ML20127B125

From kanterella
Jump to navigation Jump to search
Forwards Draft Rev 7 to QA Program Topical Rept for Review & Approval.Reason & Basis for Changes Also Encl
ML20127B125
Person / Time
Site: Millstone, Haddam Neck, 05000000
Issue date: 06/05/1985
From: Opeka J, Sears C
NORTHEAST UTILITIES, NORTHEAST UTILITIES SERVICE CO.
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20127B129 List:
References
F0574A, F574A, NUDOCS 8506210361
Download: ML20127B125 (5)


Text

P a

  • N UTEJTIES cenerei Orrices. seioen street. seriin. Connectic.et Es$sNc i,

P.O. BOX 270

.=x vo s ama aoma cow =v HARTFORD CONNECTICUT 06141-0270 J ((,[,",C,'[*.'

(203) 665-5000 L

L June 5,1985 Docket Nos. 50-213 50-245 50-336 50-423 F0574A Dr. Thomas E. Murley Regional Administrator Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406

References:

1.

W. G. Counsil letter to T. E. Murley, A03039, dated June 8, 1984.

2.

W. G. Counsil letter to B. 3. Youngblood, " Millstone Nuclear Power Station, Unit No. 3, Transmittal of Amendment 3,"

dated August 29,1983.

3.

W. G. Counsil letter to B. 3. Youngblood, " Millstone Nuclear Power Station, Unit No. 3, Response to SER Confirmatory Item 70," dated March 1,1985.

Dear Dr. Murley:

Haddani Neck Plant Millstone Nuclear Power Station, Unit Nos.1,2 and 3 Annual Reporting of Changes to the Quality Assurance Program Proposed Revision 7 to the Northeast Utilities Quality Assurance Program Topical Report In accordance with 10CFR50.54(a)(3) and 50.55(f)(3), transmitted herewith are three (3) copies of proposed Revision 7 of the Northeast Utilities Quality Assurance Program (NUQAP) Topical Report (Attachment II) submitted for your review and approval. Proposed changes to the Topical Report are indicated by a verticalline in the right-hand ma gin. The reason and basis for each change are detailed in Attachment I which is arranged in a sequence which coincides with the Topical Report sections. Attachment I does not include minor editorial changes in accordance with 50.54(a)(3)(li) and 50.55(f)(3)(ii).

Several of the changes to the Topical Report are the result of commitments made in response to the NRC's Requests for Additional Information for the Millstone Nuclear Power Station, Unit No. 3 (References 2 and 3).

Changes which are related to specific NRC questions are detailed in Attachment I and are followed by the question number (i.e., Q260.XX).

gk D

1 0506210361 050605 I I PDR ADOCK 05000213 P

PDR L

. All changes included in proposed Revision 7 of the NUQAP Topical Report have the effect of upgrading our quality assurance program which continues to meet the criteria of 10CFR50 Appendix B.

Please note that the draf t NUQAP Topical Report is shown as Revision 7 without a date. This draft will be issued as Revision 7 and dated the same as your effective date of approval when we receive it, or sixty (60) days following this submittal as prescribed in 50.54(a)(3)(iv) and 50.55(f)(3)(iv).

If you have any questions regarding this submittal, please contact Mr. Donald O.

Nordquist at (203) 665-5447.

Very truly yours, NORTHEAST UTILITIES SERVICE COMPANY d

D J. F. Opeka Senior Vice President By: C. F. Sears Vice President cc:

U.S. NRC Document Control Desk (15 copies)

NRC Region IV Vendor Program Branch (1 copy)

3. Shediosky - NRC Senior Resident Inspector - Millstone Station (1 copy)

T. Rebelowski - NRC Senior Resident inspector - Millstone Unit No. 3 (1 copy)

P. Swetland - NRC Senior Resident Inspector - Haddam Neck (1 copy)

D. Lipinski-NRC Resident Inspector - Millstone Station (1 copy)

Attachment I Summary of Changes to NUQAP Topical Report Proposed Revision 7 ABSTRACT Deleted the reference to the revision level of Regulatory Guide 1.70.

o Applicable revisions are detailed in Appendix D.

o Changed to correct the reference to 10CFR Part 71 due to the reorganization and renumbering of Part 71.

QAP 1.0 ORGANIZATION o

Paragraphs 1.2.2 and 1.5.1 - Title change for the System Director -

Purchasing and Materials Management.

o Paragraphs 1.2.2, 1.5.2.1, 1.5.2.2, 1.5.2.3.b.4, and 1.5.2.4 - Detail reorganization, changes in title and responsibility within the Information Resources Group. This includes the addit!

of a Director - Information Resources Administration.

o Paragraphs 1.4.2, 1.4.2.1.d and 1.4.2.1.e Revised to reflect the reorganization of the Nuclear Operations Analysis Branch into the Nuclear Materials and Chemistry Branch and the Nuclear Safety Engineering

Branch, o

Paragraph 1.4.2.1.c - Deleted reference to sections and units within the Reliability Engineering Branch for consistency with other organizations described in QAP 1.0.

o Paragraph 1.4.2.2 - Added details of the organizations within the Environmental Programs Department for consistency with other organizations described in QAP 1.0.

o Figure 1.2 Details System Director Purchasing and Materials Management title change.

o Figure 1.4 - Changed to reflect the reorganization of the Nuclear Operations Analysis Branch into the Nuclear Materials and Chemistry Branch and the Nuclear Safety Engineering Branch.

o Figure 1.7 - Changed due to the reorganization of the Information Resources Group.

QAP 2.0 QUALITY ASSURANCE PROGRAM o

Paragraphs 2.1 and 2.2.3 - Clarification of the applicability of the QA program was made to correct the disagreement between these paragraphs and the first paragraph of Appendix A.

k

. QAP 4.0 PROCUREMENT DOCUMENT CONTROL Paragraph 4.2.1 - Revised to clarify that the latest Quality Assurance o

program and procedural requirements are applied to the procurement of spare or replacement parts (Q260.33).

QAP 6.0 DOCUMENT CONTROL o

Paragraph 6.2.2

- Revised to clarify that controlled document acknowledgement of receipt forms are completed and returned (Q260.30).

QAP 10.0 INSPECTION o

Paragraphs 10.2.2 and 10.2.4 - Added provisions to include accuracy requirements for inspection measuring and test equipment in job packages, inspection procedures, plans, or checklists (Q260.36 and Q260.38).

Paragraph 10.2.6 - Revised to clarify that an inspection result evaluation o

can be performed by qualified personnel outside of the NUSCO/NUPOC QA/QC organizations. This will allow Reactor Engineer evaluation of fuel inspection results and Reliability Engineering evaluation of ISI results.

QAP 12.0 CONTROL OF MEASURING AND TEST EQUIPMENT Paragraph 12.2.1 - Revised to include instruments under the heading of o

Measuring and Test Equipment.

Paragraph 12.2.2 - Revised to remove the distinction between measuring o

and test equipment and measuring and.est instruments.

QAP 16.0 CORRECTIVE ACTION o

Paragraph 16.2.1 - Revised the responsibility for review and concurrence of corrective action procedures to agree with the procedure review responsibilities of paragraphs 2.2.2 and 5.2.

APPENDIX A CATEGORY I SYSTEMS, STRUCTURES AND COMPONENTS Clarification of the applicability of the QA program was made to correct o

the disagreement between Appendix A and paragraphs 2.1 and 2.2.3 of QAP 2.0.

APPENDIX C

LIST OF TYPICAL QUALITY ASSURANCE RELATED PROCEDURES The appendix was updated to reflect current procedures issued by various o

organizations within NU.

APPENDIX D REGULATORY GUIDE AND ANSI STANDARD COMMITMENTS o

The commitment to Regulatory Guide 1.70 was updated to detail the applicable revision for each generating facility, h

I

_3 APPENDIX E GLOSSARY OF QUALITY ASSURANCE TERMS Revised the definition of Measuring and Test Equipment to include o

fixtures, reference and transfer standards and nondestructive test equipment.