ML20127B920

From kanterella
Jump to navigation Jump to search
Notification of 930122 Senior Mgt Meeting in Palo Alto,Ca to Discuss Reliability of Passive Sys
ML20127B920
Person / Time
Issue date: 01/07/1993
From: Joshua Wilson
Office of Nuclear Reactor Regulation
To: Pierson R
Office of Nuclear Reactor Regulation
References
PROJECT-669A NUDOCS 9301130204
Download: ML20127B920 (3)


Text

.

_PbjectNo'669-January 7,-

1993 i

MEMORANDUM FOR:

Robert C. Pierson, Director Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal, NRR FROM:

James H.-Wilson, Project Maneger.

Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal, NRR LUBJECT:

NOTICE OF PUBLIC MEETING BETWEEN THE NUCLEAR REGULATORY COMMISSION STAFF (NRC) STAFF AND ELECTRIC POWER RESEARCH INSTITUlE (EPRI)

-DATE AND TIME:

January 22, 1993 (8:30 a.m. - 4 p.m.)

LOCATION:

EPRI Auditorium, Building 1 3412 Hillview Avenue Palo Alto, California 94303 PURPOSE:

Senior management meeting to discuss reliability of passive systems.

1 PARTICIPANTS:

HRC ERL T. Murley J. Taylor W. Russell E. Kintner D. Crutchfield T. Marston l

A. Thadant, et al.

G. Bockhold, et al.

J(ames H. Wilson,d by) ject Manager Original rigne Pro Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal, NRR

Enclosure:

Proposed Agenda cc w/ enclosure:

See next page 00030

  • Meetings between the NRC technical staff and applicants or licensees are open for interested members of the public, petitioners.:intervenors, or other

-parties to attend as observers pursuant to "Open Meeting' Statement of NRC'

-Staff Policy," 43 Federal Reoister 28058, 6/28/78. _ Members of-the public who

.wish to attend should contact me at (301) 504-1108.

DISTRIBUTION:

Central File PDST R/F TMurley/FMiraglia DCrutchfield ACRS (10).

PDR

_RPierson NRR Mailrm, 12G18 JNWilson OPA JMoore,15818 JHWilson EJordan, MNBB3701 WRussell, 12018 GGrant, ED0 AChaffee,.EAB P0' Dell, PTSB SBajwa, 12G18

.AThadani, 8E2 RBorchardt l

0FC:

LA:PDST:ADAR PM:PDST:ADAR SC:

T:ADAR OFFICIAL RECORD COPY:

NAME: PShea.j g / JHWilsog RBopardt NTG122.JHW 01//[/93 01/)/9 [

N DATE:

01/ / /93 N{Q Y:l 9301130204 930107 8

PDR PROJ J #.

c

'669A PDR

r~

'e_

[

ALWR Utility Steering Committee EPRI Project No. 669 cc:

Mr. E. E. Kintner Chairman Utility Steering Committee Bradley Hill Road Post Office Box 682 Norwich, Vermont 05055 Mr. John Trotter Nuclear Power Division Electric Power Research Institute Post Office Box 10412 Palo Alto, California 94303 Mr. Brian A. McIntyre, Manager Advanced Plant Safety & Licensing Westinghouse Electric Corporation Energy Systems Business Unit Post Office Box 355 Pittsburgh, Pennsylvania 15230 Mr. Joseph Quirk GE Nuclear Energy Mail Code 782 General Electric Company 175 Curtner Avenue San Jose, California 95125 Mr. Stan Ritterbesch' Combustion Engineering 1000 Prospect Hill Road Post Office Box 500 Windsor, Connecticut - 06095 Mr. Daniel F. Giessing U. S. Department of Energy NE-42 Washington, D.C.

20585 Mr. Steve Goldberg Budget Examiner 725 17th Street, N.W.

Room 8002 Washington, D.C. _20503

F

{

p PROPOSED AGENDA SENIOR MANAGEMENT MEETING JANUARY 22, 1993 PALO ALT 0, CA 8:30 a.m.

Introduction and Opening Remarks 8:45 a.m.

Overall Status and Schedule 9:00 a.m.

Passive System Reliability and Regulatory Treatment of Non-Safety Systems 10:15 a.m.

BREAK 10:30 a.m.

Passive Sy tem Reliability and Regulatory Treatment of Non-Safety Systems (Cont.)

12:00 a.m.

LUNCH 1:00 p.m.

Status of Other Issues:

Source Term Seismic Design PRA ORAP and DRAP 3:00 p.m.

BREAK 3:15 p.m.

Status of Other Issues (Cont.):

Steam Generator Tube Rupture Catalytic Recombiners Emergency Preparedness Optimization Proposal Commission Paper on Policy Issues 3:45 p.m.

Summary and Closing Remarks 4:00 p.m.

ADJ0 URN Enclosure