Monthly Operating Rept for Dec 1992 for Monticello Nuclear Generating Plant
ML20127E211
Person / Time
Site: Monticello 
Issue date: 12/31/1992
From: Parker T, Paustian H
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9301190205
Download: ML20127E211 (5)


Text

_.

Northem States Power Company

-1 414 Ncollet Mau Minneapohs, Minnesota 5540! 1M7 Telephone (612) 3345500 January 11, 1993 Monticello Technical Specifications Section 6.7.A,3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR CENERATING PIANT Docket No. 50-263 License No. DPR-22 l

Monthly Operating Report December. 1992 i

Attached is the Monthly Operating Report for December, 1992 for the Monticello Nuclear Generating Plant.

/

n

'd

/homas M larker a

Director Nuclear Licensing TMP/jlk C:

Director, Office of Resource Management Regional Accinistrator-III, NRC NRR Proj ect Mai.sger, NRC

-NRC Resident Inspe tor State of Minnesota - ;'ris Sanda Attachment f['l 200010 9301190205 92123I PDR ADOCK 05000263 i

R pyg

OPERATING' DATA REPORT--

DOCKET NO.

50-2'63 DATE 1-4-93 COMPLETED-BY H. H. Paustian-TELEPHONE 612/295-5151

-OPERATING STATUS

] Notes

]-

1. Unit Name :

Monticello

]

-]'

2. Reporting period:

December

]

] --

3. Licensed Thermal Power (MWt):

1670

]

]-

4. Nameplate Rating (Gross MWe):

569

]

]

5. Design Electrical Rating (Net MWe):

545.4

]

):

'6. Maximum Dependable Capacity (Gross MWe): __564

]

]

7. Maximum Dependable Capacity (Net MWe):

536

)

]

8. If Changes Occur in Capacity Ratings (Items Number-3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions, If Any: __N/A

+

THIS MONTH

-YR.-TO-DATE CUMULATIVE:

11. Hours In Reporting Period 744 8784 188521-
12. Number Of Hours Reactor Was Cri.

21 744.0 8566.3 151984.7--

-13. Reactor Reserve Shutdown Hours 0.0 0,0 940.7

14. Hours Generator on-Line 744.0 8528.3 149276.2
15. Unit Reserve Shutdown Hours 0.0 0.0 H0.0-

-16. Gross Thermal Energy Generated (:MWH) 1020451 13859836 229393413

-17. Gross Electrical Energy Generated (MWH) 338496 4640955 77530800

18. Net Electrical Energy Generated (MWH) 323519 4453669 74155887;

-19. Unit Service Factor 100.0%

97.1%

79.2%'

20.' Unit Availability Factor 100.0%

!T7.1 % -:

.79.2%

21. Unit Capacity Factor (Using MDC Net)

.81.1%

94.6%

73.4%
22. Unit Capacity Factor (Using DER-Net) 79.7%-

93.0%

72.1%

23. Unit Forced Outage Rate 0.0%

0.8%.

3 -. 7 %1

24. Shutdowns Scheduled Over Next=12 Months (Type, Date, andl Duration'of'Each))
Refueling Outage - 1/27/93 - 56 days r
25. If Shut-Down At End Of Report Period, Estimated Date Of'Startup:N/A1 126. Units'In Test-Status (Prior to. Commercial Operation): N/A Forecast Achieved <

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL.UPERATION c,.

..u.

-.m

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-263 UNIT Monticello.__

DATE 1-4-93 COMPLETED BY H. H.

Paustian TELEPHONE 512/295-5151 MONTH OF December DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 465.

17 437.

2 463.

18 431.

3 465.

19 433.

4 463.

20

429, 5

453.

21 428.

6 455.

22 426.

7

453, 23 425.

8

451, 24 417.

9

450, 25 411.

10 377.

26 411.

11

457, 27 414.

~

12 447.

28 417.

13

._444, 29 414.

14

442, 30 412.

15 439.

31 413.

lu 438.

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

-l NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-263 DATE 1-4-93 COMPLETED BY H. H. Paustian TELEPHONE 612/295-5151 MONTH DEC 12-1-92 to Power operation.

Coastdown continued.

12-10-92 Valve stem forced from Moisture Separator Drain Valve 12-10-92 CV-3133 during repairs.

Power reduced to 24% to effect repairs and returned to maximum coastdown capability after repairs completed.

12-10-92 to Power operation.

Coastdown continued.

12-31-92 L

b Note: Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.

INIT'SHUIDOWNS AND FOVER REDUCTIONS DCEET NO.

50-263 o-UNIT NAME lionticello DATE 02-04-93

~'

COMPLETED BY ~11. H. Paustian REPORT MONTH _ December TELEPH0tE 612/295-5151 -

i No.

Date.

Ty(peDuration Reason Method LER System Comp.

Cause & Corrective 1)

(hours)

(2) of-No.

Code Code Action to i

Shutdown (4)

(5)

Prevent Recurrence (3) 6 12-10-92 F

0 B

4

'N/A TF IfV Pover reduction to 24% to repair Turbine Moisture-Separator drain valve.

1 2

3 4

F: Forced - -

Reason:

Method: -

Draft IEEE Standard S: Scheduled A-Equipment. Failure (Explain) 1-Manual 805-1984(P805-D5)

B-Maintenance or. Test 2-Manual Scram C-Reft:3 ling 3-Automatic Scram 5

D-R lator Restriction 4-Other (Explain)

IEEE Standard 803A-1983 E

rator Training & License Examination F-inistrative

'G-Operational Error (Explain).

H-0ther (Explain)

~'

'