Application to Amend License NPF-8,changing App a Tech Specs to Allow Time Delay for Starting of Diesel 2C & Energization of Unit 1 River Water Pumps Prior to Energizing Unit 2 River Water Pump
ML20126K071
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 05/05/1981
From: Clayton F
ALABAMA POWER CO.
To: Youngblood B
NRC
Shared Package
ML20126K072 List:
References
NUDOCS 8105110204
Download: ML20126K071 (3)


Text

ie

.'s l Milling Addrsss Alabama Power Cornpany i 600 North 18th street Post Office Box 2641 Birmingharn, Alabama 35291 k

Telephone 205 783 0081

{

F. L Clayton', Jr.

b i

s0'JZ7l"'

Alabama Power l

.May 5, 1981 tresouthem etectric svarem t

N Docket No. 50-364 i

{

Director of Nuclear Reactor Regulation tU

.#' 0 3 6 5

~j " Yg# h U. S. Nuclear Regulatory Commi< don

' Washington, D.C.

20555

/ee a

(,/

Attention:. Mr. B. J. Youngblood

'(,,,, f j

RE:

CHANGE TO NPF-8 APPENDIX A TECHNICAL SPECIFICATIONS l

Gentlemen:

While performing surveillance testing required by Section 4.8.1.1.2C.4 l

on the Unit 2 related diesels, it was determined that Diesel 2C, by design, does not energize the Unit 2 emergency bus (2J) within 10 seconds.

Diesel 2C i

is designed to energize the train B river water pumps for Unit 1 and/or Unit 2 during Loss of Offsite Power (LOSP) on one or both units.

In order w

to avoid the simultaneous starting of Unit 1 and Unit 2 river water pumps

?

during a two unit LOSP, the Unit 2 output breaker from Diesel 2C is blocked approximately 20 seconds. This time delay. allows for the starting of Diesel 2C l

and energization of the Unit 1 river water pumps prior to energizing the Unit 2 i

river water pump.

! is a typical Diesel 2C sequencing of loads during LOSP on i

I both units.

If an LOSP is not experienced on both units the time to energize bus 2J is unaffected due to the blocking of the output breaker. We, therefore, request a revision to the Appendix A Technical Specifications included as.

The only exception to the 10 second requirement to energize emergency busses' would be for Diesel 2C based on the design energization l

sequence described above and described in Attachment 2.

Alabama Power Company has determined that no unreviewed safety question will exist as a result of this change to the Technical Specification.

No j

bases of a design basis accident review is~affected by delaying the energization of bus 2J shown in Attachment 2.

i l

The Plant Operations Review Committee and the Nuclear Operations Review j

Board have reviewed the above proposed changes and have determined that the changes do not involve an unreviewed safety question as shown in the attached safety evaluation.

i l

f 8105110 2d//

t l

Director of Nuclear Reactor Regulation May 5, 1981 U. S. Nuclear Regulatory Commission Page 2 i

The class of'each item in this proposed amendment is designated as l

Class III for Unit 1 and Class I for Unit 2 according to 10 CFR 170.22 requirements. ' Enclosed is a check for $4,400 to cover the total amount

+

of fees required.

In accordance with 10 CFR 50.30(c)(1)(i), three signed originals and thirty-seven additional copies of these proposed changes are enclosed.

i If you have any questions, please advise.

a Yours very truly,

{

F. L. Claytp, Jr.

j t

FLCJr/RLG:aw l

l Attachments SWORN TO AND SUBSCRIBED BEFORE i

ME THIS Gid DAY OF cc: Mr. J. P. O'Reilly

&m

,19 6/.

l Mr. R. A. Thomas U

Mr. G. F. Trowbridge Mr. E. A. Reeves i

Mr. W. H. Bradford j f) i Mr. J. Thoma

..ur J /faho i

paryPublic l

My Commission Expires:

j

"[h"N b

. ', ' ' (

f

' l

. q.

.:, \\ ; ;f )/

i M

.'D.,

/.,[.,,/

i

,l' l

o. c..e I

k G Cb th Qf

\\

DG 2C LOSP TYPICAL SEQUENCE OF EVENTS TIME EVENT 0

LOSP (Signal to start Diesel 2C and trip breaker DG-13) 1 SEC BUS ld&2J Load shed and starts 20 second timer for BUS 2J 10 SEC 2C D/G Energizes BUS lJ and its permanent loads 15 SEC RW 4 Starts 20 SEC RW 5 Starts 21 SEC 2C D/G Energizes BUS 2J and its permanent loads 26 SEC RW l Starts 31 SEC RW 2 Starts 36 SEC RW 3 Starts m-

- - -