ML20127G101
| ML20127G101 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 12/31/1992 |
| From: | Newburgh G, Scace S NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| MP-93-53, NUDOCS 9301210145 | |
| Download: ML20127G101 (5) | |
Text
_. -__
NOKrHEAST UTILITIES o~a' o"= S* *a 5"* *"" c "*"
72Inf.$Y[aY $ DieitN N EC N 8n7 P.O. BOX 270 g
NOe:YItE[Es5 icN'oNany HARTFORD CONNECTtCUT 06141-0270 2
turtnea., Nwear Energy Cci@any (203}$$$.5000 Re: 10CFR50.7)(a)
January ll, 1993 HP-93-53 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
Reference:
Facility Operating License DPR-21 Docket No. 50-245
Dear Sir:
In accordance with hiillstone Unit 1 Technical Specification 6.9.1.6, the following monthly operating data report for h1illstone Unit 1 is enclosed. One additional copy of
- the report is enclosed.
Very truly ycurs, NORTHEAST NUCLEAR ENERGY COMPANY FOR: Ste hen E. Scace
' pe' President - hlillstone Station-I BY:
Fred R. Dacimo
~
hlillstone Site Services Director SES/GSN:ljs
Enclosures:
(4) cc:
T. T. hlartin, Regional Administrator Region 1 J, W. Andersen, NRC Project hlanager, hiillstone Unit No.1 P. D. Swetland, Senior Resident inspector, hiillstone Unit Nos.1, 2, & 3 93012101d5 921231 PDR ADOCK 05000245
[hf
-o q{
. -. _... ~. - _ _.. _..__ _. _ _
AVEllAGE DAILY UNIT POWElt LEVEL
~.
4 DOCKET NO. 245 UNIT hlillstone 1 DATE 930107 COSIPLETED IW G. Newburgh j
TELEPlIONE (203)447-1791 -
Ext. :4400.
AIONTih December 1992 AVERAG E D AllJ l'OWElt LL. EL AVEllAGE DAllJ l'OWER LEVEL DAY (h1We-N et)
DAY
( AlWe-Net )
1 648 17 642 2
534 18 l 642 3
251 19 642 4
315 20 642 5
642 21 642 6
643 22 397 7
643 23 640 8
642 24 642 9
635 25 642 10 641 26 642 11 583 27 642 12 641 28 642 13 641 29 643 14 637 30 639 15-642 31 643-16 642
~
INSTItUCTIONS On this format, list the average daily unit power level in MWe-Net for et
'ay in the reporting month. Compute to the nearest whole megawatt.
l l
l l.
OPERATING DATA REPORT -
=.
C DOCKET NO. 50-245
=
4-DATE 930107 COAIPLETED IW G. Newburgh TELEPHONE (203)447-1_791 Ext.: 4400 OPERATING STATUS L Unit Name:
Millstone 1 Notes 2.
Reporting Period: December 1992 3.
Licensed Thermal Power (MWt): 2011 4.
Nameplate Rating (Gross MWe): 662 5.
Design Electrical Rating (Net MWe): 660 6.
Maximum Dependable Capacity (Gross MWe): 684 7.
Maximum Dependable Capacity (Net MWe): 654 8.
If Chances Occur in Capacity Ratings (ltems 3 Through 7) Since Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted, if Any (Net MWe): N/A
- 10. Reasons For Restrictions, if Any: N/A This Month Yr-To-Date Cumulative
- 11. Hours in Reporting Period 744 8,874 193,656
- 12. Number Of Hours Reactor Was Critical 728.7 5,974.9 149,469.4
- 13. Reactor Reserve Shutdown Hours 0
0 3,283.3
- 14. Hours Generator On-Line 724.4 5,909.5 145,775.8
- 15. Unit Reserve Shutdown Hours 0
0 93.7-16, Gross Thermal Energy Generated (MWH) 1,397,192 11,351,486 273,866,873
- 17. Gross Electrical Energy Generated (MWH) 470,527 3,792,891 92,410,996
- 18. Net Electrical Energy Generated (MWH) 449,864 3,610,950 88,152,811
- 19. Unit Service Factor 97.4 67.3 75.3
- 20. Unit Availability Factor 97.4 67.3 75.3 21 'Jnit Capacity Factor ('Using MDC Net) 92.5 62.9
.69.6 2.L Unit Capacity Factor (Using DER Net) 91.6 62.3 69.0
- 23. Unit Forced Outage Rate 2.6 32.7-12.5
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration ~of Each):
None
- 25. If Shut Down at End of Report Period, Estimated Date of Startup: N/A 26.- Units in' Test Status (Prior to Commercial Operation):
Forecast
- Achieved INITIAL CRITICALflT N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A c
,i,'
t
?'
r!
,!r!
L i
!i'-
!~
lj V
~
4 e
vt ht h o k t
in wdc nc a
t e
ei t ne r
4 c
t w " n.
v e eniv ol o
1 e
r awe h9 r e c c
i f
s g7 oP g
pt io cm r r n sr t
se e
gne t l 1
r1 ua nt ei u -
Cor nil o a a d e eF r
e b7 t u i l b
r ets h
r S
)'
t t
e n'
w4
&n t
c as a-r e r
5 o7 e4 e
r n vs ep r
o R
0 eo e u o vo 4
yE r
ri f
t 2s1 N )30 sir p omvd wp nn(
r e
ea rL e
s t c
l t
l 0
0 0 uc Oc eoa oe oEt u
0 i 3 4
aA rc n 5M9G(2 4 C
i Pr i
r o
tcao S
ut pa e e
r
. EEYE sDR) m t
ON MTBN 1
nf a
t 6 A
O n
t I
on S
A DD n
1 e
I e
v0 TN EI n e G
s E
TP od A
A GioE -
1 t
KT EE po N
N ib anR b
aeE it
/
/
t r s I
C N LL mC hipeU h
i O U x ec PE o
iN x
S D
M T C
EPL(
E r
N 4
5 O
O C
I C
m'e T
e A
A d
/
/
U 2
ts o N N
m n
9 yC D
9 amhi)i
)
o n
S nr 1
r c ot E
t r n c0a I
aS I
r
. af o u e
mdk p t
b Sicd x
e w
e
- r. n t
l c
ausRoi E
m et 8
- l l
u u mi o aa nu rti r e
s nt 2
d W
c n eo 0
A o nn ot i ea e r
nvwruh haauoeo
/
t O
e evp c
N t
t M
MACrP(DO eM iEe 2
P D
p-L R
9 234 5
6 3
1 D
I N
n I
A T
w N
fo o3
.n S
O Do
,o r
N d
i W
M ogc 3
5 a
t t
f h na in O
T t i e t
et m
l t
R D
Mu a
T O
h Ex U
P S
E
)
e l
t 2
in s
-)
n n
S I
r o
la n
e a
p c
lp x
iL G
B r
sa.
E n
x o
E N
e s
( t i&
(
t e
U e
t u
icg r'
I rT r n o
4 r )n r
t no )s lio s in r
a eieEi 6
Fe H av la ir t
ri u
a 0'
c lap t
n n yT a t
r o 9
r n x ul e agr oE 1
o rt melnnt oi s
1 i (
D(
i at nt pt el aiar nin ur r e l
ouiu gemeh qafe e pd p t
'e s
e MRROAOO aE p
F S
y R
r-2 AI CDEFC!
l i !
T 3
2 e
0 2
d a
le -
2 2'
t 1
1 du D
2 2
ed ce 9
9 rh o c f
S I
8 9
0 0
FS o
N 2
2 9
9 ii
- l'
w y,%
3
~
REFUELING INFORhlATION REQUEST 1; Name of facility:
Millstone.1 i
2.
Scheduled date for next refueling shutdown: December 1993 -
3, Scheduled date for restart following refueling: h1 arch 1994 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amer.dment?
Yes, Technical Specification Changes Regarding:
(1) hlaximum Average Planar Linear Heat Generating Rate (2) hlaximum Critical Power Ratio 5.
Scheduled date(s) for submitting licensing action and supporting information:
Summer 1993 6.
Important licensing considerations associated with refueling, e.g., new or. different j
fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
188 GE10 Fuel Assemblies 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage poch (a) In:the Core:
(a) 580 (b) 2116 (Unconsolidated) 8.
The present licensed spent fuel pool storage capacity and the size of any increase 1
in licensed storage capacity that has been requested or is planned,. in number of fuel assemblies:
Present capacity: h1aximum 3229 fuel assembly locations 9; The projected date of the last refueling that can be discharged to the spent fuel 1
pool assuming the present licensed capacity:
1997, Spent Fuel Pool, Full Core Off Load Capability is Reached
,