South Carolina Electric and Gas Co.
Docket No. 50-395 g
Summer License No. NPF-12 The following violation was identified during an inspection conducted on March 4 - 8, 1985.
The Severity Level was essigned in accordance with the NRC Enforcement Policy (10 CFR Part 2, Appendix L).
t g
10 CFR 50, Appendix B, Criterion XVI, requires establishing measures to 1
R assure that conditions adverse to quality are promptly identified and
?
corrected.
The accepted QA program commits to Regulatory Guide 1.33 which i
endorses ANSI N18.7-1976, Administrative Controls and Quality Assurance for the Operational Phase of Nuclear Power Plants.
Section 5.2.16 of this standard states that an evaluation shall be made and documented concerning a
the validity of previous tests and acceptability of devices previously tested from the time of the previous calibration when calibration, testing, or other measuring devices are found out of calibration.
5 Contrary to the above, Station Administrative Procedure SAP-141, Control and i
Calibration of Measuring and Test Equipment, Revision 2, and other controlling 3
s procedures place no time constraint on evaluating the safety implications when measuring and test equipment fails calibration.
In the I&C shop, 62 of 427 reports filed from December 1983 to December 1984 were not completed 5
E within three months of the initial discovery of an out-of-calibration
=
condition.
r This is a Severity Level IV violation (Supplement I).
I w
E Pursuant to 10 CFR 2.201, you are required to submit to this office within 30 5
days of the date of this Notice, a written statement or explanation in reply, j
[
including:
(1) admission or denial of the alleged violation; (2) the reasons g
for the violation if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid
=
further violations; and (5) the date when full compliance will be achieved.