BALTIMORE G AS AND ELECTRIC COMPANY P.O. BO X 147 5 B A LTIMOR E. M AR YL AN D 21203 HUCLEAR POWER DEPARTMENT COLVERT CLIFFS NUCLEAR POWER PL ANT LUS9Y. M ARYLAND 20657 June 17,1985 U. S. Nuclear Regulatory Commission Division of Licensing Washington, D.C. 20555 ATTENTION:

Mr. David H. Jaffe, Project Manager Operating Reactors Branch #3

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit No.1, Docket No. 50-317 Barton Pressure Transmitters

REFERENCE:

(1)

A. E. Lundvall, Jr. to J. R. Miller letter dated February 22,1985, Eighth Cycle License Application

Dear Mr. Jaffe:

This letter is to document an earlier telephone conversation you had with J. A. Mihaleik concerning Barton Pressure Transmitters.

The Barton Pressure Transmitters were not replaced during the Unit 1 seventh refueling as previously planned.

Instead we have decided to leave the existing transmitters installed for Unit 1 Cycle. 8.

Leaving the existing transmitters in the system has not affected the uncertainty factors used in the reload analysis in Reference (1).

Very truly yours, i

l m

7 an Genfral Supervisor Traiying & Technical Services RED / JAM /Imt ec:

D. A. Brune, Esquire G. F. Trowbridge, Esquire T. Foley, NRC T. Magette, DNR 8506200319 050617 l

PDR ADOCK 05000317 5

P PDR 1

1 0 u