i e*
fNuclear PO=r GPU Nuclear Corporation a
MUdotown. Ponrisytvania 170574180 (717)944 7021 Wntor's Diroct Dia! Nurnber.
717-948-8005 January ll, 1993 1
C311-93-2002 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.
20555 Gentlemen:
Subject:
Three Mile Island Nuclear Station Unit 1, (THI-1)
Decket No. 50-289 Operating License No. DPR-50 GPU Nuclear Schedule for Responding to NRC Request for Additional Information Regarding Generic Letter (GL) 90-06,
" Resolution of Generic Issue 70, ' Power-Operated Relief Valve and Block Valve Reliability,'and Generic issue 94,
' Additional Low-Temperature Overpressure Protection for Light-Water Reactors.' pursuant to 10 CFR 50.54(f)."
GPU Nuclear responded to Generic Letter 90-06 in a letter dated December 24, 1990.
The NRC staff reviewed that response and in a letter dated October 29, 1992 provided comments regarding testing of the Power-0perated Relief Valve (PORV) anc' the incorporation of model Technical Specifications.
Because the application-of model Technical Specifications is a generic issue, the NRC comments affect the other B&W operating plants as well.
Therefore, the B&W Owners Group (BWOG) Technical Specifications Committee has undertaken an initiative to respond as an owners group. A telephone conference call involving the BWOG utilities and the NRC staff was held on December 17, 1992.
As a result of that discussion, a BW0G response addressing the model Technical Specification issue is being prepared with TMI-l participation.
GPU Nuclear has discussed a schedule for responding to the recent NRC comments.
with the THI-l NRC Senior Project Manager, Mr. R. W. Hernan.
GPU Nuclear understands that the NRC will consider an extension of the 60 day response 150074 9301150232 930111 a/4 PDR ADOCK 05000209 Ut t P
PDR GPU Nuclear Corporation is a subsidiary of Genera! Pubhc Uttimos Corporation
~_
.d e
C311-93-2002 Page 2 of 2 schedule requested by their letter. Based upon the schedule of the BWOG, we intend to provide a response to the NRC's request for additional information by February 1,1993.
Sincerely,
.f:}
On T. G. Broughton Vice President and Director, THI-1 MRK cc: Administrator, Region I THI-l Senior Resident inspector THI-1 Senior Project Manager i
1 4
i