ML20126M681

From kanterella
Jump to navigation Jump to search
Forwards Info Re Fee Assessment for Review of NEDE-22290, Suppl 1, Safety Evaluation of GE Hybrid I Control Rod Assembly for BWR4/5C Lattice, Per 790921 Request
ML20126M681
Person / Time
Issue date: 06/12/1985
From: Thomas C
Office of Nuclear Reactor Regulation
To: Solander L
Office of Nuclear Reactor Regulation
References
TAC-56929, NUDOCS 8506200424
Download: ML20126M681 (3)


Text

>

June 12, 1985 MEMORANDUM FOR: Lars Solander, Chief Planning and Resource Analysis Branch Office of flucicer Peactor Pegulation FROM:

Cecil 0. Thomas, Chief Standardization f. Special Proiects Branch Division of Licensing

SUBJECT:

DATA FOR FEES Ot: COPPLETED TOPICAL REPORT

Reference:

Memorandum for f!RR Division Directors from H. N. Perkow

" Obtaining Cost Data for Fees on Completed Projects" dated September 2I, 1979 In accordance with the referenced ncnorandum, I have enclosed the requested information for your use in determining the fee to be assessed for the review of the following topical report: flEDE-22290, Supplement 1,

" Safety Evaluation of the Generei Electric Hybrid I Control Rod Assembly for the BWR4/5 C Lattice".

Original signed by Cecil 0. Thomas, Chief Standardization & Special Projects Branch Division o# Licensing

Enclosure:

As stated cc:

M. Garver R. Diggs DISTRIBUTION:

'Cn treT 2 11e tlRC PDR DCS SSPB Reading P. Noonan D. Moran H. I!erkow C. Thomas R. Diggs f

ac h[Y

/

' ll /85

> gg /85 06/g/85 06//22B5

/

m=wn nW4k C

  1. pa asrug'o,,

UNITED STATES 8

NUCLEAR REGULATORY COMMISSION o

7.

E WASHINGTON, D. C. 20555

\\,,,,, * *I s

June 12, 1985 MEMORANDUM FOR: Lars Solander, Chief Planning and Resource Analysis Branch Office of Nuclear Reactor Regulation FROM:

Cecil 0. Thomas, Chief Standardization & Special Projects Branch Division of Licensing

SUBJECT:

DATA FOR FEES ON COMPLETED TOPICAL REPORT Reference :

Memorandum for NRR Division Directors from H. N. Berkow

" Obtaining Cost Data for Fees on Completed Projects" dated September 21, 1979 In accordance with the referenced memorandum, I have enclosed the requested information for your use in determining the fee to be assessed for the review of the following topical report:

NEDE-22290, Supplement I, "Sefety Evaluation of the General Electric Hybrid I Control Rod Assembly for the BWR4/5 C Lattice".

14 Q. y

r :

Cecil 0. Thomas, Chief Standardization 8 Special Projects Branch Division of Licensing

Enclosure:

As stated cc:

M. Garver R. Diggs

DATA FOR FEES ON COMPLETED TOPICAL REPORTS 1.

APPLICAFT: General Electric Company 2.

PEPORT MUMBER: NEDE-22290, Supplement 1 REPORT TITLE:

" Safety Evaluation of the General Electric Fybrid I Control Rod Assenbly for the BWR 4/5 C Lattice 4

REPORT DATE:

October 1984 5.

START DATE OF PFVIEW: March 4, 1985 6.

CDMPLETION DATE OF REVIEW: May 24, 1985 7.

MANPOWER ACTIVITY CODE:

8.

TACS NUMBER:

56"P9 A.

BAR (if applicable)

R.

FIN NOS. (if applicable)

C.

TOTAL PROGRAM SUPPORT DOLLARS ASSIGNABLE TO TH'S P.FFORT:

9.

NAME OF TOPICAL REFORT MANAGER / EXTENSION: David H. Moran, x29409 10 NAME AMD ADDRFSS OF COMPANY TO BE BILLED:

J. F. Klappreth, Principal W. Brooks, CPR Centact, stated that the review was performed without Licensing Engineer contractor assistance.

Nuclear Techreloofes and Fuel Division General Electric Company 175 Curtner Avenue San Jose, California 95125

11. HAME AND PHONE NUMBER OF CONTACT PERSON AT COMPANY:

J. F. Klapproth (408) 925-5434

-