ML20127G690
| ML20127G690 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 01/11/1993 |
| From: | Link B WISCONSIN ELECTRIC POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML19303F191 | List: |
| References | |
| CON-NRC-93-007, CON-NRC-93-7 VPNPD-93-008, VPNPD-93-8, NUDOCS 9301220041 | |
| Download: ML20127G690 (1) | |
Text
_
- - -. m Wisconsin 1 Electnc POWER COMPANY 231 W Mchgan. PO Box 2046. Mikeukee Wi 53201 (414)221 2345 VPNPD-93-008 NRC 007 January 11, 1993 E:
Document Control Desk Z
U.S.
NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, DC 20555
}
Gentlemen:
7 DOCKETS 50-266 & 50-301 i
EMERGENCY PLAN PROCEDURES
?
POINT BEACH NUCLEAR PLANT, UNITS 1 &2 3
Enclosed are copies of revised procedures to the Point Beach i
Nuclear Plant Emergency Plan Procedures Manual.
The procedures consist of changes which should be filed in your copies of the subject document in accordance with the attached instructions.
Please note that the procedures containing names and telephone b
numbers are stamped "NRC ONLY, NOT FOR PUBLIC DISCLOSURE."
A copy 4
of the affected procedures, with names and numbers deleted, are y
provided and are stamped " NAMES AND TELEPHONE NUMBERS DELETED" to assure confidentiality and facilitate your distribution to the public documents room.
2 Sincerely,
(
Bob Link y
Vice President Nuclear Power
=
RJC/jg Enclosures
=
cc:
NRC Resident Inspector (w/o/a)
NRC Incident Response Center, Region III (2) j 21015~:
3 9301220041 930111 Nf. f/2 I
(( [ '
[!/
/ //[
hy 9
PDR ADOCK 05000266 lI
_ F PDR p
o
.,yy,,g
'