Responds to 921117 Request for Meeting to Discuss Technical Issues Associated W/Fire Barrier Sys & Fire Endurance Acceptance Criteria Re App R Raceway Requirements
ML20127D012
Person / Time
Issue date: 12/09/1992
From: Thadani A
Office of Nuclear Reactor Regulation
To: Licht R
MINNESOTA MINING & MANUFACTURING CO. (3M CO.)
References
NUDOCS 9301150062
Download: ML20127D012 (2)


Text

-..

s December 9, 1992 Mr. Richard Licht 3M General Offices 3M Center St. Paul, MN 55144-1000

Dear Mr. Licht:

We have received your letter of November 17, 1992, requesting a meeting to discuss the technical issues associated with fire barrier systems and fire endurance acceptance criteria as they pertain to Appendix R raceway requirements.

In response to your request, a meeting to discuss fire endurance acceptance criteria and technical requirements as they apply to 3M, Eternit, Promatec and other interested fire barrier vendors has been scheduled for January 7,1993, at URC Headquarters in Rockville, Maryland.

Previous meetings (July 7, August 12 and 25, September 24, and November 19, 1992) that discussed issues associated with Thermo-Lag fire barrier products between NRC staff and NUMARC representatives, have been public meetings.

These meetings have been well attended by both industry and the public.

One of the purposes of these previous meetings was to solicit public comment and feedback on the issues associated witF Thermo-Lag fire barrier systems.

Because of a number of fire endurance i aceway test failures of Thermo-Lag f' ire barrier material, the NRC's immediate concern was to address this type of barrier problem.

However, the NRC does plan to address other fire barrier products used by industry to protect the safe shutdown trains from fire.

The proposed NRC fire endurance acceptance criteria discussed at a public meeting on November 19, 1992, attended by NUMARC and other industry representatives, was developed to be generically applicable to fire barrier systems for separation of safe shutdown functions within the same fire area.

The NRC plans to issue the criteria through the normal regulatory process.

This process provides an opportunity for public comment. We welcome discussions with you on these criteria.

We look forward to your presentation on the technical histories and product capabilities as they pertain to the NRC's existing regulations.

If you have any questions, please contact us.

Sincerely, DITNICCMED BFA,CJEd 14001$

Ashok C. Thadani, Director h Division of Systems Safety and Analysis Office of Nuclear Reactor ReguJa' tion

Contact:

P. Madden (301) 504-2854

(

SL x'

Distribution:

See next page

~ ~

SPLB:DSreviousconcurrences,

  • See i

/

DD%SA; SA SPLB:DSSA SPLB:DSSA D:DSSA

'j12/f/92 MWidmann*

Architzel*

CMcCracken

  • nol ahan AThadani/92 NNNM8 12/ 7 12/ 4/92 12/ 4 /92 12/4 /92

[G:\\THERMOLA\\YT920271.MTW]

j l

n;~I P nl T o Mpi!! A"' PTQ Al ptr0 i

....id a:m W.;w.a w.im L ULEd la 9301150062 921209 f.3 l PDR ORG NRRB q

0

____ _ -_ -___ _-- Y

?..,-

ulS1 RIM 110!!

SPI B 151 File X005-r1RC POR IMurley fMiraglia WRussell JPartlow Alhadant GHolahan CMcCracken RArchitzel PMadden MWidmann IMoghissi SWest GMulley EPawlik JLee AMasciantonio SHom JFouchard Mcallahan LPlisco PGill RJenkins Mailroom 12G18 (YI 0920271) l l

i l

l

\\

l 3

-