ML20127C400
| ML20127C400 | |
| Person / Time | |
|---|---|
| Issue date: | 01/12/1993 |
| From: | Norrholm L Office of Nuclear Reactor Regulation |
| To: | Pirrone S MARK IV INDUSTRIES, INC. |
| References | |
| REF-QA-99901261 NUDOCS 9301140188 | |
| Download: ML20127C400 (2) | |
Text
-
s
' Docket No.
99901261 Mr. Steven S.
Pirrone, President Statham Transducer Division Mark IV Trancducer Corporation 2230 Statham Boulevard Oxnard, California 93033
Dear Mr. Pirrone:
SU10LCT:
FUTURE NRC INSPECTION OF STATilAM TRANSDUCER DIVISION This letter confirms the dates of March 1-4, 1993, for an IJRC incpection of the Statham Transducer Division of the Mark IV Trancducer Corporation.
These dates were confirmed in a January 11, 1993, telephone call between Mr. Paul Mesmer of Statham and Mr. Richard C. Wilson of the NRC.
The incpection will review procedures and implementation of celected portions of Statham's 10 CFR Part 50, Appendix B, quality assurance program for supplying nuclear safety-related equipment, and review its 10 CFR Part 21 reporting program.
We look forward to your cooperation on this inspection.
If you have any questions, please contact me at 301/504-2961 or Mr.
Wilcon at 301/504-2997.
Sincerely, Leif J. Norrholm, Chief Vendor Inspection Branch Division of Reactor Inspection and Licensee Performance office of Nuclear Reactor Regulation Dlfi1PIRUIlDE:
Central Files / Docket File No. 99901261/ RIDS IEt09 VIB R/F DRIS H/F CRo: ei RZimmerman SAlexander q=w
- OFFICE VID/DRIL SCVID/DRIL BCVIB/DRIL RCWilsg
!!A M E CC ina M
olm lDATE 1/12./93 1//L/93 1/ /l'/ 93 6====,
mw==mm=
- COPY hp No
_ hNo Yes/h OFFICIAL RECORD COPY DOCUMENT NAME:
STATHAM.LTR 1 0 f()$
13 v11.
9301140100 930112
/
PDR GA999 E*******
/
99901261 PDR
r-1
,(0 * *8 %,'t, 6
UNIT CD ST ATES
/ e %.. c/' i NUCLE AR REGULATORY COMMISSION
. h. % T/'A%V/
I wAsHiNoton, ts c. rosu
/
- ~
January 12, 1993 Docket No.
99901261 Mr. Steven S.
Pirrone, President Statham Transducer Division Mark IV Transducer Corporation 2230 Statham Boulevard Oxnard, California 93033
Dear Mr. Pirrone:
SUBJECT:
FUTURE NRC INSPECTION OF STATHAM TRANSDUCER DIVISION Thic letter confirms the dates of March 1-4, 1993, for an NRC inopoetion of the Statham Transducer Division of the Mark IV Transducer Corporation.
Theco dates were established in a January 11, 1993, telephone call between Mr. Paul Mesmer of Statham and Mr. Richard C. Wilson of the NRC.
The inspection will review selected procedures and implementation for Statham's 10 CFR Part 50, Appendix B, quality assurance program for cupplying nuclear safety-related equipment, and will review their 10 CFR Part 21 reporting program.
We look forward to your cooperation on this inspection.
If.you have any questions, please contact me at 301/504-2961 or Mr.
Wilson at 301/504-2997.
Since ely, d,
04 V Leif Norrholm, Chief Vendor Inspection Branch Division of Reactor Inspection and Licensee Performance Office of Nuclear Reactor Regulation
..