Docket No. 50-295
Docket No. 50-304
Commonwealth Edison Company
'
ATIN: Mr. L. O. De1 George
Vice President, Nuclear Oversight and
Regulatory Services
Executive Towers West III
1400 Opus Place, Suite 300
Downers Grove, IL 60515
Dear Mr. DelGeorge:
This refers to the routine safety inspection conducted by
J. D. Smith,
R. J. Leemon, R. B. Landsman, D. E. Jones, F. A. Maura, and J. R. Walker of this
office from November 10 through December 21, 1992. The inspection included a
review of activities authorized for your Zion Nuclear Generating Station. At the
conclusion of the inspection, the findings were discussed with those members of
your staff identified in the enclosed report.
The enclosed copy of our inspection report identifies areas examined during the
inspection.
Within these areas, the inspection consisted of a selective
examination of procedure and representative records, observations, and interviews
with personnel.
During this inspection, certain of your activities appeared to be in violation
of NRC requirements. An previously unresolved item for an inadequate procedure
for splitting of the component cooling water system in the event of a leak was
determined to be a violation. As described in the enclosed inspection report,
the violation was categorized at Severity Level V.
A Notice of Violation is not-
being issued because the criteria specified in Sections III.A. and V.G.1 of the
" General Statement of Policy and Procedures for NRC Enforcement Actions",
Enforcement Policy,10 CFR Part 2, Appendix C (1992) were satisfied.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed inspection report will be placed in the NRC Public
Document Room.
,
11001G
9301120027 930107
n
ADOCK 05000295
/ (/
G
'
--
--
.- -._. _ -___
.
4
Commonwealth Edison Company
2
3AN
71993
We will gladly discuss any questions you have concerning this inspection.
,
Sincerely,
Odsinal Sknca by 15.run J. n rdw
Martin J. Farber, Chief
Reactor Projects Section lA
Enclosure:
Inspection Reports
No. 50-295/92032(DRP);
No. 50-304/92032(DRP)
cc w/ enclosure:
R. Tuetken, Site Vice President
S. Kaplan, Regulatory Assurance
Supervisor
D. Farrar, Nuclear Regulatory Services
Manager
DCD/DCB (RIDS)
OC/LFDCB
Resident Inspectors, Zion, Braidwood,
Byron
R. Hubbard
!
J. McCaffrey, Chief, Public Utilities
l
Division
'
Mayor, City of Zion
Licensing Project Manager, NRR
R. Newmann, Office of Public Counsel,
State-of Illinois Center
R. Thompson, Administrator, Wisconsin
Division of Emergency Government
State Liaison Officer
1
i
.
RI[
l
Farber
,
%
.w.,,,..-r
-
"I5
9
--T--"$r'
,-TP-T
F ut
e
eM%.F.h-rJu--
.,e
%
.e.+ca
er
wwwva--
e
-r
w
-w-
a*m%.v-g-r.w:-r-retme-_=m-m
umummw.
,,e.
.
-