i

  • ENCLOSURE 1 NOTICE OF VIOLATION Georgia Power Company Docket Nos. 50-424 and 50-425 Vogtle License Nos. CPPR-108 and CPPR-109 The following violation was identified during an inspection conducted on April 15 - 19,1985. The Severity level was assigned in accordance with the NRC Enforcement Policy (10 CFR Part 2, Appendix C).

10 CFR 50, Appendix B, Criterion V, as implemented by PSAR Chapter 17, Section 17.1.5, requires that activities affecting quality shall be accom-plished in accordance with documented instructions, procedures, or drawings.

Pullman Power Products (PPP) Procedure VIII-3, " Control of Welding Consum-ables", dated April 17, 1984, paragraph 7.2.1.G requires that "the QA Engineer - WMDC shall daily verify and record on attachment 1, VF-79, that the stationary holding oven temperature indicators are indicating between 250*F and 400 F."

Contrary to the above, on April 16, 1985, it was discovered that activities were not accomplished in accordance with the above in that stationary holding oven temperatures were not recorded for the date of April 14, 1985, for ovens located within the "Doublewide" welding materials distribution center (WMDC).

This is a Severity Level V violation (Supplement II).

Pursuant to 10 CFR 2.201, you are required to submit to this office within 30 days of the date of this Notice, a written statement or explanation in reply, including: (1) admission or denial of the alleged violation; (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved.

Security or safeguards information should be submitted as an enclosure to facil-itate withholding it from public disclosure as required by 10 CFR 2.790(d) or 10 CFR 73.21.

Date: