material verification test that will be done at the reactor site.
The traditional neutron source and neutron detector technique replaces the statistical technique previously proposed. Wording changes are identified by side-lining.
As was done with previous supplements, please file Supplement 4 as follows:
1.
Remove the cover page and Page 26 of the August 17, 1977 report (which should now be filed with Supplements 1 through 3 incorporated).
2.
Insert the attached cover sheet, record of current pages and pages 26 and 26A which are identified as Supplement 4, February 1978.
The record of current pages should imediately follow the cover sheet.
3.
Pages removed in step 1 above should either be discarded or attached to the end of the updated report for future re fe rence.
If the latter option is exercised, mark each of the obsolete pages conspicuosuly with the words,
" SUPERCEDED - FEBRUARY 13, 1978.
l L0 Y'05, hjo 780470045 g
(
9211180466 780213 i
PDR ADOCK 05000263 P
r
)
NORTHERN CTATED POWER COMPA.,(
Dire'etor of Nuclear Reactor Regulation Page 2 February 13, 1978 4.
Verify that the report is complete and up to date by comparing it to the record of current pages.
0 L 0 Mayer, PE Manager of Nuclear Support Services Lal/FmV/deh cc:
J G Keppler G Charnoff
i i
s MOWICELLO NUCLEAR GENERATING PLANT i
4 Docket No. 50-263 License No. DPR-22 August 1977 l
i l
DESIGN REPC3T AND SAFETY EVALUATION FCR REPLACEMENT OF SI'ENT FUEL POOL STORAGE. RACKS 1
i t
I.
l l
Incorporating:
Supplement 4 February 1978
)
RECORD OF CURRENT PAGES Page Status
- Cover Sheet Supplement 4 - February 1978 Record of Current Pages Supplement 4 - February 1978 Table of Contents 1
2 3
4 5
6 7
Supplement 1 - December 1977 8
9 10 11 12 13 14 Supplement 3 - Jaa uary 1978 15 16 17 18 19
??
21 22 Supplement 1 - December 1977 23 Supplement 1 - December 1977 24 25 Supplement 1 - December 1977 25a supplement 1 - December 1977 25b Supplement 1 - December 1977 26 Supplement 4 - February 1978 26a Supplement 4 - February 1978 27 28 29 30 31 32 33 34 35 Supplement 2 - January 1978
- No entry indicates that the original page submitted on August 17, 1977 is the current version.
1 Supplement 4 February 1978
.-.=.
(
_ RECORD OF CURRENT PAGES (Continued)
Page Status 36-37 38 39 40 41 42 43 44 45 Superceded pages (optional):
i cover sheet cover sheet Supplanent 1 - December 1977 cover sheet Suppler.ent 2 - Janu.ry 1978 cover sheet Supplem.nt 3 - January 1978 7
14 22 23 25 26 35 1l f
i Supplement 4 February 1978
l g
i 4.4 Material Considerations All structural material used in fabrication of the new HDFSS is type 304 stainless steel. This material was chosen due to its corrosion resistance and its ability to be formed and welded with consistent quality.
Boral* plates, used as a neutron absorber, are an integral non-structural part of the basic fuel storage tube. These plates are sandwicted betreen the inner and outer wall of the storage tube and are not subject to dislocation, deterioration or removal, either deliberate or inadvertent. The inner ar.3 outer walls of the storage tube are welded together at each end, thereby isolating the Boral plates from direct contact with Spent Fuel Pool (SPP) water. At normal pool water operating temperature there is no significant deterioration or corrosion of stainless steel or Boral.
Specifications were develoned specifically for the liigh Density Fuci Storage System which sepose requirements to implement and follow accepted and proven industry standards duran; the design, procure-meat, fabrication, installation and testing of the storage system.
Periodic audits of the various facilities and practices are performed by certified quality assurance pt.rsonnel to ensure that these QA/QC requirements are being met. All welding and nondestructive examination (NbE) is done in accordance with ASME Boiler & Pressure Vessel Code and the American Society for Nondestructive Testing (ASNT) requirements.
Storage module components are assembled and welded into modules in special fixtures to maintain a tight dimensional tolerance. Each storage position is then checked with full length gauges to assure proper clearance between stored fuel bundles and storage tube walls.
To provide assurance that specificatior. Boral sheet is utilized during tube fabrication, a quality control program is in effect at the manufacturer's{acility. Samples of each Boral sheet are analyzed to determine the B 0 content. These data are evaluated to verify that the samples are statis Buralplateandthat*{icallyrepresentativeoftheentireareaofthe
' content, at a 95% confidence level, meets or exceeds specification requirements. Angysesarealsoperformedto establish the correlation between the B content and the thickness of the Boral sample. The Boral sheets are dimensionally inspected and the thickness data are statistically analyzed to verify the sheet meets the minimum thickness requirement over its entire area at a 95% confidence level.
Thesethicknessdataarealsocomparedgththecorrelation data to provide additional assurance that the B content meets or exceeds specification requirements. Before each piece of Boral is inserted into a tube assembly it is verified that each inspection has been successfully performed.
- Product of Brooks & Perkins. Inc consisting of a layer of B C-Al matrix 4
bonded between two layers of aluminum.
Supp).ement 4 26 Febr ta ry 1978
~ __
Thepresenceofthenkutronabsorbermaterialinthefabricated fuel storage module will be verified at the reactor storage-pool site by use of a neutron source and neutron detectors. There will be a permanent record of all test results that will provide a com-parison between the test results for each Boral eheet and the neutron absorption rate taken where there is no Boral sheet. A significant increase in the neutron absorption rates will verify the presence of Boral. Module suberiticality calculations have demonstrated K rg <0.90 at a 95% confidence level with any four complete Boral e
sheets missing. A module will be accepted unless measurements indicate that five or more Boral sheets are not present.
Boral has corrosion resistant properties similar to standard aluminum sheet. Corrosion data and industrial experience confirm and Boral have acceptable corrosion resistant properties,that aluminum for the proposed application. Although experience indicates that it is un-necessary, an inservice test program will be conducted. This program consists of periodically removing and examining sampics of Boral plate which have been suspended in the storage pool.
- USNRC Safety Evaluation for Yankee Rowe, dated 12/29/76 page 4, Structural and Material Considerations.
26a Supplement 4 February 1978
..