Forwards Insp Repts 50-352/92-30 & 50-353/92-30 on 921130- 1204.No Violations Noted
ML20126L326
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 01/01/1993
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20126L329 List:
References
NUDOCS 9301080016
Download: ML20126L326 (3)


See also: IR 05000352/1992030

Text

___________ - _ _ _ _ ___ - _

,, bc5

.

JAN 011993

Docket Nos 50 352

50-353

Mr. D. M. Smith

Senior Vice President -

Nuclear

Philadelphia Electric Company

Nuclear Group lleadquarters  :

Correspondence Control Desk

P. O. Ilox 195

Wayr.,, PA 19087-0195 ,

Dear Mr. Smith:

SUlijECT: INSPECTION REPOl(T NOS. 50-352/92-30 AND 50-353/92-30 j .

This letter refers to the inspection conducted by _Mr. J. E. Carrasco of this office on ,

l

November 30 - December 4,1992, at the Chesterbrook ofDce and at the Limerick

Generating Station, Units 1 and 2. The inspector discussed the results of the inspection with

Mr. G. V. Cranston and other members of your staff at the conclusion of the inspection.

This inspection focused on activities important to public heal'th and safety and was directed

towards engineering activities with emphasis on the adequacy of programs for engineering ,

and technical support of the plant operations including management support, interfaces with - _c

internal and external organitations, design modifications, and professional pronciency of the '

engineering staff engaged in the design modifications.

Details on the areas examined during the inspection are described in the NRC Region I

inspection report, which is enclosed with this letter Within these areas, the inspection _

-

consisted of selected examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

-

.

9301000016 930101 "

PDR ADOCK 05000352- ,

o PDR

a

i

.j

- - . . _ _ . . . . .- - -.

4 r

.

'

JAN 011993

Mr. D. M. Smith 2

Within the scope of this inspection, no violations were observed. We noted that the design

activities to support the plant operations were controlled in accordance with the appilcable

NRC regulations.

No reply to this letter is required. Your cooperation in this matter is appreciated.

Sincerely,

Originni Signed By

T'. X. Tapen

Jacque P. Durr, Chief

Engineering 11 ranch l

L

Division of Reactor Safety

Enclosure: NRC Region 1 Inspection Report Nos. 50 352/92 30 and 50-353/92-30

cc w/ encl:  ;

R. Charles, Chairman, Nuclear Review Board

D. R. IIelwig, Vice President - Limerick Generating Station

G. J. Beck, Manager Licensing Section

G. Madsen, Regulatory Engineer - Limerick Generating Station . ,

Secretary, Nuclear Commit'ee of the lloard

Public Document Room (PDR)

Local Public Document Room (LPDR) .

'

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (2)

NRC Resident inspector -

Commonwealth of Pennsylvania F

bec w/ encl:

Region'I Docket Room (with concurrences) ,

E. Wenzinger, DRP '

C. Anderson, DRP

N. Perry, SR1, Yankee Rowe

DRS/EB SALP Coordinator .

V. McCree, OEDO

Frank Rinaldi, NRR j

W. Lanning, DRS _

t

~1

._7

  • w-w +

__ .. _ _ - _ . - _. .- _ . _ - -. _. -

. .

9

JAtt 011933

I

Mr. D. M. Smith 3

-

.f

I

i

i

F

Y

)

. o-

1

RI:DRS - RI:DRS - RS -' ,

i- Carrajco D (r

'- Gray ;;. '

f//4 f < f C

i

.

(~/i4

12/lf/92 12/u/92 ~ 12/S)'92

l

OFFICIAL RECORD COPY

l

I A:1.lM9230,JC

l

l

l

- . - - m_ _ , ,~.4 , , . , , - . , , - . - . . , . . ...,m,m....+, m. . ,.