ML20127B133

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-344/92-28 on 921109-1215.No Violations or Deviations Noted
ML20127B133
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 12/24/1992
From: Scarano R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Cross J
PORTLAND GENERAL ELECTRIC CO.
Shared Package
ML20127B137 List:
References
NUDOCS 9301120181
Download: ML20127B133 (3)


See also: IR 05000344/1992028

Text

,

'

.

/

p *%'g

UNITED STATES

NUCLEAR REGULATORY COMMISSION

{ '. ; REGION V l

t 1450 MARIA LANE

% , , , , , * '8 WALNUT CREEK, CAUFORNIA 945%-5368

DEC 2 41992 l

Docket No. 50-344

Portland General Electric Company

121 S.W. Salmon Street

Portland, Oregon 97204

Attention: Mr. James E. Cross

Vice President and Chief Nuclear Officer

SUBJECT: NRC IN-0FFICE INSPECTION

This letter refers to the in-office inspection conducted by Ms. G. H. Good of

this office during the period November 9 through December 15, 1992, of

activities authorized by NRC License No. NPF-1, and to the discussion of our

findings held by Ms. Good with Mr. T. Walt and other members of your staff at

the conclusion of the inspection.

This in-office inspection was conducted to review Revision 7 to emergency plan

implementing procedure EP-001, " Emergency Classification," submitted to us on

'

July 13, 1992, under the provisions of 10 CFR 50.54(q) and 10 CFR 50, Appendix

E.IV.B and E.V.

No deviations or violations of NRC requirements were identified within the

scope of this inspection. EP-001, Revision 7, continued to meet the standards

in 10 CFR 50.47(b) and the requirements in 10 CFR 50, Appendix E; however, one

of the changes appeared to decrease the effectiveness of the emergency plan.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will be glad to

discuss them with you.

Sincerely,

N

.

Ross A. Scarano, Director

Division of Radiation Safety

and Safeguards

Enclosure:

Inspection Report No. 50-344/92-28

9301120181 921224

PDR ADOCK 05000344

O PDR [ g

)I

.

v

. - . - . . .-. . -- .. . __ . . - . - _

i

-

1

pF, I

,-

cc w/ enclosure:

W. Williams, Manager, Compliance l

T. D. Walt, General Manager,. Technical Functions  !

W. Robinson, General Manager, Trojan Plant )

L. A. Girard,-Vice President and General Counsel l

C. K. Seaman, General Manager Nuclear Plant Engineering l

R. D. Machon, Plant General Manager . .

l

D. Stewart-Smith,-Administrator, Nuclear Safety and Energy Facilities, ODOE l

W. A. Bishop, Chair, Energy Facility Site Evaluation Council

R. Donovan, FEMA, Region X

.

9

9

9

W ., -

DEC 2 4 m2

bcc w/enciosure:

Docket file

Resident Inspector

Project inspector

R. Erickson, flRR/PEPB

P. Qualls

G. Cook

B. Faulkenberry

J. Martin

bcc w/o enclosure:

M. Smith

J. Zollicoffer

Region V/ ann -

'

YQUESTCOPY REQ' c5 COPY TO PDR

PIJJEST COPY

(E5 fl0 YES/fl0 YES/fl0 YES 110

cod @by' RPate RScarpno

12/lb/92 12/;f/92 12/g/92

-

m

I

i :  : .. si d