Forwards Revision 2 of Draft Interim Reliability Evaluation Program Phase II Procedure & Schedule Guide. Probabilistic Risk Assessment Technical Steering Committee 810324 Meeting Minutes Encl
ML20126K725
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 04/15/1981
From: Bernero R
NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
To:
NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
Shared Package
ML20126K728 List:
References
RTR-NUREG-0660, RTR-NUREG-660 NUDOCS 8105210089
Download: ML20126K725 (5)


Text

,

=

s

[

UNITED STATES 15mf f NUCLEAR REGULATORY COMMISSION

' s,

- */

WASHINGTON, D.C. 20555 April 15,1981 NOTE T0:

Fil e FROM:

Robert M. Bernero, Director Division of Risk Analysis Office of Nuclear Regulatory Research This draft IREP Procedure and Schedule Guide is being used in the IREP Phase II studies and was made available to contributors to the NREP Precedures Guide as a resource document.

~.

//gj a]

f

. n_,

Robert M. Bernero, Director Civision of Risk Analysis p

Office of Nuclear Regulatory 3.esearch i

Enclosure:

As stated l

81052100%%

THIS DOCUMENT CONTAINS POOR QUAUTY PAGES

r-- -

PROBABILISTIC RISK ASSESSMENT S

Technical Steering Comittee

4 h

O' Hare Hilton - Chicago, II.

I

!8S7 C March 24, 1981 N//

b N

(

1.)

Approval of minutes of Februarv 10, 1981 meeting. MOTION was made and seconded to approve the minutes as written; passed without dissent.

1.5) Membership of Steering Concittee. MOTION was =ade and seconded to accept Herb Feinroth, DOE, as a member of the Technical Steering Committee; passed without dissent.

2.)

Availability of resources. The NRC had indicated in late February that a funding problem had been raised regarding support for development of the entire scope of the Procedures Guide. This necessitated interrupting the work of.the-74G.

Subsequent to this indication, the NRC was able to resolve its ircediate concern in providing financial support by supple-menting contractual agreements with Sandia National Laboratory.

In addi-tion to this resolution, substantial funding was of f ered by DOE to help support the program in view of its involvement in developing pRA methods.

EPRI also increased its financial support to the project. These funding arrangements, together with prior ccmmitments, are expected to be adequate to make it possible to complete the project.

The T4G will be asked to resume its work i= mediately.

3.)

Evaluation of scope and impact on schedule.

In view of the favorable funding situation, the Steering Committee reaffirmed its intent to pursue the scope as originally defined for the Procedures Guide.

Because of the delay imposed by the possibility of insufficient funding, a readjustment of the schedule was made necessary. Approximately five weeks has been lost from the effort and this will be accommodated by modifying the review cequence. A preliminary schedule developed during this meeting is attached. This schedule will be refined by Mr. Hickman and the T4C with the objective of adhering to the schedules established for the IEEE and ANS conferences in 10/81 and 4/82.

4.)

Status of peer reviewers.

Mr. Mallay reported on behalf of the ad hoc committee responsible for selection of peer reviewers and consultants.

A roster of approximately 25 reviewers and 3 consultants has been prepared and most of the people contacted. Nearly all individuals who were requested to perform the review and consulting services were enthusiastic about being able to make a contribution to the Procedures Guide. A complete list of these personnel will be submitted to the Steering Committee upon confirmation that all are willing to serve.

I

-.. - ~ _, - - -. - - -.,., _ _. _. _...

.,_,___._,J

Technical Steering Committee Minutes, March 24, 1981 Page There is a possibility that a few of the reviewers vill require financial

{

support to adequately fulfill this commitment. The consultants vill be supported through the IEEE grant.

5.)

ANS Conference, status.

Ian Wall, Program Manager, Risk Assessment, EPRI, has accepted the position of Technical Program Chairman for the American Nuclear Society Conference on " Methods for Probabilistic Risk Assessment" scheduled for April 4 - 7, 1982.

6.)

Next meeting of TSC.

The next meeting of the Steering Committee vill be held in Chicago on June 2, 1981.


,e e+

-r-,

..-a-e,

PROSABILISTIC RISK ASSESSMENT Technical Steering Cc=.ittee Meeting Date: March 24, 1981 O' Hare Hilton Hotel 20B3 Attendance List Members R. M. Bernero U.S. NRC J. T. Boettger PSE&G K. S. Canady Duke Power H. Feinroth U.S. DOE R. J. Gowen IEEE J. W. Hickman Sandia Laboratories I. N. Howell IEEE S. Levine NUS Corporation J. F. Mallay NSAC E. P. O'Donnell Ebasco (AIF)

W. L. Stiede Ceco A. Torri' PLG Guests, Alternates, (etc. )

Affiliation Member Represented James 3. Owens IEEE Robert S. Walleigh IEEE, Washington office I

O o

PRELIMINARY SCHEDL'I.E PRA Procedures Guide 4/1 Restart Project 4/21-22 TWG progress meeting (review elements of first draft) 5/19-20 TWG progress meeting (draft review) 6/17-18 Final TWG progress meeting (preparation of draf t for peer review) 7/10 All Procedures Guide material sent to Technical Editor for typing, editing, and distribution 7/30 Distribution of the Procedures Guide for peer reviev 8/21 All co=ments received by Jack Hickman for consideration by the TWG 8/24-28 TWG meeting to prepare preliminary responses to co==ents, discuss =ajor issues with the Steering Co::ittee, and incorporate co=ments into the Procedures Guide 9/11 Draft of the Procedures Guide sent to Technical Editor for typing, editing, and distributien 9/28' Distribution of the Procedures Guide in preparation for the IEEE Review Conference

~