ML20127F573
| ML20127F573 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 03/11/1985 |
| From: | Gucwa L GEORGIA POWER CO. |
| To: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML20127F562 | List: |
| References | |
| 1411B, IER-85-01, IER-85-1, NED-85-139, NUDOCS 8505200508 | |
| Download: ML20127F573 (2) | |
Text
O.
Georgia Power Company
/*
4*_
333 Piedmont Avenue.
- 3~ F Atlanta. Georg:a 30308 Telephone 404 5266526
' Mail.ng Address:
Post Offce Du 4545 Atlanta, Georgia 30302 U ^!AR IS gg,.
Georgia Power L T. Gucwa the southern electrc system Manager Nuclear Engineenng ED-85-139 no chief Nuclear Engneer 14118 March 11, 1985 U.
S.~ Nuclear Regulatory Commission
REFERENCE:
Office of Inspection and Enforcement RII: RDW Region II - Suite 2900 50-321/50-366 101. Marietta Street, NW IER 85-01 Atlanta, Georgia 30323 ATTENTION: Dr. J. Nelson Grace GENTLEMEN:
Georgia Power Company hereby provides the following information in response to the violation cited in WC I&E Report 50-321/85-01 and 50-366/85-01 dated February 15, 1985.
The subject violations were identified during the NRC -
inspection conducted at Plant Hatch by Mr. G. B. Kuzo of your staff on January 21 through JanuaIy 25, 1985.-
Violation:
Technical. Specification 6.8.1.a requires that written pIncedures shall be established, - implemented and maintained covering the applicable proceduzes recommended in Appendix "A" of RegulatoIy Guide 1.33, Rev. 2, FebruaIy_1978.
Section 5.6 Iequires detailed written procedures shall be prepared and followed for all activities involved in implementing the Environmental Technical Specifications.
HNP-0-CCP-7602
" Monitoring Program for Detection of Releases via Unplanned Routes" requires quarterly samples fIom selected areas.
HW-0-CCP-7215 " Gamma Spectroscopy System Ge(L1)" requires that Iotation and calibration of standards will be assured by a schedule maintained by the counting room.
The current schedule listed all required standard Ge(Li) calib rations.
Contrary. to the above, proceduIes for Iouting sampling for unmonitored Ieleases and calibration of Ge(Li) detectors were not adhered to in that:
(a) For 1984, samples were collected only for the second quarter.
(HNP-0-CCP-7602)
. (b) For 1984, numerous. geometries for the Ge(L1) systems had not been calibrated as Iequired by the current laboratoIy schedule.
(HP-0-CCP-7215)
This is a Severity Level V violation (Supplement IV).
8505200508 850401' PDR ADOCK 05000321 G
~
^
~
^
~'
~^ "'
p-yig.;,
q.
q_
, T'~Gsorgia Power hf:
-U. S. Nuclear Regulato'Iy Commission.
Office of Inspection and Enforcement
- Region II:- Suite 2900
- MaIch 11,1985
/
.Page Two a
Response
' Admission or de'nial of alleged violation:. A violation occurred.
~
~
~
Reason -for the violation: ' Routine samples for unmonitored. Ieleases were not collected due. to. personnel eIIor involving noncompliance with l*P-7602.
- Responsible: supervisors failed _to utilize the Department Surveillance Matrix
- to assure that required samples'weIe collected.
The calibrations for the';Ge(Li) systems for geometries' in use weze performed
- in 1984; in accordance with 1+F-7215.
HoweveI, some of the data supporting
- these calibrations were not. Ieviewed by the~ inspector ' because the data 'had been tIansmitted to Documentation for permanent filing.
This data will be
.i available fcr Ieview at a subsequent inspection.
^ '^
lhe corrective steps which have been taken and the results achieved:
- The Iesponsibles ! supervisors _ were Ieprimanded for failure to assure that
. surveillance. scheduling was' E followed.-
In addition, the Department Manager issued a
letter to appropriate supervisors -and foremen ~ stating.the Iesponsibilities of each individual Iegarding the' completion of. assigned tasks and -procedu res.. The letter also. discussed this incident, disciplinary actions 4
. involved, and. future management '. action should this-incident. Iecu r. -
-Surveillance activities are now being: performed prope rly.
A pe riodic, _-
Einformal ~ Ieview of Iecords will -be conducted by management to ensure 5'
) continuing performance.
Corrective steps which will' be taken to avoid further violations:
- The above steps are sufficient to prevent recurrence.
-Date when full compliance was achieved:
s 1985 with collection ~of quarterly Full compliance was1 achieved -January 30, 1 samples specified in HPP-0-CCP-7602.
[
Should you have any questions in this regard, please contact this office.
I Vezy truly yours,
$RQ'e L. T. Gucwa
-SCE/bim
.xc: H.;C. Nix, Jr.
- Senior Resident Inspector y
.