Ack Receipt of 921130 Request for Renewal of Certificate of Compliance 5908 for Model DOT-6M Type B Package.Certificate of Compliance 5908 Terminated & Use of Package No Longer Authorized.New B&W Package Design Currently Under Review
ML20127A607
Person / Time
Site: 07105908
Issue date: 01/07/1993
From: Macdonald C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Maxin A
NUCLEAR FUEL SERVICES, INC.
References
NUDOCS 9301120018
Download: ML20127A607 (1)


Text

.? SGTB:MGB 71-5908 JAN 7 1393 Nuclear fuel Services, Inc.

-ATTN: Mr. Andrew M. Maxin P. O. Box 337, MS 123 Erwin, TN 37650

Dear Mr. Maxin:

This refers to your letter dated November 30, 1992, requesting renewal of Certificate of Compliance No. 5908 for the Model No. DOT-6M Type B package.

Certificate of Compliance No. 5908 has been terminated, and use of the package under the General Li::ense of Subpart C of 10 CFR Part 71, or under the provisions of 49 CFR S173.471, is no longer authorized.

Babcock and Wilcox 1

Company, the certificate holder, chose to replace the Model No. 00T-6M Type B package with a new package design, which is currently under NRC review. _The certificate was extended on two occasicas to provide a transition period to develop a replacement packaging.

If you wish to apply for-a ne.: sertificate which authorizes use of'the DOT-6M Type B package, you must submit an application which shows that the package design meets all the requirements of 10 CFR Part. 71, including the containment -

provisions in 10 CFR 971.51, and the double containment provisions for plutonium in 10 CFR G71.63. The application should be whole and complete in itself and 'in' the format of Regulatory 7.9.

Include engineering-drawings of the package design, a complete description of the contents and materials'of-construction, operating procedures, acceptance tests, and a maintenance program.

Show that the materials of construction used_for the~ containment vessels have adequate fracture toughness.

Also, in.the sections.on operating procedures, acceptance tests, and a maintenance program, include the leak tests that will be performed on the package before first use, before.each 4

shipment, and annually.

4 if you have any questions regarding 'this matter, we would be pleased to meet with.you and your staff.

Sincerely, Original Signed By Charles E. MacDonald, Chief Transportation Branch 4

Division of Safeguards and Transportation, NMSS y/T [ s ["]O ]E } gyljf Distribution:

  • " *b P*
NRC
FC NMSS r/f NRC POR SGTB r/f OFC SGTB gj C SGTB-c
SGTB, 6

SGTB G

SGTB SGTB y

NAME' MGBailey ERZf6hr CRNMfell CEMIcdoN1d b 93

//b/93

/ / 7 /93

/

/93

/

-/93-I

/

k DATE

'l / b /93

//

11'0=09 c Cover E = Cover & Enclosure N = No Copy 0FFICIAL RECORD COPY 9301120018 930107

.h PDR ADOCK 07105908 g

C PDR

-