Text
___________ - _ _ _ _ ___ - _
bc5
,,
.
JAN 011993
Docket Nos
50 352
50-353
Mr. D. M. Smith
Senior Vice President -
Nuclear
Philadelphia Electric Company
Nuclear Group lleadquarters
Correspondence Control Desk
P. O. Ilox 195
Wayr.,, PA 19087-0195
,
Dear Mr. Smith:
SUlijECT: INSPECTION REPOl(T NOS. 50-352/92-30 AND 50-353/92-30
j
.
This letter refers to the inspection conducted by _Mr. J. E. Carrasco of this office on
,
l
November 30 - December 4,1992, at the Chesterbrook ofDce and at the Limerick
Generating Station, Units 1 and 2. The inspector discussed the results of the inspection with
Mr. G. V. Cranston and other members of your staff at the conclusion of the inspection.
This inspection focused on activities important to public heal'th and safety and was directed
towards engineering activities with emphasis on the adequacy of programs for engineering
,
and technical support of the plant operations including management support, interfaces with -
_c
internal and external organitations, design modifications, and professional pronciency of the
'
engineering staff engaged in the design modifications.
Details on the areas examined during the inspection are described in the NRC Region I
inspection report, which is enclosed with this letter Within these areas, the inspection
_
-
consisted of selected examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
-
.
9301000016 930101 "
ADOCK 05000352-
,
o
a
i
.j4
r
-
-
.
.
_
_
. . .
.
.- -
-.
.
JAN 011993
'
Mr. D. M. Smith
2
Within the scope of this inspection, no violations were observed. We noted that the design
activities to support the plant operations were controlled in accordance with the appilcable
NRC regulations.
No reply to this letter is required. Your cooperation in this matter is appreciated.
Sincerely,
Originni Signed By
T'. X. Tapen
Jacque P. Durr, Chief
Engineering 11 ranch
l
L
Division of Reactor Safety
Enclosure: NRC Region 1 Inspection Report Nos. 50 352/92 30 and 50-353/92-30
cc w/ encl:
R. Charles, Chairman, Nuclear Review Board
D. R. IIelwig, Vice President - Limerick Generating Station
G. J. Beck, Manager Licensing Section
G. Madsen, Regulatory Engineer - Limerick Generating Station
. ,
Secretary, Nuclear Commit'ee of the lloard
Public Document Room (PDR)
Local Public Document Room (LPDR)
.
'
Nuclear Safety Information Center (NSIC)
K. Abraham, PAO (2)
NRC Resident inspector -
Commonwealth of Pennsylvania
F
bec w/ encl:
Region'I Docket Room (with concurrences)
,
E. Wenzinger, DRP
'
C. Anderson, DRP
N. Perry, SR1, Yankee Rowe
DRS/EB SALP Coordinator
.
V. McCree, OEDO
Frank Rinaldi, NRR
j
W. Lanning, DRS _
t
~ 1
._7
- w-w
+
__ .. _ _
-
_ . - _.
.-
_
. _
-
-.
_.
-
. .
9
JAtt 011933
Mr. D. M. Smith
3
I
-
.f
I
i
i
F
Y
)
. o-
1
D (r
RS -'
RI:DRS -
RI:DRS -
,
Gray ;;.
Carrajco
i-
'
f//4 f < f C
. (~/i4
' -
i
12/lf/92
12/u/92
~ 12/S)'92
l
l
OFFICIAL RECORD COPY
A:1.lM9230,JC
I
l
l
l
- . -
-
m_
_ ,
,~.4
, , . , , - .
,
,
- . - . . , . .
...,m,m....+,
m.
.
,.