Forwards Insp Rept 50-458/92-34 on 921108-1219 & Notice of Violation
ML20127C971
Person / Time
Site: River Bend Entergy icon.png
Issue date: 01/08/1993
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Graham P
GULF STATES UTILITIES CO.
Shared Package
ML20127C974 List:
References
NUDOCS 9301150047
Download: ML20127C971 (5)


See also: IR 05000458/1992034

Text

. _ _ - . _ _ .

-. _

._

-

_.

--

- -

-

=

__-

_. _-

UNIT E D ST AT ES

    • '0

0g?

NUCLEAR REGULATORY COMMISSION

.

g,

3

i

~

,l

E

RtosoN av

h

'[

6H RV AN M AFA DRIVE, SUM L 400

!*

AR LINoToN, T L X AS 760118064

'

  • * ' *

JAN - 81993

l

Docket No. 50-458

License No. NPf-47

Gulf States Utilities

ATIN:

P. D. Graham

Vice President (RBNG)

P.O. Box 220

'

St. Francisville, Louisiana 70775

Gentlemen:

SUBJECT:

HRC INSPECTION REPORT NO. 50-458/92-34 (NOTICE Of VIOLATION)

This refers to the inspection conducted by Mr. W. f. Smith, and the inspectors

identified in the attached report, of this office on November 8 through

December 19, 1992.

The inspection included a review of activities authorized

l

for your River Bend Station facility.

At the conclusion of the inspection,

the findings were discussed with those members of your staff identified in the

enclosed report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examination of procedures

and representative records, inspections of installed equipment and system

lineups, interviews with personnel, and observation of activities in progress.

Based on the results of this inspection, certain of your activities appeared

to be in violation of NRC requirements, as specified in the enclosed Notice of

Violation (Notice).

The first two violations are of concern because your

operators failed to comply with the plant Technical Specifications during a

routine startup and again during a routine shutdown.

Additional violations

were cited in NRC Inspection Report 50-458/92-32 for failure of your operators

to comply with the plant Technical Specifications.

While it is commendable

that your staff has been identifying these violations, it is expected that you

will take appropriate and positive generic corrective actions to prevent

future violations.

The third violation is of concern because safety-related equipment was allowed

to degrade over an 18-month period without being identified by your staff.

Of

particular concern is the fact that after the NRC brought the condition of

Unit Cooler 1HVR*UC5 to your attention, the plant was in Operational

l

Condition I for 3 additional days before the operability of five similar unit

.

In addition to the response requested in the Notice of

l

coolers were assessed.

Violation, you are requested te include a

iscussion of the cause and

i

corrective action for the dehy in determining the 09erability of the

'

l

remaining unit coolers.

1

,

l

140060

[/l/ ( l

f

9301150047 93)tos

PDR

ADOCK 05000458

g

/ ./

T

G

PDR

V

.

.

_ _ _ _ .

. . _ _ , . . _

_

-

_ _ _

._

.-

_ _ _ .

.

,

'

Gulf States Utilities

-2-

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response.

in your

response, you should document the specific actions taken and any additional

actions you plan to prevent recurrence. After reviewing your response to this

Notice, including your proposed corrective actions and the results of_ future

inspections, the NRC will determine whether further NRC enforcement action is

necessary to ensure compliance with NRC regulatory requirements,

in

accordance with_10 CFR Part 2.790 of the NRC's " Rules of Practice," a copy of

this letter and its enclosures will be placed in the NRC Public Document Room.

The responses directed by this letter and the enclosed Notice are not subject

~

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, Pub. L. No. 96.511.

'

Should you have any questions regarding this inspection, we will be pleased to

' discuss them with you.

Sincerely,

l

M3

I

aa

I Bill Beach, Director

Division of Reactor Projects

Enclosures:

1.

Appendix A - Notice of Violation

2.

Appendix B - NRC Inspection Report

50-458/92-34

_

cc w/ enclosures:

- Gulf States Utilities

ATIN:

J. E. Booker, Manager-

Nuclear Industry Relations

P.O. Box 2951

-Beaumont, Texas 77704

Winston & Strawn.

..

ATTN:

Mark J. Wetterhahn, Esq.

1401 L Street, N.W.

Washington, D.C.

20005-3502

. Gulf States Utilities

ATTN:

Les England, Director

Nuclear Licensing

s'

P.O. Box 220

St. Francisville, Louisiana 70775

. . . . .

.

.

-_ _ _ _ _ _ _ _ - _ _ - _

- ._

_ _ - _

-

_ - - -

_ .

_ . . . . _ _ . . _ _ . - - _. _ . . . _ . - _ _ _ _ _ _ . _ . . _ _ _ _ _ . . _ _ - _ _ _ _ _ _ _ . _ . _ . . _ _ _ .

_ . _ _ _ _

-

.'

'

.

Gulf States Utilities

-4-

JAll - 81993

'

,

'

bec-to DMB (IE01)

-

i

bcc distrib. by RIV.

J. L. Hilhoan

Resident inspector

DRP

Section Chief (DRP/C)

Lisa Shea, RM/Alf, MS: MNBB 4503

MIS System

DRSS-flPS

RSTS Operator

RIV file

Section Chief (DRP/TSS)

DRS

R. Wise, AC

Senior Resident inspector, cooper

G.'Sanborn, E0

Senior Resident inspector, fort Calhoun

J. Lieberman, OE, MS: 7-H-5

l

!

t

/

RIV: sri [

PE :DRR'/C

D:0jf

C:DRP/ '[rdo

/WFSmithf,

,EEColli'ns

-

JEGagF

ABue&ch

9 / (/91

(t1/.5f/93

1/ 6/9

1/[./93

9

f

/

>

s

._--,...-.2m_._- - - - . - - , . . . . . . . - , _

r.

,.y

.

. . . -

,,-.,....,.w,w.-

.,y--,_

,, ..

s.,-.,

,,mmwo-m--.

._

-,..,[.

.m

,..

. . , ,

-r

, . . . . . . .

- - - - -

- - _ - - _ _ - _ - - - - . - - - -

'.

.

Gulf States Utilities

-3-

Mr. J. David McNeill, 111

William G. Davis, Esq.

Department of Justice

Attorney General's Office

P.O. Box 94095

Baton Rouge, Louisiana 70804-9095

H. Anne Plettinger

3456 Villa Rose Drive

Baton Rouge, Louisiana 70806

President of West Feliciana

Police Jury

P.O. Box 1921

St. Francisville, Louisiana 70775

Cajun Electric Power Coop. Inc.

A11N:

Philip G. Harris

10719 Airline Highway

P.O. Box 15540

Baton "ouge, Louisiana 70895

Hall Bohlinger, Administrator

Radiation Protection Division

P.O. Box 82135

Baton Rouge, Louisiana 70884-2135

l

1

_ . . . . . . . . . .

.

. _ _ . . _.._._ _ _

__.. . _ . _ . _ . . _ _ _ . . . _ _ _ _ _ _ _ _ _ _ _ . _ _ _ . _ _ . -

_-_

_

--

- >

-

e

Gulf States Utilities

-4-

JAN - 81993

,

bcc to DMB (IE01)

bcc distrib. by RIV:

J. L. Milhoan

Resident inspector

DRP

Section Chief (DRP/C)

Lisa Shea, RM/Alf, MS: MliBB 4503

MIS System

DRSS-flPS

RSTS Operator

RIV file

Section Chief (DRP/TSS)

DRS

R. Wise, AC

Senior Resident inspector, Cooper

G. Sanborn, E0

Senior Resident inspector, fort Calhoun

J. Lieberman, OE, MS: 7-H-5

.

l

1

&

i

,

, .

,c

RIV:Sf3 /

PE:DRQ'd

0:DRP/C

D:Dj.P

WFSmitf-[11/f//93

JEGagl3[rdo

ABBeAch

EEColifns

/

1/ 6 /96

1/h/93

M / o'/9 -

j

,