ML20126L263

From kanterella
Jump to navigation Jump to search
Forwards Initial SALP Repts 50-277/91-99 & 50-278/91-99 for 910804-921031
ML20126L263
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 12/31/1992
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20126L265 List:
References
NUDOCS 9301080003
Download: ML20126L263 (3)


See also: IR 05000277/1991099

Text

w

DC

S

.'

y7

- '(,

s

'DEC 311932

. Docket Nos. 50-277

50-278

Philadelphia Electric . Company

Correspondence Control Desk

'

NITN:

Mr. Dickinson M. Smith

~

Senioi' Vice President-Nuclear

P. O. Box 195

Wayae, PA 19087-0195

Dear Mr. Smith:

Subject:

INITIAL SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE

(SALP) REPORT NUMBER 50-277/91-99; 50-278/91-99

An NRC SALP Board, conducted on December 4,1992, reviewed and evaluated the

performance of activities at the Peach Bottom Atomic Power Station for the period of August

4,1991, through October 31,.1992. The enclosed Initial SALP Report documents the results

of this assessment. As previously agreed, we will hold a meeting with you and your staff on

January 20,1993, at the Peach Bottom Conference Center to discuss the findings of this-

evaluation.

During this assessment period, both units continued to be operated in a safe manner. This

SALP noted stronger performance in most of the functional areas. Performance in the

Emergency Preparedness and Securite areas continued to be excellent. Improvements in

Radiological Controls was evidenced by an improving trend in that area. Improvements were

also observed i- the Operations area.

This assessin

also highlighted several areas needing improvement. Increased management -

nttention is needed to address weaknesses in the maintenance and performance monitoring

area. These weaknesses contributed to equipment performance problems that resulted in

unnecessary challenges to the phnt staff and plant transients. Further, continued emphasis .

on improving the quality and timeliness of corrective actions is warranted.

At the SALP meeting you should be prepared to discuss our assessment, and your plans to

-improve performance. The meeting is intended to be a candid dialogue wherein any-

comments you have, regarding our report, are discussed. Additionally, you may provide

written comments within 20 days after the meeung. In accordance with NRC policy, this

meeting will be open for public observation.

.9301080003 921221 I

1

i

' PDR - ADOCK 05000277e

.O

PDR_

lpl

l

,

P

l[/

i

,

v'

I

f

I

'

1

, , , ,

-

gcS1

2

Your cooperation with us is appreciated.

Sincerely,

Ofiginal signed By:

Thomas T. Malt,iri

Thomas T. Martin

Regional Administrator

Enclosure: Initial SALP Report No. 50-277/91-99; 50-278/91-99

cc w/ encl:

R. N. Charles, Chairman, Nuclear Review Board

D. B. Miller, Vice President, Peach Bottom Atomic Power Station

G. Rainey, Manager, Vice President, Nuclear Services Department

G. Cranston, General Manager, Nuclear Engineering Division

C, Schaefer, External Operations-Nuclear, Delmarva Power & Light Co.

K. P. Powers, Plant Manager, Peach Bottom Atomic Power Station

A. A. Fulvio, Regulatory Engineer, Peach Bottom Atomic Power Station

G. J. Beck, Jr., Manager, Licensing Section

J. W. Durham, Sr., Senior Vice President and General Counsel

J. A. Isabella, Director, Genention Projects Department, Atlantic Electric

B. Gorman, Manager, External Affairs

R. McLean, Power Plant Siting, Nuclear Evaluations

D. Poulson, Secretary of Harford County Council

R. Ochs, Maryland Safe Energy Coalition

J. H. Walter, Chief Engineer, Public Service Commission of Maryland

Public Document Room (PDR)

I ocal Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (30)

Commonwealth of Pennsylvania

TMI - Alert (TMIA)

Maryland Delegate James Harkins

Institute for Nuclear Power Operations (INPO)

cc w/ encl: (Via E-Mail)

K. Abraham, PAO

NRC Resident inspector

The Chairman

Commissioner Curtiss

Commissioner de Planque

Commissioner Rogers -

Commissioner Remick

.

-

..- . -

.

. --

.

..

..

-- --

.. . - -

.

h;J/.

DEC 3111992

,

,

.

.;

.

' Philadelphia Electric Company

-3

bec w/ encl: ' (Via . E-Mail )

Region I Docket Room (}vith concurrences)-

' J. Taylor, EDO

,

V. McCrec, OEDO

_;

J. Lieberman, OE

,

L. Wharton, NRR

P. Stohr, DRSS, Reg 11

T. Martin ~, RA

!

W. Kane, DRA

D. Holody, ORA

C. Hehl, DRP

J. Wiggins, DRP

E. Wenzinger, DRP

C. Anderson, DRP

M. Conner, DRP

J. Lyash, DRP

M. Evans, DRP

,

F. Bonnett, DRP

W. Hodges, DRS

- W.- I2nning, DRS

J. Durr, DRS

L. Bettenhausen, DRS

DRS/EB SALP Coordinator

R. Cooper, DRSS

S. Shankman, DRSS

J. Joyner, DRSS

R. Keimig, DRSS

E. McCabe, DRSS

J, Laughlin, DRSS -

1

.

-A. Della Ratta, DRSS

D. Chawaga, .DRSS

dF

/

J.-Shea, NRR

a

C. Miller, NRR

ok

'

J. Douglas, DRMA

lbv5

G',r,nx4

Mf*

Cootur

RP

R-

RI!DRP

RI:RA

RJ V .

.RI:DRP

('

I

c'G

/Lyash.

CAlderson

E enzingerg\\ He

TMartin

12p2

12/Jf'92

12/j[/92-

12//c592

12//o'92-

3a[1v

i2;/M

' OFFICIAL RECORD. COPY

-

..

.