ML20127D334

From kanterella
Jump to navigation Jump to search
Corrected TS Page 3/4 3-31 Inadvertently Omitted from 920330 Amend 155 to License DPR-65
ML20127D334
Person / Time
Site: Millstone 
(DPR-65-A-155)
Issue date: 09/03/1992
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20127D339 List:
References
NUDOCS 9209140240
Download: ML20127D334 (1)


Text

{

k INSTRUMENTATION

.c LIMITING CONDITION FOR OPERATION-(Continued)

An OPERABLE quadrant symetric incore detector segment group shall consist of a minimum of three OPERABLE rhodium incore detector segments in 90*F symetric fuel assemblies.

APPLICABILITY: When the incore detection system is used for:

a.

Monitoring the AZIMUTHAL POWER TILT, b.

Recalibration of the excore neutron flux detection system, or Monitoring the TOTAL UNRODDED INTEGRATED RADIAL PEAKING FACTOR or c.

the linear heat rate.

ACTION:

With the incore detection system inoperable, do not use the system for the above applicable monitoring or calibration functions. The provisions of specifications-3.0.3 are not applicable.

SURVEILLANCE REOUTREMENT 4.3.3.2 The incore detection system shall be' demonstrated OPERABLE:

By performance of a CHANNEL CHECK within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to its a.

use and at least once per 7 days thereafter when required for:

1.

Monitoring the AZIMUTHAL POWER TILT.

2.

Recalibration of the excore neutron flux detection system.

3.

Monitoring the TOTAL UNRODDED INTEGRATED-RADIAL PEAKING FACTOR or the linear heat rate.

b.

At least once per 18 months by performance of a CHANNEL CAllBRATION operation which exempts the neutron detectors but

- includes.all electronic components. The neutron detectors shall be

-calibrated: prior to' installation in the reactor core.

92o9140240 920903 PDR ADOCK 05000336 p

PDR MILLSTONE - UNIT 2 3/4 3-31 Amendment No. f), UJ. 7E7,155 ooas

-