.._.
- ..O.t6 tion fio. 6 J '
L..,', _.; s n t a l ' Ag re er:.e r,. ;;.
~
C; *.'.:: !!o. NRC-04-77-13a 4
.A-
.V SUPPL El' ENTAL ' AGREEMENT BETWEEN VIRGINIA POLYTECHNIC INSTITUTE A'iD THE U. S. NUCLEAR REGULATORY COMMISSION day of July
, 19 81, by THIS SUPPLEMENTAL AGREEMENT, effective-the is't and between the UNITED STATES OF AMER!CA (hereinafter referred to "Goverr.mant"), as represented by the UNITED STATES UUCLEAR PEGULATORY CO SION (hereinafter referred to as the' "Comission"),. and VIRGINIA POLYTECHNIC INSTITUTE (hereinafter referred to as the " Contractor"),
WITNESSETH THAT:
as hereinaf ter WHEREAS, the parties desire to modify Contract No. NRC-04-77-134d by law, inc
. provided, and this supplemental agreement is authorizeRe Energy:
1954, as amended.
NOW, THEREFORE, said contract is hereby modified as follows:
Appendix A, attached to this' supplemental agreement and made a provides for the research to be performed by the Contractor during th 1.-
contract period specified therein.
30, 1982 In Article II - The Period of Performance, the date " June 2.
is substituted for the date " June 30, 1981 is substituted for In Article III - Consideration, the sum "$ 406,696'.00" 3.
the su:n "$ 301,633.00".
4 81oatso p
- + - = ~ - ~.. - _,.,,, _,,
$ U p f ', 0.
Contract !.0.
faC-C'-77-12.:
rage 2
IN Ulit!ESS lliEREOF, the parties have executed 'his document.
UNj-r; 5 TATE 5 0F Af4 ERICA Y
cu HiL
~~~
SY: 1:ellogg h(;orton, Chief -
'scarch contracts Branch vision of Contracts t
L, Nuclear Regulatory Cor.nission By: Virginia Polytechnic Institute and State University /dldf
]_ tim _A, H. Kreb[Vice President for Admin,
~
_ certify that I am the Margie W._ Thomas I, _
(attester) of the Contractor named under this Clerk to the Board of Visito_rs_
(tit 1M
_teho signed this A. H. Krebs ument; that
-(~Tgna tory) s Vice President for__Administratian document on bahalf of said Contractor vias then of said Contractor; that this document rias duly signed for and on behaif of said Contractor by authority of its governing body and is within the scope of its legal porters.
IN WITNESS l! HEREOF, I have hereunto af fixed my hand and the seal of said Contractor.
1.
TV Margie @f Visitors Thomas, Clerk to the Board o
( S EAl.)
-i9
C r.-3::
'0. NRC-04,
CONT?.aCICR:
VIRGINIA POLYTECHNIC INSTITUTE AND STATE UNIVERSITY AFFENDIX A For the Cer,tr:-ct period July 1,1981 through June 30, 1982 Article A-I RE_ SEARCH TO BE PERFCFFE0 SY CCNTRACTOR (a) The unclassified scope of work under this contract entitled " Central Virginia Regional Seismic Network" is as follows:
The Contractor will:
1.
Install two additional seismic stations (short-period vertical seismoneters, radio telemetry) in the Giles County subnetwork.
These stations would be at each end (northeast and southwest) of tne Giles County zone.
2.
Monitor seismic activity.
Determine hypocenters and focal mechanisms, insofar as possible, for recorded seismic events.
3.
Integrate seismic and geologic results to develop, insofar as possible, a complete geologic understanding of the seismic regime.
4.
Publish a quarterly bulletin listing location, depth, magnitude of any regional event (Southeast U.S.).
5.
Notify the NRC of any ir,teresting regional f arthquake as quickly as practical.
(b)
Tne Princi Fal Investicator expects to 6 vote the following approximate amount (s) of time to the c:ntract wrk:
Prof. G. A. Soliinger - 151 cf his time for 12 months.
-l ARTICLE !.-II UAYS AND MEANS OF PERFOR.'MNCE (a)
Items for t.hich support will be provided as indicated in /.-III, hicw (1)
Salaries and Maces 36,5/5.00 14,000.00 (2)
Equipment to Le purchased or fabricated by the Contr5ctor Ovc r 51,000.00 Two (2)~ Radio Teleratry Sta tions - $14,000.00 (An pli fiers, vco's, seisareters, antennas, trensr itters, receivers, solar panels, power supplies, discrit:nators, batteries, field and lab housings, spares).
Mifici...an '.:.
(
Supplerentai l5n.
v'. =
Ccntract No.
IEC-;-.~ 7 -134 o
~
- ppendix A Page 2 3,000.00
~
(3)
Tc.v 21 (i)
Domestic (ii)
Foreign (4)
C'her direct costs 24 percent applicable' (5)
Indirect costs based on a predetermined rate of to total direct costs less individual items of equipment in excess of 5500.00, Subcontracts and Subgrants in excess of $25,000.00, alterations and renovations, stipends, tuition payments, and rental costs of off campus facilities.
Items, if any, significant to the performance of this contract, but (b) excluded from computation of Support Cost and from consideration in proportioning costs:
flone Time or effort of Principal Investicator(s) including indirect costs (c) and fringe benefits contributed by Contractor but excluded from com-putation of Support Cost and from consideration in proportioning costs:
Prof. G. A. Bollinger - 15% of his time for.12 months.
Article /.-III Tlle total estimated cost of items undar A-II(a) above for the contract period stated in this Appendix A is $105,063.00 ; the Commission will pay 100 parcant of the actual costs of these items incurred during the contract period stat 2d in this 'ppendix A, subject to the provisions of Article III and A B-XX.VIII.
this *ppendix A is $105,063.00 The estim3ted 1.'RC Support Cost is funded as follows:
-0 ~
(a)
Estimated unexpanded balance frcm prior period (s) 105,063.00 (b)
I;ew funds for the current period The new funds being added in A-III(b) constitute the basis for advance (c) pagants provided undar Article E-X.