ML20127G913
| ML20127G913 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 05/31/1974 |
| From: | Jacobson G, Neils G NORTHERN STATES POWER CO. |
| To: | Chapman S US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 9211170460 | |
| Download: ML20127G913 (4) | |
Text
-.
'o.
mess =
rJe NONTHERN
&TATEC P O W K Ft COMPANY MIN N s A po t.s e, u iN N E G OTA 55400 June 10, 1974 M
,[h) dh gy \\
k;b
/
p k
\\(
4 Office of Plans & Schedules 7,
($
j N
L.
3 Directorate of Licentsing 3
WasMngton, DC 20545 4)3 hP jd M gg]4 F 1 U S Atomic Energy Cot:snisuion
'I C'I
.C a
3 yp j
(. 't Attention:
tr S Chapman
/
CuntAcmce:
r1 7
MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 Licen9e No. DPR-22 Monthly Operating Data May 1974 In accordance with the request of February 19, 1974 from Mr L Manning Muritzing, the attached operating data for the month of May 1974 from the Monticello Nuclear Generating Plant is provided.
Very truly yours,
- f. y I c L 4,
l G H Neils General Superintendent of Nulecar Power Plant Operation GIIN/ to ec: J G Keppler l
Telecopied to Mr S Chapman l.
Juni 10, 1974 Attachments REGULATORY DOCKET FILE COPY 5313 9211170460 740606 PDR ADOCK 05000263-R PDR
2025 Ibn%4. cello Nuclear
)
UNIT Cenepting Plant inTE June 6.197L/
z CCt@LERD BY W((( }> n/*k-D
/
DAILY l'1W.T P0hT.R OlffiUT i
)
},1W111 bhy 1974 4
-nd hY(
A1 TRACE Il0UI1Y We g
@ M F.H N We 1
-1 25 4 4_.8_..__
5 2
-1 26 468 _
27 495 3
. _._ - 1 l
a
-1 28 483 3
484 4
90 5
-2 30 473 6
.. _ _.4, g
31 5 2,4__,
7 g--_
8 9
._._A.,
10
-4
-4 11 12
-e' 13
_, _,, - 3 14
-3 15
-4 i
16 4_,__
17
-4 i
18
-5 19
-9 20
-5 21 35 22 223 l
23 293 _,
24
_ 375_ _
I a.
.....i..
,c,
2016 IJN1T NAhtE MONrICI1i.o NWl. EAR CENFPAT1hC MANT DNIE
.2Dnc h,19L4
-4
/
[C/[ '
7 <g[yw C(M'lEriJ> 1;Y I
l OPERATING STA1US 1.
Rtl0RTING PERIOD: 0000740501 TO,,J,4n0740431 GROSS IDURS IN RE10RTING PERIOD:
744 Pool Winter Rating, 559 (VCA test) 2.
CURRIXFLY AUHPRIFD TWER LIVEL Wt 1670 bhb NET M
3.
POWER LE\\'ll TO 1.1110111ESTRICTED (IF ANY):
4.
RFASONS FOR RI.51RICTIONS (IF ANY):
1111 S CUMULATIVE FD!mi YR-TO-DATE TO DATE 5.
IIM5 Id.icht? OS CRITICAL
,jjg 2,095 18,532 6.
!P. i ;iD
?c I int 251 1,942 17,789 7.
CROES 1 "o
i.JR GFNFPATED (bhll) 30L152
_.2,624,004 27,135,215 8.
CROS:; F! ?~nt b TOLTh GEhTRATED (hb10_ _107,510 902,920 9,293,150 863,212 8,881,010 9.
NI T Fl. ~ ~.DJ '.. v.T n CF.hTRATi'D (>b1!)
101.52_4_
10.
RTY'a "71La Ii.iTY FACTOR (1) 45.6%
57.8%
72.4%
69.5%
- 11. PUtNT AVAILu illIY FAcr0R (2) 33,7%
53.6%
42.6%
62.1%
- 12. PLAhT CAPACITY FACTOR (3) 24.4%
03.1%
16.2%
- 13. FORCED OUTAGE PATE (4) 00.0%
- 14. SlUITEC S SQ5ETUIED TO DEGIN IN NEXT 6 FDNTilS (STATE TYPE, DATE, AND DllRATION OF FAQl): Tie in of modified off gas system - June 7-9,1974 15.
IF ElUITGd AT END OF REPORT PERIOD, ESTIbi\\TED DATE OF STARRIP:
- 16. PLWrS IN TEST STATUS (DELE 1T.D)
(1) REACIOR AVAILABILITY TACTOR = IlOURS REACTOR WAS CRITICAL
- 100 CrD55 TIDURS IN RTIURTINCITIT.JDU (2) PLANT AVAILABILITY FACTOR = Il00RS GENTRATOR ON-LINE
- 100 GMS~lIQUh5 IN RETURTITNTDU (3) PLANT CAPACITY FACT?R = NET ELECTRICAL POhTR GENERATED
- 100 hTF DDDN5'lHTED* Gross IDDRS IN REPORTING PERIOD (4) FORCED OltrAGE RATE = FORCED CUTAGE 110URS
- 100 IMIRS CETtETDR ON-LINii + FOIKED OlffAGE IKURS s
2027 FDNTICELLO NUCLEAR UNIT NtoiE GENEilATING PLBT S'M niN Completed refueling outage and returned to service DATF' June 6,1974 on May 21,1974. Operated as CmPLETED BY G H Jacobson base loaded unit.
REPORT 3DATH May 1974 PLLT SLTJ3.? S TfPE M'11DD OF F-FORCED DLTv1 TION SL'ITING D33 NO.
DATE S-SCIE'JLED 3 (HOUPS)
REAS'N (1)
COI4ENTS r
2 740315 S
492.5 C
A Completed refueling outage (1) PL\\ SON:
(2) LEDDD:
A-EQUII? EAT FAILURE (EXPLAIN)
A-M\\NUAL B-M\\IN. OR TEST B-MWJAL C-REFUELING SCRAM D-REGULATORY RI1HRICTION C-AUlTM\\TI E-OPERATOR TRAINING G SCRAM LICENSE EXAMIN\\ TION i
F-ABilNISTRATIVE G-OPERATIONAL ERROR (Explain)
.~