ML20126L184
| ML20126L184 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 07/27/1985 |
| From: | Smyth C GENERAL PUBLIC UTILITIES CORP. |
| To: | Rothberg O NRC |
| References | |
| 0330A, 330A, 5211-85-1270, NUDOCS 8507310096 | |
| Download: ML20126L184 (1) | |
Text
.
MEMO from:
COURTNEY W. SMYTH TMIl LICENSING MANAGER July 27, 1985 5211-85-1270 T0:
Owen Rothberg US NRC FROM:
C. W. Smyth Attached are three procedures used at THI-1 that relate to CRD lead screw uncoupling:
1.
Procedure 1504-12 Rev 6 is the preferred procedure referenced by Procedure 1501-1 Rev 8 (partial copy attached).
This procedure rotates the CRDM torque tube and does not disengage the lead screw nut locking spring.
2.
Procedure 1504-1 Rev 3 is used in-lieu of 1504-12 only under special circumstances on an as-needed basis. This procedure has not been used at TMI-1 since 1977.*
This completes GPUN's action as discussed in our teleconference call on July 26, 1985.
I C. W. Smyth
[
0330A CWS/jgb cc:
R. J. McGoey
- One CRDM was uncoupled in 1982 J.
Janiszewski to demonstrate the tooling for C. E. Hartman the TMI-2 vessel inspection using procedure 1504-1.
8507310096 850727 DR ADOCK 0500 9
g
\\
io
~
8 i
' 34-M
.,tb..
r-= = * - '
' ' " '