9 ENTERGY n'T% ".h 6

)

3 ; 's ma, e i t,7 7

+

R. F. Dursiti j

W3F1-93-0100 i

A4.05 l

January 13, 1993 U.S. Nuclear Regulatory Connission ATIN: Document Control Desk' Washington, D.C. 20555 l

Subject:

Waterford 3 SES i

Docket No. 50-382 License No. NPF-38 l

Monthly Operating Report Gentlemen:

Attached is the subject monthly report which covers the operating f

statistics for the month of December,1992.

This report is submitted per i

Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facilit.y Operating License No. NPF-38.

Very truly yours, (ksk RF8/TSB ssf Attachment l

cc:

J.L. Milhoan, NRC Region IV D.L. Wigginton, NRC-NRR R.B. McGehee N.S. Reynolds F. Yost (Utility Data Institute, int.)

4 l

J.T. Wheelock (INP0 Records Center)

,~

NRC Resident Inspectors Of fice i

4 200011 1

9301290224 921231

- k

/

PDR ADOCK 05C00392

\\

^R

^

PDR l

1

.. - =...

NRC HONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS WATERFORD 3 DECEMBER 1992 4

The unit operated at an average power of 99.3% and experienced no shutdowns or significant power reductions during the period.

I I

..m.,

e

-w a-v'*P*r

-wM'W-

-P 4-e-eam-r g-reve

-,--W-wt

-4 w s--e=.'t

--%+++

y g

ia m e-

-w 7 m--w wes e.-e,ww rw.ca-ww++% i. e-T--,wq

-ke e

+

l i

-1 3

{-

i l

}

PRESSURIZER SAFETY VALVE i

l FAILURES AND CHALLENGES i

i WATERFORD 3 4-9 During the month of December 1992, there were no pressurizer safety valve failures or challenges..

1 1

1 1

1 h

1 I

k.

k I

i 1

i.

i a

I

+

1-i,

?

i i

J 3

4 4

f t

)

.....u.._.,._.

,.1,._...,_._.

..~.u...,,,

s l

4 i

OPERATING DATA REPORT DOCKET NAME: 50-382 UNIT NAME: WATERFORD 3 1

DATE OF REPORT: JANUARY, 1993 i

COMPLETED BY: C. L. ALDAY I

TELEPHONE: 504-739-6732 OPERATING STATUS 1

l 1.

Reporting Period: December, 1992 l

Gross Hours in Reporting Period 744 l

2.

Currently Authorized Power Level (MWt): 3390 J

Maximum Dependable Capacity (Not MWe): 1075 j

Design Electrical Rating (Net MWe): 1104 a

i 3.

Power Level to which Restricted (if any) (Net MWe): N/A 1

j 4.

Reasons for Restriction (if any):

N/A i

i

?

i l

THIS MONTH YR TO DATE CUMULATIVE i

i 5.

Number of Hours Reactor l

was critical 744.0 7,306.6 52,393.0 l

l 6.

Reactor Reserve

{

Shutdown Houra i 7.

Hours Generator was l

On-line 744.0 7,215.4 51,596.2 8.

Unit Reserve Shutdown Hours !

9.

Gross Thermal Energy j

Generated (MWH) 2,505,327 24,117,578 169,667,053 10.

Gross Electrical Energy Generated (MWH) 831,320 7,990,050 56,861,470 11.

Net Electrical Energy Generated (MWH) 797,180 7,622,157 54,171,617.

i j

12.

Reactcr Service Factor 100.0 83.2 82.2 I

l 13.

Reactor Availability Factor 100.0

-83.2 82.2

'14.

Unit Service Factor 100.0 82.1-80.9 15.

Unit Availability Factor 100.0 82.1

-80.9 16.

Unit Capacity Factor (using MDC) 99.7 80.7 79.1 r

17.

Unit capacity Factor (Using DER) 97.1 78.6 77.0 L

18.

Unit Forced Outage Rate 0.0 1.7 3.9 i

4

.,, %,-=.. _..,.. _ _,

m.

,y,,m

_..,r

...,.,.m.,

OPERATING DATA REPORT DOCKET NAME: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: JANUARY, 1993 COMPLETED BY

.C. L. ALDAY TELEPHONE: 504-739-6732 OPERATING DATA REPORT (Con't) 19.

Shutdowns Scheduled over next 6 Months (type, date and duration of each):

20.

If Shutdown at end of report period, estimated daow of startup N/A 21.

Unit in Commercial Operation THIS MONTH YR TO DATE CUMULATIVE 22.

Hours in Reporting Period 744.0 8,784.0 63,745.0 23.

Unit Forced Outage Hours 125.9 2,110.7 24.

Nameplate Rating (Gross MWe): 1200 25.

If Changes Occur in Capacity Ratings (Items Number 2 and 24) Since Last Report, Give Reasons:

N/A

......_;--.--.-..-~-...-_

_ - -... -... ~

. ~.. _ _.

4 j

i 1

i 1

l AVERAGE DAILY UNIT POWER LEVEL i

DOCKET NAME: 50-382 l

UNIT NAME: WATERFORD 3 l

DATE OF REPORT: JANUARY, 1993 COMPLETED BY: C. L. ALDAY 2

j TELEPHONE: 504-739-6732 l

MONTH DECEMBER i

l DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) i 1

1072 17 1078 i

2 1076 18 1079 3

1077 19 1079 4

3077 20 1079 i.

5 1078 21 1078 l

6 1078 22 1078 7

1078 23 1080 l'

8 1077 24 1076 i

9 1077 25 1078 10 1077 26 1078 i

11 1077 27 1078 l

12 895 28 1077 l

13 1,

29 1078 I

14 10ii 30 1078 i

15 1077 31 1077 16 3077 I

f INSTRUCTIONS i

On this format, list the average daily unit power -livel in MWe-Net for each day I

in the reporting month. Compute to the nearest whole megawatt.

i i

f i

f I

y-4-,-._.-

..w

.v..,

.r

,,..,,m-r

,w.-.,

,,.,w.

..,w.,

...~3

,c,e

s.

. 1 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER: 50-382 UNIT NUMBER: WATERFORD 3 DATE OF REPORT: JANUARY, 1993 COMPLETED BY: C. L. ALDAY TELEPHONE: 504-739-6732 REPORT FOR DECEMBER Method of Shutting Type F = Forced Duration Down the Reactor or Cause, Comments and 1

Number Date S = Scheduled (Hours)

Reason (1)

Reducing Power (2)

Corrective Actions NONE.

l l

(1)

REASON (2) METHOD A = Equipment Failure (explain) 1 = Manual B'= Maintenance or Test 2 = Manual Scram C = Refueling 3 = Automatic Scram D = Regulatory Restriction 4 = Continuation from Previous Period E = Operator Training and 5 = Power Reduction License Examination 6 = Other (explain)

F = Administrative G = Operational Error (explain)

H.= Other (explain)

.,...