ML20126K548

From kanterella
Jump to navigation Jump to search
Ack Receipt of Transmitting Rev 29 to Safeguards Plan.Changes Consistent W/Provision of 10CFR50.54(p) & Acceptable
ML20126K548
Person / Time
Site: Cooper Entergy icon.png
Issue date: 01/04/1993
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Horn G
NEBRASKA PUBLIC POWER DISTRICT
References
NUDOCS 9301070170
Download: ML20126K548 (4)


Text

,M,$

g NUCLEAR REGULATORY COMMISSION j

Zi j

R EGloN it/

f 611 RYAN PLAZA DRIVE, SUITE 400 o,

f ARLINGTON, TEXAS 760114064 t

Docket No. 50-298 License No. DPR-46 Nebraska Public Power District ATTN:

Guy R. Horn, Nuclear Power Group Manager P.O. Box 499 Columbus, Nebraska 68602-0499

SUBJECT:

COOPER NUCLEAR STATION SAFEGUARDS PLAN This acknowledges the receipt of your letter dated November 24, 1992, by which you transmitted Revision 29 to the Cooper Nuclear Station Safeguards Plan for your facility.

We reviewed the changes in the letter and attachments and found them to be consistent with the provisions of 10 CFR 50.54(p). Accordingly, your proposed changes are acceptable for inclusion into the plan.

The enclosures to your letter contain Safeguards Information of a type specified in 10 CFR 73.21 and are being withheld from public disclosure.

Sincerely, n

/

l y

L.J.Cala[, Director

[ Division 'of[ Radiation Safety and Safeguards cc:

i Nebraska Public Power District ATTN:

G. D. Watson, General Counsel P.O. Box 499 Columbus, Nebraska 68602-0499 Cooper Nuclear Station ATTN: John M. Meacham, Site Manager l

P.O. Box 98 l

Brownville, Nebraska 68321 l

1

{' *9 %

l 930207o170 ffjy3i

a Report of Chance Revision ;? for the Coocer Nuclear Station Safeguarcs Plan.

~his revision reflects changes to our organitational strutture anc corrasconcin:;

position titles.

3e D is tr:.t t has concluded that the enclosec chante does not 'iecrease tne safeguares ef fectiveness of the plan.

The material enclosed herewith contains safeguards Infor:ation as cefinco by 10 CFR Part 73.21 and its disclosure to unautneri::ed incividuals is prohibiten.

Therefore, we request ~the material to be withheld frem puolic disclosure.

Sincerely,

/

/u G[R\\, Horn NuYlear Power Group Manager

/rg

Enclosures:

(Controlled Copied 1-4)

IS. Nuclear Regulatory Con: mission (2) cc:

Regional Office Region IV (Controlled Copies 5 and 6)

.'.~dC Res ident Inspector Cooper Nuclear Station (w/o enclosures; f

MMMM gy[00 fG f-Radie e omem a w

.0 Nebraska Public Power District.

bec w/nonsafeguards portion of letter dated November 24, 1992 DMB (RG01)

DRP Project Engineer, DRP/J. Gagllardo Section Chief, DRP/E. Collins DRS L. J. Callan, D/DRSS J. P. Jaudon, DD/DRSS B. Murray, C/FIPS T. W. Dexter, Security Inspector CNS, Resident Inspector MIS RITS Coordinator FIPS Security File 50.54(p) Book (CASEWORK)

RIV File Elaine Koup, RSGB/NRR (MS 9024)

Leah Tremper, LFDCB (MS 4503)

AI-S-92-11 n f.D:DRb D:,QRP RIV:FIPS a C:FNS TWDexter:nh Akurray Y SIJCallan AdB$ach IQ/3'/9b k//d9)-

Ngh/9k

'o1/4 /93 CASEWORK #50-298/28-XA A