ML20127G101

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1992 for Millstone,Unit 1.W/
ML20127G101
Person / Time
Site: Millstone 
Issue date: 12/31/1992
From: Newburgh G, Scace S
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
MP-93-53, NUDOCS 9301210145
Download: ML20127G101 (5)


Text

_. -__

NOKrHEAST UTILITIES o~a' o"= S* *a 5"* *"" c "*"

72Inf.$Y[aY $ DieitN N EC N 8n7 P.O. BOX 270 g

NOe:YItE[Es5 icN'oNany HARTFORD CONNECTtCUT 06141-0270 2

turtnea., Nwear Energy Cci@any (203}$$$.5000 Re: 10CFR50.7)(a)

January ll, 1993 HP-93-53 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Reference:

Facility Operating License DPR-21 Docket No. 50-245

Dear Sir:

In accordance with hiillstone Unit 1 Technical Specification 6.9.1.6, the following monthly operating data report for h1illstone Unit 1 is enclosed. One additional copy of

- the report is enclosed.

Very truly ycurs, NORTHEAST NUCLEAR ENERGY COMPANY FOR: Ste hen E. Scace

' pe' President - hlillstone Station-I BY:

Fred R. Dacimo

~

hlillstone Site Services Director SES/GSN:ljs

Enclosures:

(4) cc:

T. T. hlartin, Regional Administrator Region 1 J, W. Andersen, NRC Project hlanager, hiillstone Unit No.1 P. D. Swetland, Senior Resident inspector, hiillstone Unit Nos.1, 2, & 3 93012101d5 921231 PDR ADOCK 05000245

[hf

-o q{

. -. _... ~. - _ _.. _..__ _. _ _

AVEllAGE DAILY UNIT POWElt LEVEL

~.

4 DOCKET NO. 245 UNIT hlillstone 1 DATE 930107 COSIPLETED IW G. Newburgh j

TELEPlIONE (203)447-1791 -

Ext. :4400.

AIONTih December 1992 AVERAG E D AllJ l'OWElt LL. EL AVEllAGE DAllJ l'OWER LEVEL DAY (h1We-N et)

DAY

( AlWe-Net )

1 648 17 642 2

534 18 l 642 3

251 19 642 4

315 20 642 5

642 21 642 6

643 22 397 7

643 23 640 8

642 24 642 9

635 25 642 10 641 26 642 11 583 27 642 12 641 28 642 13 641 29 643 14 637 30 639 15-642 31 643-16 642

~

INSTItUCTIONS On this format, list the average daily unit power level in MWe-Net for et

'ay in the reporting month. Compute to the nearest whole megawatt.

l l

l l.

OPERATING DATA REPORT -

=.

C DOCKET NO. 50-245

=

4-DATE 930107 COAIPLETED IW G. Newburgh TELEPHONE (203)447-1_791 Ext.: 4400 OPERATING STATUS L Unit Name:

Millstone 1 Notes 2.

Reporting Period: December 1992 3.

Licensed Thermal Power (MWt): 2011 4.

Nameplate Rating (Gross MWe): 662 5.

Design Electrical Rating (Net MWe): 660 6.

Maximum Dependable Capacity (Gross MWe): 684 7.

Maximum Dependable Capacity (Net MWe): 654 8.

If Chances Occur in Capacity Ratings (ltems 3 Through 7) Since Last Report, Give Reasons:

N/A 9.

Power Level To Which Restricted, if Any (Net MWe): N/A

10. Reasons For Restrictions, if Any: N/A This Month Yr-To-Date Cumulative
11. Hours in Reporting Period 744 8,874 193,656
12. Number Of Hours Reactor Was Critical 728.7 5,974.9 149,469.4
13. Reactor Reserve Shutdown Hours 0

0 3,283.3

14. Hours Generator On-Line 724.4 5,909.5 145,775.8
15. Unit Reserve Shutdown Hours 0

0 93.7-16, Gross Thermal Energy Generated (MWH) 1,397,192 11,351,486 273,866,873

17. Gross Electrical Energy Generated (MWH) 470,527 3,792,891 92,410,996
18. Net Electrical Energy Generated (MWH) 449,864 3,610,950 88,152,811
19. Unit Service Factor 97.4 67.3 75.3
20. Unit Availability Factor 97.4 67.3 75.3 21 'Jnit Capacity Factor ('Using MDC Net) 92.5 62.9

.69.6 2.L Unit Capacity Factor (Using DER Net) 91.6 62.3 69.0

23. Unit Forced Outage Rate 2.6 32.7-12.5
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration ~of Each):

None

25. If Shut Down at End of Report Period, Estimated Date of Startup: N/A 26.- Units in' Test Status (Prior to Commercial Operation):

Forecast

- Achieved INITIAL CRITICALflT N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A c

,i,'

t

?'

r!

,!r!

L i

!i'-

!~

lj V

~

4 e

vt ht h o k t

in wdc nc a

t e

ei t ne r

4 c

t w " n.

v e eniv ol o

1 e

r awe h9 r e c c

i f

s g7 oP g

pt io cm r r n sr t

se e

gne t l 1

r1 ua nt ei u -

Cor nil o a a d e eF r

e b7 t u i l b

r ets h

r S

)'

t t

e n'

w4

&n t

c as a-r e r

5 o7 e4 e

r n vs ep r

o R

0 eo e u o vo 4

yE r

ri f

t 2s1 N )30 sir p omvd wp nn(

r e

ea rL e

s t c

l t

l 0

0 0 uc Oc eoa oe oEt u

0 i 3 4

aA rc n 5M9G(2 4 C

i Pr i

r o

tcao S

ut pa e e

r

. EEYE sDR) m t

ON MTBN 1

nf a

t 6 A

O n

t I

on S

A DD n

1 e

I e

v0 TN EI n e G

s E

TP od A

A GioE -

1 t

KT EE po N

N ib anR b

aeE it

/

/

t r s I

C N LL mC hipeU h

i O U x ec PE o

iN x

S D

M T C

EPL(

E r

N 4

5 O

O C

I C

m'e T

e A

A d

/

/

U 2

ts o N N

m n

9 yC D

9 amhi)i

)

o n

S nr 1

r c ot E

t r n c0a I

aS I

r

. af o u e

mdk p t

b Sicd x

e w

e

r. n t

l c

ausRoi E

m et 8

l l

u u mi o aa nu rti r e

s nt 2

d W

c n eo 0

A o nn ot i ea e r

nvwruh haauoeo

/

t O

e evp c

N t

t M

MACrP(DO eM iEe 2

P D

p-L R

9 234 5

6 3

1 D

I N

n I

A T

w N

fo o3

.n S

O Do

,o r

N d

i W

M ogc 3

5 a

t t

f h na in O

T t i e t

et m

l t

R D

Mu a

T O

h Ex U

P S

E

)

e l

t 2

in s

-)

n n

S I

r o

la n

e a

p c

lp x

iL G

B r

sa.

E n

x o

E N

e s

( t i&

(

t e

U e

t u

icg r'

I rT r n o

4 r )n r

t no )s lio s in r

a eieEi 6

Fe H av la ir t

ri u

a 0'

c lap t

n n yT a t

r o 9

r n x ul e agr oE 1

o rt melnnt oi s

1 i (

D(

i at nt pt el aiar nin ur r e l

ouiu gemeh qafe e pd p t

'e s

e MRROAOO aE p

F S

y R

r-2 AI CDEFC!

l i !

T 3

2 e

0 2

d a

le -

2 2'

t 1

1 du D

2 2

ed ce 9

9 rh o c f

S I

8 9

0 0

FS o

N 2

2 9

9 ii

l'

w y,%

3

~

REFUELING INFORhlATION REQUEST 1; Name of facility:

Millstone.1 i

2.

Scheduled date for next refueling shutdown: December 1993 -

3, Scheduled date for restart following refueling: h1 arch 1994 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amer.dment?

Yes, Technical Specification Changes Regarding:

(1) hlaximum Average Planar Linear Heat Generating Rate (2) hlaximum Critical Power Ratio 5.

Scheduled date(s) for submitting licensing action and supporting information:

Summer 1993 6.

Important licensing considerations associated with refueling, e.g., new or. different j

fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

188 GE10 Fuel Assemblies 7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage poch (a) In:the Core:

(a) 580 (b) 2116 (Unconsolidated) 8.

The present licensed spent fuel pool storage capacity and the size of any increase 1

in licensed storage capacity that has been requested or is planned,. in number of fuel assemblies:

Present capacity: h1aximum 3229 fuel assembly locations 9; The projected date of the last refueling that can be discharged to the spent fuel 1

pool assuming the present licensed capacity:

1997, Spent Fuel Pool, Full Core Off Load Capability is Reached

,