ML20127D499
| ML20127D499 | |
| Person / Time | |
|---|---|
| Issue date: | 01/11/1993 |
| From: | Hiltz T Office of Nuclear Reactor Regulation |
| To: | Miraglia F, Murley T, Russell W NRC |
| References | |
| PROJECT-669A NUDOCS 9301150249 | |
| Download: ML20127D499 (3) | |
Text
hJMI-4*
%o UNITED STATES du P'-
f NUCLEAR REGULATORY COMMISSION n
g
,i WASHING TON, D. C, 20555 4
\\*****/
January 11, 1993 Project No. 669 MEMORANDUM FOR:
T. Murley G. Lainas R. Zimmerman F. Miraglia J. Roe B. Boger W. Russell J. Zwolinski C. Thomas J. Partlow M. Virgilio F. Congel D. Crutchfield B. Grimes E. Butcher W. Travers J. Richardson W. Bateman, EDO F. Gillespie B. D. Liaw R. Nease S. Varga A. Thadani Operations Center J. Calvo G. Holahan C. Rossi THRU:
Jerry N. Wilson, Acting Director Standardization Project Directorate Associate Directorate for Advanced Reactors Office of Nuclear Reactor Regulation FROM:
Thomas G. Hiltz, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors Office of Nuclear Reactor Regulation
SUBJECT:
DAILY HIGHLIGHT - FORTHCOMING MEETING (VIDE 0 CONFERENCE CALL) WITH THE ELECTRIC POWER RESEARCH INSTITUTE (EPRI) TO DISCUSS THE REGULATORY TREATMENT OF ACTIVE NONSAFETY SYSTEMS IN PASSIVE LIGHT WATER REACTOR DESIGNS DATE AND TIME:
January 15, 1993, 9 a.m. to 11:30 a.m. (EDT)
LOCATION:
The video conference call will originate at the following locations:
EPRI Offices EPRI Offices 3412 Hillview Avenue 200 L Street Building 3 Suite 805 Palo Alto, California 94303 Washington, D.C.
20036 PURPOSE:
To continue discussions between the Nuclear Regulatory Commission staff and EPRI representatives concerning the reliability of passive safety systems and the staff's pro-posed approach for evaluating the importance of active nonsafety systems in passive light water reactor designs.
]40017 ETED flEGli AI0ftY C30/u !ls
/ oib7 9301150249 930111
'~~%~
~~
P PRDJ r_
l
._ _,, g
()
-2_
January 11, 1993 PARTICIPANTS:
NEL EER1 A. Thadani T. Marston H. Rubin G. Bockhold R. W. Borrhardt E. Rumble J. H. Wilson, et al.
G. Vine J. Trotter, et al.
(Original signed by)
Thomas G. !!iltz, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation cc:
See next page
- Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 43 Egdgral Reaister 28058, 6/28/78.
Members of the public who wish to attend should contact me at (301) 504-1105.
DillRIBUTION:
Central File PDST R/F JNWilson JHWilson PDR RBorchardt THiltz AThadani PShea AChaffee, llAl JMoore, 15B18 MRubin EJordan, 3701 ACRS (10)
CSmyre, 12G18 P0' Dell, 12E4 SBajwa, 12G18 GGrant, 17G21 OPA 0FC:
LA:PDSTgAD,AR PM:PDST:ADAR SC:PDST:ADAR PSheahh kIz RBortgt)
THilt NAME:
DAT E:; 01/// [93 Ol/d /k3 01/// /d'3 0FFICIAL RECORD COPY:
DOCUMENT NAME: MTGll5.TH
1.
l ALWR Utility Steering Committee EPRI Project No. 669 cc:
Mr. E. E. Kintner Chairman Utility Steering Connittee Bradley Hill Road Post Office Box 682 Norwich, Vermont 05055 Mr. John Trotter Nuclear. Power Division Electric Power Research Institute Post Office Box 10412 Palo Alto, California 94303 Mr. Brian A. McIntyre, Manager Advanced Plant Safety & Licensing Westinghouse Electric Corporation Energy Systems Business Unit Post Office Box 355 Pittsburgh, Pennsylvania 15230 Mr. Joseph Quirk CE Nuclear Energy Mail Code 782 General Electric Company 175 Curtner Avenue San Jose, California 95125 Mr. Stan Ritterbusch Combustion Engineering 1000 Prospect Hill Road Post Office Box 500 Windsor, Connecticut 06095 Mr. Daniel F. Giessing U. S. Department of Energy NE-42 Washington, D.C.
20585 Mr. Steve Goldberg Budget Examiner-725 17th Street, N.W.
Room 8002 u.hington, D.C.
20503 3
_ _ _