ML20127A658

From kanterella
Jump to navigation Jump to search
Submits Quarterly Status Rept Re Const Activities,In Accordance w/831014 Memorandum & Order.During Fourth Quarter 1992,no Significant safety-related Const Activities Performed.Change in Activity Not Anticipated
ML20127A658
Person / Time
Site: Washington Public Power Supply System
Issue date: 01/04/1993
From: Reynolds N
WASHINGTON PUBLIC POWER SUPPLY SYSTEM, WINSTON & STRAWN
To: Bloch P, Bright G, Schink D
Atomic Safety and Licensing Board Panel, TEXAS A&M UNIV., COLLEGE STATION, TX
References
CON-#193-13516 OL, NUDOCS 9301120033
Download: ML20127A658 (1)


Text

,-

mm.., -

r 9.

s WINSTON & STIMWN

~

.,m<..-,m,...,,

4,00. 3:ntt1 n o

,c ao e,m,

-s-

-.~,....m.

,en on rooos 3502

>>=*=a-

- wo, -

'93 Jtd -7 P2 :03 -

x 2,3,, m

, %*C L%

"s= = =

.m

n. m n,

.. e January 4, 1993 Peter B.

Bloch, Esquire David R. Schink Chairman, Atomic Safety and Department of Oceanography Licensing Board Texas A&M L*niversity U.S.

Nuclear Regulatory College Station, Texas 77843 Commission Washington, D.C.

20555 Mr. Glenn O.

Bright Atomic Safety and Licensing Board U.S. Iluclear Regulatory Commission Washington, D.C.

20555 Subj:

Washington Public Power Supply System (WPPSS Nuclear Project Ho. 1) Docket No. 50-460-OL Gentlemen:

In accordance with the October 14, 1983, Memorandum and Order in the captioned proceeding, the Washington Public Power Supply System hereby submits its quarterly status report regarding construction activities at WNP-1.

During the fourth quarter of 1992, no significant safety-related construction activities were performed at WNP-1, although a limited engineering effort was continuing.

We do not anticipato any change in this level of activity during the next several months.

Sincer <y, k

Nicholas Rb olds Counsel,, r Applicant cc:

Service List h

9301120033 930104

{DR ADOCK 05000460 PDR 3

..