ML20127F952

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Dec 1992 for Millstone Nuclear Power Station,Unit 3 & Revised Rept for Nov 1992
ML20127F952
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/11/1993
From: Scace S
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20127F953 List:
References
MP-93-38, NUDOCS 9301210100
Download: ML20127F952 (1)


Text

.

e NORTHEAST UTILITIES c,-.,.n., ce m. se m o u,

nm o C,oma l

I' o Por 270

  • ~ '

H Afi f f DFtD CGNNr.C TICU T M141 -D270

~

k 2

!?oh te ', 'Mf)

January 11 1993 MP-93-38 Re: 10CFR50.71(a)

U S Nuclear Regulatory Commission Document Control Desk Washington, D C. 20555

Reference:

Facility Operating 1.icense No. NPF-49 Docket No. 50-423

Dear Sir:

In accordance with reporting requirements of technical specifications Section 6 9.1.5, the Millstone Nuclear Power Station - Unit 3 Monthly Operating Report 93-01 covering operation for the month of December is hereby fonvarded. Additionally, a corrected page for the Operating Status Report for the month of November (Monthly Operating Report 92-12) is included. The gross electrical energy generated was incorrectly reported in the month of November due to a malfunction in the electric meter. The attached page reflects the correct information Very truly yours, NORTilliAST NUCLEAR ENERGY COMPANY

', /

i.,A j

kup/ p< u.

/ Stephen i. Scace Vice President, Millstone Station - NNECO 1

Attachment i

cc: T.T. Martin, Region 1 Administrator P.

Swetland, Senior Resident Inspector, Millstone Unit Nos 1,2 & 3 V. L Rooney, NRC Project Manager, Millstone Unit No. 3 9301210100 930111 F'DR ADOCK 05000423 PDR 5624 In