ML20126K324

From kanterella
Jump to navigation Jump to search
Notification of 930111 Meeting w/ABB-CE in Windsor,Ct to Discuss Status of Design Certification Review of Sys 80+. Proposed Agenda Encl
ML20126K324
Person / Time
Site: 05200002
Issue date: 01/04/1993
From: Wambach T
Office of Nuclear Reactor Regulation
To: Miraglia F, Murley T, Russell W
NRC
References
NUDOCS 9301070093
Download: ML20126K324 (5)


Text

i /he-def dL

[ 'o

~,,

UNITED STATES 47' NUCLEAR REGULATORY COMMISSION c g i WASHINGTON, D. C. 20555 .

t. 8

+, ,/ January 4, 1993 Docket No.52-002 MEMORANDUM FOR: T. Murley G. Lainas R. Zimmerman F. Miraglia J. Roe B. Boger W. Russell J. Zwolinski C. Thomas J. Partlow M. Virgilio F. Congel D. Crutchfield B. Grimes E. Butcher W. Travers J. Richardson W. Bateman, ED0 F. Gillespie B. D. Liaw R. Nease S. Varga A. Thadani Operations Center J. Calvo G. Holahan C. Rossi THRU: Robert C. Pierson, Director Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation FROM: Thomas V. Wambach, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors-and License Renewal Office of Nuclear Reactor Regulation

SUBJECT:

DAILY HIGHLIGHT - FORTHCOMING MEETING WITH ABB-COMBUSTION ENGINEERING (ABB-CE) FOR SYSTEM 80+ (SENIOR MANAGEMENT MEETING)

DATE AND TIME: January 11, 1993 (8:30 a.m. - 5 p.m.)

LOCATION: Combustion Engineering, Inc.

1000 Prospect Hill Road Windsor, Connecticut PURPOSE: Meeting to discuss the status of the design certification review of the System 80+, A proposed agenda is enclosed.

06000i IEi!C E E 03]IG CGPY

.. i

/

9301070093 DR 930104 8 ADOCK.05200002 *I PDR-

r

] Y;

.g

,2- January'4, 1993-i :'

PARTICIPANTS *: HE ABB-CE T. Hurley R. Newman D. Crutchfield ~R. Matzte W; Russell C. Brinkman A. Thadani- .J._Longo B.-Liaw L. Gerdes ,

R. Pierson K. Scarola "

R. Borchardt D. Harmon M. Franovich S. Ritterbusch T. Wambach R.-Turk:

T. Crom D. Finnicum R. Mitchell- '

-J. Rec R..Schneider G. Hedrick

-(Originalsigneb'bk'

Thomas V. Wambach, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal-Office of Nuclear ReactorjRegulation

Enclosure:

Meeting Agenda cc w/ enclosure:

See~next page

  • Meetings between the NRC technical staff _and' applicants or licensees are - b open --for interested members of the public,' petitioners, sintervenors, or other parties to attend _as-' observers-pursuant to "Open Meeting 1Statemer.t'of-NRC Staff Policy," 43 Federal Reaister 28058,'6/28/78.. Members of the:

. public who wish to attend should contact- me at-(301)_ 504-1121. ,,

DISTRIBUTION:

Docket-File :PDST R/F SBajwa, 12G18 ;RPierson PDR- JNWilson TVWambach RBorchardt-TBoyce MXFranovich PShea- OPA-EJordan,-MNBB 3701 GGrant, EDO ACRS (10) -

_MMalloy NRR Mailroom,12G18 P0' Dell, PTSB - JMoore, 15B18 . J0'Brien, RES--

CMcCracken, 801 RPerch,3 8D1 0FCi LA:PDST:ADAR _PM:Pg:ADAR SC:PgT:ADAR: q NAME: PSheag/ TWaNbIh$f[z ,l 1RBohiardt-

- DATE: 01/h93 101/M/93 01/ /93-

'0FFICIAL100CUMENT. COPY:.lCHlll93.TVW?

\

4 .

ABB-Con.Lustion Engineering, Inc. Docket No.52-002 cc: Mr. C. B. Brinkman,. Acting Director Nuclear Systems Licensing Combustion Engineering, Inc.

1000 Prospect Hill Road Windsor, Connecticut 06095-0500 Mr. C. B. Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.

12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Mr. Stan Ritterbusch Nuclear Systems Licensing Combustion Engineering, Inc.

1000 Prospect Hill Road Post Office Box 500 Windsor, Connecticut 06095-0500 Mr. Daniel F. Giessing U. S. Department of Energy NE-42 Washington, D.C. 20585 Mr. Steve Goldberg Budget Examiner 725 17th Street, N.W.

Washington, D.C. 20503 Mr. Raymond Ng 1776 Eye Street, N.W.

Suite 300 Washington, D.C. 20006

f-;t ;..

y a.

.: . L.

NRC-CE SENIOR MANAGEMENT MEETING Windsor, Connecticut January 11, 1993 Pronosed Aaenda 8:30 - 8:45 Introductions and agenda review 8:45 - 9:30 Design summary 9:30 - 9:45 Technical approach to Chapter 15 analysis 9:45 - 11:00 Process for " road-mapping" of PRA insights (including severe accidents) into design,.IfAAL,=SAMDAs, sabotage protection, and EPGs/SAMGs 11:00 - 11:30 Submittal schedule

-11:30 - 12:00~ Documentation of issue closure 12:00 - 1:00 LUNCH 1:00 - 3:00 Technical issues (see next page for break out of issuesLwhich may not-be closed by March 15,1993) 3:00 - 5:00 .Nuplex 80+ demonstration.

Enclosure

y! ,

a' NRC-CE SENIOR MANAGEMENT MEETING-

-Windsor, Connecticut.

January 11, 1993 Proposed Aaenda (continued)

Break Out of Technical Issues (1:00 - 3:00)

Fire and flood protection Crom Sabotage protection (including vital equipment lists) Finnicum Structural design detail Gerdes Inservice testing and inspection Mitchell PRA Finnicum-I

New RAls on shutdown risk Mitchell Severe accident deterministic analyses Schneider I&C diversity Hyde Intersystem LOCA Cross HFE Harmon PASS design Cross Scope of. design (radwaste building, combustion turbine Turk building, fuel storage, etc.)

Leak-before-braak Gerdes RCP seal coolability Cross Plant systems Mitchell ITAAC Rec