ML20127G205

From kanterella
Jump to navigation Jump to search
License Amend Request 92-07 to License NPF-87,revising TS to Reduce Frequency of Turbine Valve Testing from Every 14 Days to Every Six Wks
Date released: 05/20/2020 Download: ML20127G205


Engineering Rept ER-504, Probability of Turbine Missiles from 1,800 R/Min Nuclear Steam Turbine-Generators w/44 Inch Last Stage Blades.
ML20127G212
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 10/31/1975
From:
ALLIS-CHALMERS POWER SYSTEMS, INC.
To:
References
Download: ML20127G212 (112)
Proposed Tech Specs,Reflecting Turbine Valve Test Reduction, Including NUREG-1366 (Draft) Section 5.13, Turbine Overspeed Protection Sys (Pwr,Bwr), Pages 33,34 & 35
ML20127G207
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 11/10/1992
From:
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
References
RTR-NUREG-1366
Download: ML20127G207 (8)
License Amend Request 92-07 to License NPF-87,revising TS to Reduce Frequency of Turbine Valve Testing from Every 14 Days to Every Six Wks
ML20127G200
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 11/10/1992
From: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-NUREG-1366
Download: ML20127G200 (10)