9 ENTERGY n'T% ".h 6
)
3 ; 's ma, e i t,7 7
+
R. F. Dursiti j
A4.05 l
January 13, 1993 U.S. Nuclear Regulatory Connission ATIN: Document Control Desk' Washington, D.C. 20555 l
Subject:
Waterford 3 SES i
Docket No. 50-382 License No. NPF-38 l
Monthly Operating Report Gentlemen:
Attached is the subject monthly report which covers the operating f
statistics for the month of December,1992.
This report is submitted per i
Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facilit.y Operating License No. NPF-38.
Very truly yours, (ksk RF8/TSB ssf Attachment l
cc:
J.L. Milhoan, NRC Region IV D.L. Wigginton, NRC-NRR R.B. McGehee N.S. Reynolds F. Yost (Utility Data Institute, int.)
4 l
J.T. Wheelock (INP0 Records Center)
,~
NRC Resident Inspectors Of fice i
4 200011 1
9301290224 921231
- k
/
PDR ADOCK 05C00392
\\
^R
^
PDR l
1
.. - =...
NRC HONTHLY OPERATING REPORT
SUMMARY
OF OPERATIONS WATERFORD 3 DECEMBER 1992 4
The unit operated at an average power of 99.3% and experienced no shutdowns or significant power reductions during the period.
I I
..m.,
e
-w a-v'*P*r
-wM'W-
-P 4-e-eam-r g-reve
-,--W-wt
-4 w s--e=.'t
--%+++
y g
ia m e-
-w 7 m--w wes e.-e,ww rw.ca-ww++% i. e-T--,wq
-ke e
+
l i
-1 3
{-
i l
}
PRESSURIZER SAFETY VALVE i
l FAILURES AND CHALLENGES i
i WATERFORD 3 4-9 During the month of December 1992, there were no pressurizer safety valve failures or challenges..
1 1
1 1
1 h
1 I
k.
k I
i 1
i.
i a
I
+
1-i,
?
i i
J 3
4 4
f t
)
.....u.._.,._.
,.1,._...,_._.
..~.u...,,,
s l
4 i
OPERATING DATA REPORT DOCKET NAME: 50-382 UNIT NAME: WATERFORD 3 1
DATE OF REPORT: JANUARY, 1993 i
COMPLETED BY: C. L. ALDAY I
TELEPHONE: 504-739-6732 OPERATING STATUS 1
l 1.
Reporting Period: December, 1992 l
Gross Hours in Reporting Period 744 l
2.
Currently Authorized Power Level (MWt): 3390 J
Maximum Dependable Capacity (Not MWe): 1075 j
Design Electrical Rating (Net MWe): 1104 a
i 3.
Power Level to which Restricted (if any) (Net MWe): N/A 1
j 4.
Reasons for Restriction (if any):
N/A i
i
?
i l
THIS MONTH YR TO DATE CUMULATIVE i
i 5.
Number of Hours Reactor l
was critical 744.0 7,306.6 52,393.0 l
l 6.
Reactor Reserve
{
Shutdown Houra i 7.
Hours Generator was l
On-line 744.0 7,215.4 51,596.2 8.
Unit Reserve Shutdown Hours !
9.
Gross Thermal Energy j
Generated (MWH) 2,505,327 24,117,578 169,667,053 10.
Gross Electrical Energy Generated (MWH) 831,320 7,990,050 56,861,470 11.
Net Electrical Energy Generated (MWH) 797,180 7,622,157 54,171,617.
i j
12.
Reactcr Service Factor 100.0 83.2 82.2 I
l 13.
Reactor Availability Factor 100.0
-83.2 82.2
'14.
Unit Service Factor 100.0 82.1-80.9 15.
Unit Availability Factor 100.0 82.1
-80.9 16.
Unit Capacity Factor (using MDC) 99.7 80.7 79.1 r
17.
Unit capacity Factor (Using DER) 97.1 78.6 77.0 L
18.
Unit Forced Outage Rate 0.0 1.7 3.9 i
4
.,, %,-=.. _..,.. _ _,
m.
,y,,m
_..,r
...,.,.m.,
OPERATING DATA REPORT DOCKET NAME: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: JANUARY, 1993 COMPLETED BY
.C. L. ALDAY TELEPHONE: 504-739-6732 OPERATING DATA REPORT (Con't) 19.
Shutdowns Scheduled over next 6 Months (type, date and duration of each):
20.
If Shutdown at end of report period, estimated daow of startup N/A 21.
Unit in Commercial Operation THIS MONTH YR TO DATE CUMULATIVE 22.
Hours in Reporting Period 744.0 8,784.0 63,745.0 23.
Unit Forced Outage Hours 125.9 2,110.7 24.
Nameplate Rating (Gross MWe): 1200 25.
If Changes Occur in Capacity Ratings (Items Number 2 and 24) Since Last Report, Give Reasons:
N/A
......_;--.--.-..-~-...-_
_ - -... -... ~
. ~.. _ _.
4 j
i 1
i 1
l AVERAGE DAILY UNIT POWER LEVEL i
DOCKET NAME: 50-382 l
UNIT NAME: WATERFORD 3 l
DATE OF REPORT: JANUARY, 1993 COMPLETED BY: C. L. ALDAY 2
j TELEPHONE: 504-739-6732 l
MONTH DECEMBER i
l DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) i 1
1072 17 1078 i
2 1076 18 1079 3
1077 19 1079 4
3077 20 1079 i.
5 1078 21 1078 l
6 1078 22 1078 7
1078 23 1080 l'
8 1077 24 1076 i
9 1077 25 1078 10 1077 26 1078 i
11 1077 27 1078 l
12 895 28 1077 l
13 1,
29 1078 I
14 10ii 30 1078 i
15 1077 31 1077 16 3077 I
f INSTRUCTIONS i
On this format, list the average daily unit power -livel in MWe-Net for each day I
in the reporting month. Compute to the nearest whole megawatt.
i i
f i
f I
y-4-,-._.-
..w
.v..,
.r
,,..,,m-r
,w.-.,
,,.,w.
..,w.,
...~3
,c,e
s.
. 1 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER: 50-382 UNIT NUMBER: WATERFORD 3 DATE OF REPORT: JANUARY, 1993 COMPLETED BY: C. L. ALDAY TELEPHONE: 504-739-6732 REPORT FOR DECEMBER Method of Shutting Type F = Forced Duration Down the Reactor or Cause, Comments and 1
Number Date S = Scheduled (Hours)
Reason (1)
Reducing Power (2)
Corrective Actions NONE.
l l
(1)
REASON (2) METHOD A = Equipment Failure (explain) 1 = Manual B'= Maintenance or Test 2 = Manual Scram C = Refueling 3 = Automatic Scram D = Regulatory Restriction 4 = Continuation from Previous Period E = Operator Training and 5 = Power Reduction License Examination 6 = Other (explain)
F = Administrative G = Operational Error (explain)
H.= Other (explain)
.,...