e NORTHEAST UTILITIES c,-.,.n., ce m. se m o u,
nm o C,oma l
I' o Por 270
- ~ '
H Afi f f DFtD CGNNr.C TICU T M141 -D270
~
k 2
!?oh te ', 'Mf)
January 11 1993 MP-93-38 Re: 10CFR50.71(a)
U S Nuclear Regulatory Commission Document Control Desk Washington, D C. 20555
Reference:
Facility Operating 1.icense No. NPF-49 Docket No. 50-423
Dear Sir:
In accordance with reporting requirements of technical specifications Section 6 9.1.5, the Millstone Nuclear Power Station - Unit 3 Monthly Operating Report 93-01 covering operation for the month of December is hereby fonvarded. Additionally, a corrected page for the Operating Status Report for the month of November (Monthly Operating Report 92-12) is included. The gross electrical energy generated was incorrectly reported in the month of November due to a malfunction in the electric meter. The attached page reflects the correct information Very truly yours, NORTilliAST NUCLEAR ENERGY COMPANY
', /
- i.,A j
kup/ p< u.
/ Stephen i. Scace Vice President, Millstone Station - NNECO 1
Attachment i
cc: T.T. Martin, Region 1 Administrator P.
Swetland, Senior Resident Inspector, Millstone Unit Nos 1,2 & 3 V. L Rooney, NRC Project Manager, Millstone Unit No. 3 9301210100 930111 F'DR ADOCK 05000423 PDR 5624 In