Forwards marked-up Tech Spec Changes for Incorporation Into Tech Specs for Issuance W/Full Power License.Tech Specs Cover Seismic Monitoring Instrumentation & Offsite Organization
ML20127G763
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 05/17/1985
From: Koester G
KANSAS GAS & ELECTRIC CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
KMLNRC-85-120, NUDOCS 8505210137
Download: ML20127G763 (6)


Text

-

KANSAS GAS AND ELECTRIC COMPANY THE ELECTAC COMPANY GLENN L.

NOESTER veCE PassiOENT mucLEAa May 17, 1985 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. lAlclear Regulatory Comnission 7

Washington, D.C.

20555 KMLNRC 85-120 Re:

Docket No. SIN 50-482 Subj: Technical Specifications

Dear Mr. Denton:

Transmitted herewith are changes to the Wolf Creek Technical Specifications.

Kansas Gas and Electric Conpany (KG&E) requests incorporation of these changes into the Wolf Creek 'nx:hnical Specifications for issuance with the Wolf Creek full power license.

Yours very truly, i

Glenn L. Koester Vice President - Nuclear GLK: dab xc: PO'Connor (2), w/a JCumnins, w/a l

\\

W g5210137850517 8

p ADOCK 05000482 PDR 201 N. Market -Wichita, Kansas - Mail Address: RO. Box 208 I Wichita. Kansas 67201 - Telephone: Area Code (316) 261-6451

r-STATE OF KANSAS )

) SS CITY OF WICHITA )

Glenn L. Koester, of lawful age, being first duly sworn upon oath says that he is Vice President - Nuclear and an Officer of Kansas Gas and Electric Campany; that he has read the foregoing document and knows the content thereof; that he has executed the same for and on behalf of said Company with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.

By M

Glenn L. Koester Vice President - Nuclear SUBSCRIBED and sworn to before me this day of

,1986 AnJLon9w Sotar Pdblic

{

g $ - g.

Expiration Date h /h k

' Py9

<<> l

  • 3 %

+/

1

~%,7E<

,,,....0 VS,$

Attachment to KMLNRC 85-120 TABLE 3.3 SEISMIC MONITORING INSTRUMENTATION MINIMUM MEASUREMENT INSTRUMENTS INSTRUMENTS AND SENSOR LOCATIONS RANGE OPERABLE 1.

Triaxial Peak Recording Accelerographs a.

Radwaste Base Slab i 1.0g 1

b.

Control Room i 1.0g 1

c.

ESW Pump Facility i 1. 0g 1

d.

Ctmt Structure.

1 2.0g 1

e.

Auxiliary Bldg. ~SI' Pump Suctions 1

f.

SGB Piping

2. 0g t s.o g.

1 g.

SGC Support i

g 1

5.

Triaxial Time History and Response Spectrum Recording System, Monitoring the Following Accelerometers (Active) a.

Ctmt. Base Slab 1.0g 1

b.

Ctmt. Oper. Floor i 1.0g 1

c.

Reactor Support i 1.0g 1

d.

Aux. Bldg. Base Slab i 1.0g 1

e.

Aux. Bldg. Control Room Air Filter i 1.0g 1

f.

Free Field 1 0.5g 1

C,

3.

Triaxial Response-Spectrum Recorder (Passive)

Ctmt. Base Slab 1.0g 1

4.

Triaxial Seismic Switches ACCELERATION LEVEL North East Vertical a.

OBE Ctmt. Base Slab 0.06g 0.06g 0.06g 1

b.

SSE Ctmt. Base Slab 0.15g 0.15g 0.16g l'

c.

OBE Ctmt. Oper.'F1.

0.07g 0.07g 0.07g 1

d.

SSE Ctmt. Oper. F1.

0.16g 0.17g 0.16g 1

e.

System Trigger 0.01g 0.01g 0.01g 1

WOLF CREEK - UNIT 1 3/4 3-45

1 Justification for Change to Technical Specification Table 3.3-7 WCGS has' indication that the RCS piping accelerations for normal plant operation may exceed the range of the-accelerometer presently installed.

Therefore, the steam generator pipe peak.

Recording accelerometer with range of i 2.0g will be replaced by an accelerometer with a range of i 5.0g.

The safety analysis indicates that the-increased range-of the replacement accelerometer represents an increase in conservation and has no effect on safety or accident consequences.

P

_ _ _ _ rg uews of an W el<d e-na.4ur e., Me V.u. Pres.lc.h - Actene co-mw.c A.5 p

l CHAIRMAN OF THE BOARD d.v ecAty v:% de Pres;. led M cher-cos cc a,_ h <.cd.

l s

A m

8 a

i GROUP VICE PRESIDENT i

I

- TECHNICAL SERVICES c-5 l

l a

L____

VICE PRESIDENT NUCLEAR NUCLEAR SAFETY i

REVIEW COMMITTEE SISRQ I

I da DIRECTOR DIRECTOR ENGINEERING AND DIRECTOR NUCLEAR TECHNEAL S&MCES OUAUTY OPERATIONS i

l I

I I

I I

I

)

N C" " " '

SUPT.

MANAGER MANAGER MANAGER MANAGER MANAGER MANAGER MANAGER 4MAMR Ats NUCLEAR OPERATIONS NUCLEAR PLANT MANAGEMENT GUALITY ADMINISTRATIVE ASSURANCE CONSTRUCTION TME mm MMM NN NE su.Yaiunwor ;

WCGS f

l PMNT MANAGER "A"

MANAGER NUCLEAR ASSURANCE E

(HOME OFFICO FIGURE 6.2-1 l

OFFSITE ORGANIZATION 1

.g

f
O.

f,;

HANP MNGR apt. of

-Spt. of Inguldoty, Cuality.

-Spt. of Maintmare apt. of CDErdifs

'Ibtinbal S@CEt

-&pt. Of Plmt S ptrt ad Mnhistrdive Savices I

-Maht Saybes Spr

-(ts Omi -(bs #

-Beactor ByhBErig

-Fire Protmtir?

-Enupt.y Planig

&ift apetvisor

-Maht R part apr

-Spavisig Ctr

-Irstnm:nt & Ontrols

-Saarity*

DocunEnt Ontrol I

-axtabal

-Ibactrr Cpt y tas

- Electrbal

-Utility IWi[w

-BGEultS BUh8ErIU

-Mnhhtrakin

-Chenistry

-Ops &mipdat -

57: meg, PlanipM

-}balth Ihysis*

c f*

-123r/4tcialist

-arveillare omi

  • Rr tadnbal e of m imedida nature the reprtive idivibal reports dirEctly to the Plmt Mmajer.

FIhis p:sitin rapirs m SD lbEEEe.

FICHE 6.2-2 thit Orgmizatin