Forwards Documents Listed in Attachment Re Responses to Ccmn Discovery Requests That Could Be Filed Early.Related Correspondence.W/O Encl
ML20127A871
Person / Time
Site: Millstone Dominion icon.png
Issue date: 12/31/1992
From: Hull J
NRC OFFICE OF THE GENERAL COUNSEL (OGC)
To: Marucci M
AFFILIATION NOT ASSIGNED
References
CON-#193-13508 92-665-02-OLA, 92-665-2-OLA, OLA, NUDOCS 9301120097
Download: ML20127A871 (4)


Text

' /3 #5#

ELMED CORRESPONDENCE -

ga atoug A

  • +

3 ) *

,n UNITED STATES

' 32/c"'

<-r,-

3

,i NUCLEAR REGULATORY COMMISSION

-4 f

WASHINGTON, D.C. 20656 0EC 31' P2 37 December 31, 1 92 l' '

Iu h;.- r:

Ms. Mary Ellen Marucci 104 Brownell Street New Haven, CT 06511 In the Matter of NORTHEAST NUCLEAR ENERGY COMPANY (Millstone Nuclear Power Station, Unit No. 2)

Docket Nos. 50-336-OLA (ASLBP No. 92-665-02-OLA)

(Soent Fue'l Pool Desian)

.j

Dear Ms. Marucci:

In its December 28, 1992 Order, the Licensing Board requested the NRC staff to send to Dr. Kaku, before the January 21,_1993 deadline, any responses to CCMN's discovery requests that could be filed early.

You made a

similar request during our last conversation.

The enclosed documents, which are listed on the attachment hereto, are those which have so far been identified as being responsive to CCMN's discovery requests.

Copies of the enclosed documents are being sent to Dr. Kaku and to NNECO's counsel.

Note that copies of documents which are already in your possession, as indicated in the attached document list, are not being produced.

Please contact us should you have any questions.

Sincerely, sg

/ohnT J

. Hull Counsel for'NRC Staff cc:

Service List h

f DO J

rr

LIST OF DOCUMENTS PRODUCED

[ Note:

The paragraph numbers correspond with those of CCMN's discovery requests dated December _5 and 16,_1992.

The amendment

. documents listed refer-to amendments of operating license number DPR-65 for the Millstone Nuclear Power Station, Unit No.

2.

The amendment applications refer to applications filed by Northeast Nuclear Energy Company (NNECO).)

1.

(a) 6/30/77 amendment / 30, with appl'ications dated 11/22/76, 2/4/77, and 5/16/77.

(b)'

5/29/80 amendment / 58, with application dated 5/9/80.

(c) 2/22/82 amendment / 72, with application dated 12/17/81.

(d) 1/15/86 amendment / 109, with supporting environmental assessment (EA) dated 12/16/05,. and. applications dated 7/24/85, 9/16, 10/17, 11/25, and 12/3/85.

(e) 6/2/87 amendment'/ 117, with 5/27 EA, and applications dated 5/21/86 and 5/27/87.

(f) 3/31/88 amendment

/

128,.

With 2/24/88 EA, and-applications dated 4/30/87 and 8/11/87.

(g) 6/13/90 amendment / 146, with application dated 4/10/90.

(h) 3/13/92 LER-92-003 (previously produced as attachment to staff's letter to Licensing Board dated 7/1/92).-

(i) 3/24/92-NRC Information Notice 92-21.

I (j) 4/22/92 Supplement to Information Notice 92-21.

(k) 6/4/92 amendment / 158, with applications dated 4/16/92 and 5/7/92 (previously produced as attachments to staff's letter to Licensing Board dated 7/1/92, and attachment to NNECO's letter to Licensing Board dated 7/1/92).

(1) 6/25/92 updated LER-92-003.

(m) 8/7/92 NNECO letter to CCMN answering criticality questions, with attached HOLTEC benchmark calculations (previously produced).

(n) 11/20/92 staff coquest for additional information (RAI)=

sent to NNECO regarding criticality analysis (copy mailed'to CCMN per RAI's certificate of service).

(o) 11/24/92 NNECO response to.RAI (copy mailed to CCMN per NNECO's certificate of service dated 12/15/92).

4 W

s v

t 2.

(a) 8/25/79 Brand Industrial Services, Inc. Technical Report 748-30-1.

(b) 8/86 Electric Power Research Institute (EPRI) Report NP-4724.

(c) 9/8/87 NRC Information Notice 87-43.

(d) 12/88 EPRI Report NP-6159.

(e) 8 / 7 / 90. NNECO letter to NRC re Millstone 2 Boraflex degradation (copy mailed to CCMN by NNECO letter to CCMN dated 9/10/92).

(f) 10/1/90 NNECO letter to NRC re Millstone 2 Boraflex degradation (copy mailed to CCMN by NNECO letter to CCMN dated 9/10/92).

(g) 11/15/90 NRC RAI to NNECO re Millstone 2 Boraflex degradation.

(h) 1/4/91 NNECO response to RAI re Mills' tone 2 - Boraflex degradation (copy mailed to CCMN by NNECO letter to CCMN dated 9/10/92).

(1) 2/7/91 NRC letter to NNECO with attached safety evaluation re Millstone 2 Boraflex degradation.

(j) 8/16/91 EPRI letter to NRC re Boraflex shrinkage.

(k) 11/21/91 NNECO letter to NRC re Millstone 2 Boraflex degradation.

(1) 6/4/92 amendment # 158, with applications dated 4/16/92 and 5/7/92 (previously produced as attachments to staff's letter to Licensing Board dated 7/1/92, and attachment to NNECO's letter to Licensing Board dated 7/1/92).

(m) 8/7/92 NNECO letter to CCMN answaring CCMN question about Boraflex (previously produced).

(n) 9/10/92 NNECO letter to CCMN enclosing submittals to NRC listed above dated 8/7/90, 10/1/90, and 1/4/91 re Millstone 2.

Boraflex degradation (previously produced).

3.

No documents will be produced in response to this request.

f.eq NRC letter dated 12/29/92 filed in this proceeding.

4.

See technical specifications for boron concentration in the Millstone 2 spent fuel pool, contained in item 1(k) referenced above.

(

-5.

Any Boraflex studies in the NRC Staff's possession are as listed ' above - in Paragraph 2.

If there is any information regarding radiation exposure in the listed documents, _ the-NRC staff-would object to it,s use in this proceeding as being outside the scope of_the criticality concerns relevant here.

6.

Documents responsive to this request are referenced above in items 1(k) and 1(o).

7.

Any relevant criticality information in the NRC staff's possession-responsive to this request would be in the-documents listed above in Paragraph 1.

8a.

The documents listed above as items 2(a), 2 (b), 2 (d), and; 2(j) are responsive to this request.

Any reports that are only "under consideration" are not final reports, and the NRC staff does not necessarily have in itc possession or control all EPRI and~ industry reports that may be relevant.

The NRC staff does not agree with CCMN's definition of "high density,"

and documents cannot be identified on that basis.

8b.

As stated in the NRC letter dated 12/29/92 filed in this proceeding, what is "not immediately apparent" and what "may cause an otherwise unexpected variance in the exposure of the neutron absorbing materials" are not self-defining and are too vague to provide a basis for discovery.

However, it is believed that'the documents in response-to other discovery requests supply this information.

9.

No " programs" of the type described in the request have as yet been identified by the NRC staf f.

Any such " programs" will be identified in a timely response.

10. -The NRC staff will file a timely response to-Paragraph 10 of CCMN's December 16, 1992 discovery request.

11.

No documents will be produced in response to this request.

See NRC letter dated 12/29/92 filed in this proceeding.

12.

No documents will be produced in response to this request.

Ee2 NRC letter dated 12/29/92_ filed in this proceeding.

13.

No documents will be produced in response to this request.

Sag NRC letter dated 12/29/92 filed-in this proceeding.

14.

No documents will be produced in response to this request.

Hag NRC letter dated 12/29/92 filed in this proceeding.

15.

No documents will be produced in response to this request.

Sag NRC letter dated 12/29/92-filed in this proceeding.

16.

The NRC staff will file a timely response to Paragraph 16 of CCMN's December 16, 1992 discovery request.

__