Text
.......
.A.
fg NUCLEAR REGULATORY COMMISSION
[
yd j
RecioN iv 8
611 RYAN PLAZA oRIVE. SUlTE 400
-o%
f ARLINotoN, T EXAS 760118064 SN 5E Docket No. 50-298 License No. DPR-46 Nebraska Public Power District ATTN:
Guy R. Horn, Nuclear Power Group Manager P. O. Box 499 Columbus, Nebraska 68602-0499
SUBJECT:
COOPER NUCLEAR STATION EMERGENCY PLAN We have received your letter dated October 7,1992, which transmitted Revision 18 to the Cooper Nuclear Station Emergency Plan and your letter dated December 17, 1992, which transmitted an addendum to Revision 18 of the Plan.
The plan revision and its addendum were submitted pursuant to 10 CFR 50.54(q) and involved your recent consolidation of three Operational Support Centers into a single Operational Support Center located adjacent to the Technical Support Center and within its habitability envelope.
During the management meeting held in Region IV on October 30, 1992, we described the NRC's position on your consolidation of Operational Support Centers into an Operational Support Center which is co-located with the Technical Support Center.
As we discussed, this would be acceptable if an appropriately equipped alternate Operational Support Center was identified which could be used should the use of the primary Operational Support Center threaten the habitability of the Technical Support Center.
Your December 17, 1992 addendum to Revision 18 of your plan identifies an alternate Operational Support Center.
We have reviewed your submittals and determined that we need additional information in order to assess the impact of the changes on the effectiveness of emergency planning at Cooper Nuclear Station.
Specifically, please describe the communications equipment and capabilities which would be available to the alternate Operational Support Center should its activation be required. Also, please inform us of your plans to test the functional suitability of the alternate Operational Support Center in drills or exercises. These matters were discussed by telephone between Dr. D. Blair Spitzberg of this office and Mr. M. Krumland of your organization on December 30, 1992.
930 000059 930105 PDR ADOCK 05000298 F
PDR..
I h
v
Nebraska Public Power District Please provide-the requested information so that we can continue our review.
Should you have any questions concerning this_ letter, please contact Dr. Spitzberg at (817) 860-8191.
Sincerely, L. J. ' allan, Director-Divis' n of Radiation Safety and Safeguards cc:
Nebraska Public Power District ATTN:
G. D. Watson, General Counsel P.O. Box 499 Columbus, Nebraska 68602-0499 Cooper Nuclear Station ATTN: _ John M. Meacham, Site Manager P.O. Box 98 Brownville, Nebraska 68321 Nebraska Department of Environmental Control ATTN:
Randolph Wood, Director P.O. Box 98922 Lincoln, Nebraska 68509-8922 Nemaha County Board of Commissioners ATTN:-Richard Moody, Chairman Nemaha County Courthouse 1824-N Street Auburn, Nebraska 68305 Nebraska Department of Health ATTN:
Harold Borchert, Director Division of Radiological Health 301 Centennial > Mall,. South P.O. Box 95007
- Lincoln, Nebraska.68509-5007 Kansas Radiation Control Program Director Program Manager FEMA Region 7 l
911 Walnut ~ Street, Room 200 j
,]_.
l l
l 4
Nebraska Public Power Olstrict Director Nebraska Civil Defense Agency 1300 Military Road Lincoln, Nebraska 68508 Y
m
e Nebraska Public Power District bec:
DMB p 45)
J. L. Milhoan, RA Resident Inspector, CNS Leah Tremper, LFDCB (MS 4503)
FIPS_ FILE.
Section Chiof. DRP/J. Gagliardo MIS System d
RIV File DRP RITS Coordinator DRS L. J. Callan, DRSS l
J. P. Jaudon, DRSS B. Murray, FIPS D. B. Spitzberg, Inspector G. Bates Project Engineer, DRP/E. Collins H. Rood,NRRProjectManager(MS13E16)
R. Erickson, NRR (MS 9 H15) k E-92.10 RIV:FIPS v C:FIPS W /,
D:DRSS D:QRP, DBSpitzberg:nh BMurray-
[MCallan AIM
\\
/ / 4 l'13
//4/97 TM /qh i /4 /q Je
Nebraska Public Power District bec:
DMB(A045)
J. L. Hilhoan, RA Resident Inspector, CNS LeahTremper,LFDCB(MS4503)
.FIPS FILE
-Section Chief, DRP/J. Gagliardo MIS System RIV File DRP RITS Coordinator DRS i
L. J. Callan, DRSS J. P. Jaudon, DRSS B. Murray, FIPS D. B. Spitzberg, inspector G. Bates Project Engineer, DRP/E, Collins H. Rood,NRRProjectManager(MS13E16)
R. Erickson, NRR (MS 9 H15)
\\
E-92-10 RIV:FIPS w C:FIPSW'/,
0:DRSS D:ARP DBSpitzberg:nh BMurray I'5 Callan Alddh
_i/ 4 / W
// 4/ 97 i M /4h t /4 /w e
,s;