ML20126M093
| ML20126M093 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 01/05/1993 |
| From: | Hagan R WOLF CREEK NUCLEAR OPERATING CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20126M098 | List: |
| References | |
| NA-93-0001, NA-93-1, NUDOCS 9301080200 | |
| Download: ML20126M093 (3) | |
Text
,.
e LP CREEK W4) NUCLEAR OPERATING CO Robert C Hagan Vce Prevdent Naciear Assorwre January 5, 1993 NA 93-0001 U. S. Nuclear Regulatory Commission ATTN Document Control Desk Mail Station P1-137 Washington, D. C. 20555
Reference:
Letter NA 92-0073 dated October 28, 1992 from R. C. Hagan, WCNOC, to NRC
Subject:
Docket No. 50-482:
Proposed Revision to License and Technical Specifications for Power Rerate Gentlemen:
This letter transmits an application for amendment to Facility Operating License No. NPF-42 for Wolf Creek Generating Station (WCGS), Unit 1.
This license amendment request proposes revisions to the operating license and various technical specification sections to allow plant operation at 3565 megawatts thermal (MWth) versus the current 3411 MWth and implement the T um reduction program to extend the range of T down 15*F from the current um value.
Certain of the analyses performed to support these revisions were done to support the Cycle 7 technical specification changes, which were submitted to the Nuclear Regulatory Commission in the Reference.
The remaining analyses performed to support these revisions are discussed in the attachment which provides the Power Rerate Report.
Implementation of this proposed revision to the WCGS license and technical specifications is planned for mid-cycle 7
operation (appro.imately December 1993).
The attached Power Rerate Report provides a
detailed safety evaluation / analysis associated with. the proposed changes, a significant hazards consideration determination, an environmental impact determination, and markups of the proposed technical specification and operating license changes.
}
9301080200 930105 PDR ADOCK 05000482 P
PDR PO Box 411/ Burbngton, KS 66839 / Phone. (316) 361-8831 I
g{jJ
.m o o - ~ ~., m.c m
E l
1
.NA 93-0001.
Page 2 of 2 i
In accordance with 10 CFR 50.91, a copy of this application, with attachments, is being provided to the designated Kansas $ tate Official.
If you have any. questions concerning this natter. please ' contact ~ me at (316)364-883'1 Ext. 4553 or Mr. Kevin J. Moles of.my staff at Ext'. 4565.
Very.truly yours,-
W
./
R bert C. Hagan Vice President Nuclear Assurance RCH/jra Attachment ces A. T. Howell (NRC), w/a J. L. Milhoan (NRC), w/a G. A.. Pick (NRC), w/a V. D. Reckley (NRC), w/a 1.
,,-nn e,-
-,,,.-r.,
--r
{
STATE OF KANSAS
}
) SS COUNTY OF COFFEY
)
Robert C. Hagan, of lawful age, being first duly sworn upon oath sayslthat he is Vice President Nuclear Assurance of Wolf Creek Nuclear Operating Corporation; that he has read the foregoing document and knows the content thereof; that he has executed that same for and on. behalf of said Corporation with full power and authority to do so and that the facts therein stated are true and correct to the best of his knowledge, information and belief.
') /
',$ i f
A{-f7m Dy
/
Rofert C. Hagan /
'l Vice President s
Nuclear Assurance SUBSCRIBED and sworn to before me this 5 "i day of. Tan.
, 1993, 4
DENglLVORN th tm_ g h h') dog ge -
STATE 0F KANSAS Notary Public.
- M*W' ~s'- Af y Appt Exp, e
t /M190 Expiration Date I fCA/9//
. ~,.- -.. -. _,
= -. ~..... -.....
.-