PIIILADELPlilA ELECTRIC COMPANY NUCLEAR GROUP llEADQUARTERS 955-65 CHESTERBROOK BLVD.
WAYNE PA 19087 5691 (215) 640#1t10 January 8, 1993 NUCLEAR SERVICES DEPARTMENT Docket Nos. 50-277 50-278 License Nos. DPR-44 DPR-56 U.S. Nuclear Regulatory Commission Attnt Document Control Desk Washington, DC 20555 SUBJECT Peach Bottom Atomic Power Station, Units 2 and 3 Technical Specifications Change Request 88-08, Supplement 2, Request for Additional Information Dear Sir Philadelphia Electric Company (PECo) hereby submits Technical Specifications Change Request (TSCR) No. 88-08, Supplement 2, in accordance with 10 CFR 50.90, requesting a change to Appendix A of the Peach Bottom Facility Operating Licenses.
The proposed changes concern rewording of two of the surveillance requirements proposed in our original TSCR 88-08, submitted January 31, 1992.
The two surveillance requirements (SR), 4.9.A.1.2.f.2 and 4.9.A.1.2.f.3 concern the Residual Heat Removal (RHR) pump load reject and the continuous load reject, respectively.
The proposed change will clarify the initial voltage that must be maintained when the loads are rejected, and the load reject value.
j Further, these two surveillance requirements were proposed to be performed on a 24 month frequency as part of PECo's conversion to 24 month fuel.
In our September 28, 1992 submittal, we requested that these two surveillance requirements be renumbered 4.9.A.1.2.g.1 and 4.9.A.1.2.g.2, and provided a retyped page 218d.
Because both the January 31, 1992 and the September 28, 1992 requests are still pending we have provided l
two copies of page 218d; one showing the SR as an 18 month i
frequency and the other as a 24 month frequency.
i l to this letter describes the proposed changes and provides justification for the changes.
contains the revised Technical Specification pages.
. n n n r. r.
9301210222 930108 PDR ADOCK 05000277 sp { i i
p PDR J
A
Documsnt Control D3sk January 8, 1993 PB U/2&3 TSCR 88-08, Supp.2 Pago 2 If you have any questions regarding this matter, please contact us.
Vory truly yours, ctl k b W
G. J. Beck, Manager Licensing Section
Enclosures:
Affidavit, Attachment 1, Attachment 2 cc T. T. Martin, Administrator, Region I, USNRC J. J. Lyash, USNRC Senior Resident Inspector, PBAPS W.
P. Dornsife, Commonwealth of Pennsylvania
+
i l
i l
COMMONWEALTH OF PENNSYLVANIA:
4 ss.
i COUNTY OF CHESTER i
G.
R. Rainer, being first duly sworn, deposes and says:
1 1
I That he is Vice President of Philadelphia Electric Company; the Applicant herein; that he has read the attached j
Technical Specifications Change Request (Number 88-08, Supplement for Peach Bottom Facility Operating Licenses DPR 44 and DPR-56, 2) i l
and knows the contents thereof; and that the statements and matters 4
)
set forth ti.3 rein are t.ue and. correct to the best of his knowledge, information and belief.
s i
i
.hta k
) / cW4+1 jj
..u Vice President 1
4 4
i Subscribed and sworn to beforemethis[
day
' )aw
[ 1993.
of l
f
)
1 s
um,,,
n_,, m _4 -
~
Erico A Sare:n.Ncery Pdjo Tn@Twn ChesterCOpty My CGNS4.Yn E4Am July 10,1905 4