MONTHYEARML20207F1521999-05-25025 May 1999 Notice of Violation from Investigation Rept 1-94-021 on 940506-960329.Violation Noted:Between 740831-910407,licensee Made Changes to Facility Described in Safety Analysis Rept for Refueling Core Offloads Without Performing Evaluation ML20205M7201999-04-0606 April 1999 Notice of Violation from NRC OI Case 1-96-002 & Conclusions of Millstone Independent Review Team.Violation Noted. E Debarba,Deliberately Discriminated Against Supervisor in Performance Engineering Group at Millstone Station ML20205M7351999-04-0606 April 1999 Notice of Violation from Investigation in Case Numbers 1-96-002 & 1-97-007.Violation Noted:Licensee Discriminated Against Supervisor in Performance Engineering Group at Plant Due to Involvement in Protected Activities ML20207M1131999-03-0909 March 1999 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $88,000.Violation Noted:Employment of Two Contractor Employees Terminated in Aug 1997,in Part Because Individuals Raised Concerns Re MOV Program Manual ML20199C6381999-01-0707 January 1999 Notice of Violation from Insp on 981006-1123.Violation Noted:On or Before 981120,conduit 9-15,in Fire Area A-24,not Sealed & Tested in Accordance with Astme E-119,fire Endurance Test ML20195H6901998-11-18018 November 1998 Notice of Violation from Insp on 980818-1005.Violation Noted:Engineering Evaluations Not Performed When RCS Heatup Rate Limit Exceeded on 951217 & When RCS Cooldown Rate Limit Exceeded on Three occasions,940424,0728 & 951215 ML20155B1521998-10-23023 October 1998 Notice of Violation from Insp on 980810-0903.Violation Noted:Design Basis,As Described in FSAR Chapter 14,Accident Analyses Had Not Been Correctly Translated Into Plant Procedures & Acceptance Criteria ML20154D1151998-09-11011 September 1998 Notice of Violation from Insp on 980413-24-0511-15,27-29, 0609-11 & 23-25.Violation Noted:Program Implemented TS 6.8.4.a,failed to Include Provisions to Reduce Leakage from RSS Heat Exchangers to SW Sys ML20237B0741998-08-12012 August 1998 Notice of Violation from Insp on 980428-0629.Violation Noted:Licensee Failed to Direct Test Personnel to Close & Lock RHR Outboard Drain Valve ML20237D3041998-08-12012 August 1998 Notice of Violation from Insp on 980413-0508.Violations Noted:Two Examples Identified Where Licensee Not Performing Leakage Testing of safety-related Valves in Sys That Could Contain Highly Radioactive Fluids During Accident ML20249C6931998-06-19019 June 1998 Notice of Violations from Combined Insp on 980301-0427. Violations Noted:Prior to 980424,instrument Min Accuracy of Wind Speed Channels Were Not Measured as Required by Table 3.3-8 of Unit 2 TS 3/4.3.3.4 ML20249B0421998-06-12012 June 1998 Notice of Violations from Insp on 980413-24.Violations Noted:Only 1 RCS Loop Operable W/Plant in Mode 4 on 980407 ML20236L5381998-06-11011 June 1998 Notice of Violation from Insp on 980302-0409.Violation noted:post-mod Test Procedure Did Not Incorporate Requirements Contained in Design Documents ML20249B0811998-06-11011 June 1998 Notice of Violation from Insp on 980209-20.Violation Noted: Between 1992 & 1993,appropriate C/A Not Taken to Prevent Recurring Air Binding Problems for Boric Acid Transfer Pumps ML20249B2171998-05-26026 May 1998 Revised Notice of Violation from Insp on 980101-0228. Violations Noted:As of 980210,21 nonsafety-related SOVs in High Pressure & Low Pressure Safety Injection Sys & Four nonsafety-related SOV in RCS Not Included in EQ Program ML20248E5951998-05-26026 May 1998 Notice of Violation from Insp on 980101-0228.Violation Noted:On 980225,NRC Determined That Written Equipment Control Procedures Were Not Established to Process Revs to Sys Valve Lineups ML20248A7781998-05-22022 May 1998 Notice of Violation from Insp on 980302-31 & 980412. Violation Noted:Structural Steel Support Members Did Not Meet 3-h Fire Barrier Criterion,In That on & Before 980304, Columns D2-54,D2-53 & A4-52 Had Gaps in Fire Rated Coating ML20248F3061998-05-0808 May 1998 Notice of Violation from Insp on 980223-0306.Violation Noted:Listed Examples Were Identified Where Requirements of 10CFR50 App B,Criterion Xvi, Corrective Action, Were Not Met ML20247D8561998-05-0606 May 1998 Notice of Violation from Insp on 980223-26.Violation Noted: Between 1988 & 980226,licensee Failed to Maintain Adequate PASS Program That Ensured Capability to Obtain & Analyze Samples Under Post Accident Conditions ML20217M9091998-04-0808 April 1998 Notice of Violation from Insp on 980209-27.Violation Noted:As of 980227,measures Were Not Established to Assure That Design Basis of safety-related MOVs Was Correctly Translated Into Specifications,Drawings & Instructions ML20216F9841998-04-0303 April 1998 Notice of Violation from Insp on 980105-0206.Violation Noted:Certain Measures for Verifying Adequacy of Plant Design Inadequate ML20216G0921998-04-0101 April 1998 Notice of Violation from Insp on 971027-980128.Violation Noted:Licensee Failed to Perform & Include in Written Records,Safety Evaluations for Approx 250 Changes to FSAR Made Between mid-1996 & mid-1997 ML20196J5911998-03-0909 March 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:As of Sept 1997, Condition Adverse to Quality Existed at Facility Which Had Not Been Promptly Identified & Corrected ML20203H0981998-02-25025 February 1998 Notice of Violation from Insp on 971201-31.Violation Noted: on 971222,equipment Located in safety-related Area,Unit 2 Control Room,Not Restrained in Accordance W/Attachment 3 in Procedure Oa 8 ML20198F0501997-12-30030 December 1997 Notice of Violation from Insp on 970825-29.Violation Noted: as of 970829,adequate Dose Assessment Methods Were Not in Use.Page 23 of Incoming Submittal Was Not Included ML20202J7221997-12-10010 December 1997 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $2,100,000.Violation Noted:Licensee Did Not Translate Design Features Into Work Instructions & Did Not Verify Adequacy of Designs ML20202J7891997-12-0505 December 1997 Notice of Violation from Insp on 970818-29 & 0908-19. Violations Noted:During NRC Insp That Ended 970919,listed Instances Were Identified Where Requirements of TS 6.8.1a Were Not Met ML20202A7491997-11-21021 November 1997 Notice of Violation Form Insp on 970722-1001.Violation Noted:On 971215 Activities Affecting Quality Were Not Prescribed by Documented Instructions,Procedures or Drawings ML20216C7471997-08-29029 August 1997 Notice of Violation from Insp on 970529-0721.Violation Noted:On Several Occasions in May & June 1997,overcoat Window Was Exceeded by 45 Minutes to 2 Hours & 41 Minutes ML20210S8701997-08-29029 August 1997 Notice of Violation from Insp on 970520-0721.Violations Noted:Overcoat Window Was Exceeded by 45 Minutes to 2 H & 45 Minutes ML20141E3101997-06-24024 June 1997 Notice of Violation from Insp on 970311-0519.Violation Noted:Since Commencement of Operations at Unit 1,applicable Regulatory Requirements & Design Basis Not Correctly Translated Into Drawings & Procedures ML20140F1121997-06-11011 June 1997 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:Licensee Identified Seven Incidents Where Items Containing Safeguards Info Had Not Been Under Control of an Authorized Individual ML20140C5551997-04-11011 April 1997 Notice of Violations from Insp on 970101-0310.Violations Noted:Since Commencement of Operations,Unit 1 Failed to Determine Concentration of Nuclides in Gaseous Effluents Released from Radwaste Storage Bldg Through Exhaust Fan ML20137F3921997-03-24024 March 1997 Notice of Violation from Insp on 961222-970208.Violations Noted:When Repeatedly Depressurizing Unit 2 RHR Sys from 970123-30,operators Did Not Properly Implement Procedures as Required ML20135E6111997-02-24024 February 1997 Notice of Violation from Insp on 961026-1231.Violation Noted:Individual Gained Access to PA W/O Having Authorized or Hand Geometry Confirmed ML20134G3911997-02-0303 February 1997 Notice of Violation from Insp on 961112-22.Violation Noted: Licensee Failed to Establish & Implement Procedure to Verify That Design Basis Relative to Ventilation Air Supply Involving Radwaste Was Maintained as Described by UFSAR IR 07100128/20120021997-01-0606 January 1997 Notice of Violation from Insp on 771128-1202.Violation Noted:Licensee Did Not Test Addl 10 Snubbers for Each Found Inoperable Per Procedure 2733B,hydraulic Snubber Functional Test,Rev 0,770601 ML20135C9951996-12-0303 December 1996 Notice of Violation from Insp on 960827-1025.Violation Noted:All Valves Classified as Containment Isolation Boundaries Did Not Receive Monthly Verification to Insure They Are in Closed Position ML20128M1941996-10-0909 October 1996 Notice of Violation from Insp on 960506-10.Violation Noted; Licensee Failed to Control SGI as Required on 951105 ML20149K7331994-07-13013 July 1994 Notice of Violation & Proposed Imposition of Civil Penalties in Amount of $220,000.Violation Noted:Licensee Failed to Take Action to Address Condition Until 891117,when FWCI Was Inoperable IA-97-223, Notice of Violation & Proposed Imposition of Civil Penalties in Amount of $220,000.Violation Noted:Licensee Failed to Take Action to Address Condition Until 891117,when FWCI Was Inoperable1994-07-13013 July 1994 Notice of Violation & Proposed Imposition of Civil Penalties in Amount of $220,000.Violation Noted:Licensee Failed to Take Action to Address Condition Until 891117,when FWCI Was Inoperable ML20059G0631993-12-23023 December 1993 Notice of Violation from Insp on Stated Date.Violation Noted:Written Licensee Procedures Were Not Established or Implemented Re Testing for Drugs ML20058D3371993-11-22022 November 1993 Notice of Violation from Insp on 930818-0928.Violation Noted:Seismic Brace in Count Rate Module of Radiation Monitor RM-8156 Not Reinstalled During Instrument Calibr ML20058Q0601993-10-15015 October 1993 Notice of Violation from Insp on 920512-14.Violation Noted. Licensee Determined That Records Required to Be Maintained by Commission Regulations or License Conditions Not Complete & Accurate in All Matl Respects ML20057E2971993-09-20020 September 1993 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000.Noncompliance Noted:During 1991-1992 LORT Program,Facility Failed to Ensure Personnel Licensed Per 10CFR55 Had Completed Requalification Program ML20056H2491993-09-0101 September 1993 Notice of Violation from Insp on 930719-23.Violation Noted: Measures to Assure Conditions Adverse to Quality Not Taken to Promptly Correct Deficiency of Failure to Follow Procedures as Evidenced by Listed Actions ML20056G3681993-08-26026 August 1993 Notice of Violation from Insp on 930614-25.Violation Noted: Dynamic Tests for Seventeen safety-related MOVs Performed in Accordance W/Test Procedures That Did Not Incorporate Requirements & Acceptance Limit for Determining Operability ML20128D6071993-02-0101 February 1993 Notice of Violation from Insp on 921028-1222.Violation Noted:Bypass Jumpers Not Initiated for Scaffolding Installed for Greater than 90 Days as Required by Procedure ACP 2.19 ML20127D8451993-01-11011 January 1993 Notice of Violation from Insp on 920706-24.Violation Noted: on 920706,implementation Plan of Plant Design Change Record 2-123-91 Was Not Translated Correctly Into Work Order M2-92-06984 ML20126K0671992-12-28028 December 1992 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $62,500.Violation Noted:Between 920711 & 0824, Two Independent Trains of Abfs Not Operable 1999-05-25
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000245/19990081999-09-14014 September 1999 Insp Repts 50-245/99-08,50-336/99-08 & 50-423/99-08 on 990615-0809.Four Violations Noted & Being Treated as Ncvs. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000423/19990071999-08-27027 August 1999 Insp Rept 50-423/99-07 on 990614-0715.Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Review of C/A Program Using IP 40500, Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems IR 05000336/19990061999-07-19019 July 1999 Insp Repts 50-336/99-06 & 50-423/99-06 on 990420-0614.Ten Violations Occurred & Being Treated as non-cited Violations. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000336/19982191999-06-10010 June 1999 Insp Rept 50-336/98-219 on 981214-18,990126-29,0208-19 & 0301-05.Noncited Violations Identified.Major Areas Inspected:Exam of Licensee Corrective Action Implementation IR 05000245/19990051999-06-0404 June 1999 Errata to Insp Repts 50-245/99-05,50-336/99-05 & 50-423/99-05,consisting of Figure 1 ML20207G1211999-06-0303 June 1999 Insp Repts 50-245/99-05,50-336/99-05 & 50-423/99-05 on 990302-0419.No Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support ML20207F1521999-05-25025 May 1999 Notice of Violation from Investigation Rept 1-94-021 on 940506-960329.Violation Noted:Between 740831-910407,licensee Made Changes to Facility Described in Safety Analysis Rept for Refueling Core Offloads Without Performing Evaluation ML20196K2621999-05-24024 May 1999 EN-99-020:on 980525,notice of Violation & Exercise of Enforcement Discretion Will Be Issued to Licensee.Action Based on Severity Level III Problem Consisting of Four Individual Violations Involving Refueling Outage PNO-I-99-022, on 990509,Millstone Unit 2 Established Reactor Criticality.Nrc Staff Providing Augmented Insp Coverage of Restart Activities,Including round-the-clock Observations of Licensee Activities During Key Operational Evolutions1999-05-11011 May 1999 PNO-I-99-022:on 990509,Millstone Unit 2 Established Reactor Criticality.Nrc Staff Providing Augmented Insp Coverage of Restart Activities,Including round-the-clock Observations of Licensee Activities During Key Operational Evolutions IR 05000336/19990031999-05-10010 May 1999 Insp Rept 50-336/99-03 on 990322-26.No Violations Noted. Major Areas Inspected:Review of Actions Taken by Util to Resolve Significant Issues List Item 21,fire Protection ML20206F4601999-04-30030 April 1999 Insp Rept 50-336/99-04 on 990315-31.Violation Noted.Major Areas Inspected:Monitored Licensee Activities During Plant Transition Between Operational Modes,Both During Normal & off-normal Working Hours PNO-I-99-016, on 990406,operators Initiated Plant Cooldown from Normal Operating Pressure & Temp in Mode 3,hot Standby. Cooldown Was Necessary to Minimize Further Degradation of Bonnet Pressure Seal for Valve 2-SI-652 & to Repair Valve1999-04-0707 April 1999 PNO-I-99-016:on 990406,operators Initiated Plant Cooldown from Normal Operating Pressure & Temp in Mode 3,hot Standby. Cooldown Was Necessary to Minimize Further Degradation of Bonnet Pressure Seal for Valve 2-SI-652 & to Repair Valve ML20205M7201999-04-0606 April 1999 Notice of Violation from NRC OI Case 1-96-002 & Conclusions of Millstone Independent Review Team.Violation Noted. E Debarba,Deliberately Discriminated Against Supervisor in Performance Engineering Group at Millstone Station ML20205M7351999-04-0606 April 1999 Notice of Violation from Investigation in Case Numbers 1-96-002 & 1-97-007.Violation Noted:Licensee Discriminated Against Supervisor in Performance Engineering Group at Plant Due to Involvement in Protected Activities IR 05000245/19990021999-04-0202 April 1999 Insp Repts 50-245/99-02,50-336/99-02 & 50-423/99-02 on 990112-0301.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000336/19990011999-03-29029 March 1999 Insp Rept 50-336/99-01 on 990117-0217.Violations Noted.Major Areas Inspected:Licensee C/A Program Implementation Using Guidance of NRC IP 40500, Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems ML20205J0941999-03-12012 March 1999 Rept of Review of Millstone Units 1,2 & 3:Allegations of Discrimination in NRC Ofc of Investigations Cases 1-96-002, 1-96-007,1-97-007 & Associated Lessons Learned ML20207M1131999-03-0909 March 1999 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $88,000.Violation Noted:Employment of Two Contractor Employees Terminated in Aug 1997,in Part Because Individuals Raised Concerns Re MOV Program Manual ML20205G6161999-03-0909 March 1999 EN-99-010:on 990309,notice of Proposed Imposition of Civil Penalty in Amount of $88,000 Issued to Licensee.Action Based Upon Severity Level II Problem Involving Discrimination Against Two Contractor Employees at Millstone MOV Dept IR 05000245/19980061999-03-0101 March 1999 Insp Repts 50-245/98-06,50-336/98-06 & 50-423/98-06 on 981123-990111.No Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support PNO-I-99-006, on 990128,operators Inadvertently Reduced Spent Fuel Pool Water Level by Two Inches When Purification of Spent Fuel Pool Water Initiated.Operators Held Shift Briefing to Discuss Realigning Purification Sys1999-01-29029 January 1999 PNO-I-99-006:on 990128,operators Inadvertently Reduced Spent Fuel Pool Water Level by Two Inches When Purification of Spent Fuel Pool Water Initiated.Operators Held Shift Briefing to Discuss Realigning Purification Sys IR 05000245/19982171999-01-22022 January 1999 Evaluation Repts 50-245/98-217,50-336/98-217 & 50-423/98-217 Conducted on 981026-30.Areas Evaluated:Whether NNECO Has Improved Sufficiently & Has Demonstrated Sustained Performance in Maintaining safety-conscious Work Environ PNO-I-99-004, on 990115,carbon Dioxide Was Inadvertently Discharged Into Unit 3 Cable Spreading Room,Containing Electrical Wiring.Ambulance Reported to Site as Precautionary Measure.Licensee Assembled Event Review1999-01-20020 January 1999 PNO-I-99-004:on 990115,carbon Dioxide Was Inadvertently Discharged Into Unit 3 Cable Spreading Room,Containing Electrical Wiring.Ambulance Reported to Site as Precautionary Measure.Licensee Assembled Event Review IR 05000336/19980051999-01-0707 January 1999 Insp Repts 50-336/98-05 & 50-423/98-05 on 981006-1123. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20199C6381999-01-0707 January 1999 Notice of Violation from Insp on 981006-1123.Violation Noted:On or Before 981120,conduit 9-15,in Fire Area A-24,not Sealed & Tested in Accordance with Astme E-119,fire Endurance Test PNO-I-99-001, on 981231,Millstone Unit 2 Began Reloading Fuel Into Reactor After Extended Shutdown.Millstone Unit 3 Went Critical on 981230,after Forced Outage Due to Inadvertent MSIV Closure During Surveillance Testing at Power1999-01-0404 January 1999 PNO-I-99-001:on 981231,Millstone Unit 2 Began Reloading Fuel Into Reactor After Extended Shutdown.Millstone Unit 3 Went Critical on 981230,after Forced Outage Due to Inadvertent MSIV Closure During Surveillance Testing at Power PNO-I-98-062, on 981211,Millstone Unit 3 Tripped from 100% Reactor Power During MSIV Partial Stroke Testing.Solenoid Valve Integral to MSIV Failed to Reopen When Licensed Operator Released Test Switch1998-12-15015 December 1998 PNO-I-98-062:on 981211,Millstone Unit 3 Tripped from 100% Reactor Power During MSIV Partial Stroke Testing.Solenoid Valve Integral to MSIV Failed to Reopen When Licensed Operator Released Test Switch ML20195H6901998-11-18018 November 1998 Notice of Violation from Insp on 980818-1005.Violation Noted:Engineering Evaluations Not Performed When RCS Heatup Rate Limit Exceeded on 951217 & When RCS Cooldown Rate Limit Exceeded on Three occasions,940424,0728 & 951215 IR 05000245/19982161998-11-18018 November 1998 Insp Repts 50-245/98-216,50-336/98-216 & 50-423/98-216 on 980818-1005.Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support IR 05000336/19982031998-11-0505 November 1998 Insp Rept 50-336/98-203 on 980824-0904.No Violations Noted. Major Areas Inspected:Effectiveness of Configuration Mgt Plan ML20155B1521998-10-23023 October 1998 Notice of Violation from Insp on 980810-0903.Violation Noted:Design Basis,As Described in FSAR Chapter 14,Accident Analyses Had Not Been Correctly Translated Into Plant Procedures & Acceptance Criteria IR 05000336/19982131998-10-23023 October 1998 Insp Rept 50-336/98-213 on 980810-0903.Violations Noted. Major Areas Inspected:Certain Aspects of Accident Mitigation Sys IR 05000245/19982151998-10-14014 October 1998 Evaluation Repts 50-245/98-215,50-336/98-215 & 50-423/98-215 on 980824-28.Major Areas Evaluated:Whether Licensee Has Improved Sufficiently & Has Demonstrated Sustained Performance in Maintaining safety-conscious Work Environ IR 05000336/19980041998-10-0101 October 1998 Insp Rept 50-336/98-04 on 980914-18.No Violations Noted. Major Areas Inspected:Mov Program Associated with GL 89-10 IR 05000245/19982121998-09-25025 September 1998 Insp Repts 50-245/98-212,50-336/98-212 & 50-423/98-212 on 980630-0817.No Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support IR 05000423/19982111998-09-11011 September 1998 Insp Rept 50-423/98-211 on 980413-24,0511-15,27-29,0609-11 & 23-25.Violation Noted.Major Areas Inspected:Evaluation of Licensee C/As & Other ICAVP Process Activities ML20154D1151998-09-11011 September 1998 Notice of Violation from Insp on 980413-24-0511-15,27-29, 0609-11 & 23-25.Violation Noted:Program Implemented TS 6.8.4.a,failed to Include Provisions to Reduce Leakage from RSS Heat Exchangers to SW Sys IR 05000424/19980061998-09-10010 September 1998 Insp Repts 50-424/98-06 & 50-425/98-06 on 980628-0815.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support PNO-I-98-039, 980812,Millstone Unit 3 Was Shutdown to Repair Small Leak on Afws Discharge Noted.Current Leakage Does Not Exceed Regulatory Requirements & Shutdown Not Required by Tech Specs.Licensee Issued Press Release on 9808111998-08-12012 August 1998 PNO-I-98-039:980812,Millstone Unit 3 Was Shutdown to Repair Small Leak on Afws Discharge Noted.Current Leakage Does Not Exceed Regulatory Requirements & Shutdown Not Required by Tech Specs.Licensee Issued Press Release on 980811 ML20237D3041998-08-12012 August 1998 Notice of Violation from Insp on 980413-0508.Violations Noted:Two Examples Identified Where Licensee Not Performing Leakage Testing of safety-related Valves in Sys That Could Contain Highly Radioactive Fluids During Accident IR 05000245/19982081998-08-12012 August 1998 Insp Repts 50-245/98-208,50-336/98-208 & 50-423/98-208 on 980428-0629.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support ML20237B0741998-08-12012 August 1998 Notice of Violation from Insp on 980428-0629.Violation Noted:Licensee Failed to Direct Test Personnel to Close & Lock RHR Outboard Drain Valve IR 05000336/19982011998-08-12012 August 1998 Insp Rept 50-336/98-201 on 980413-0508.Violations Noted. Major Areas Inspected:Licensee Ability to Identify & Resolve Deficiencies Focusing,But Not Limited To,Period of CMP Implementation & ICAVP at Parsons Power Group,Inc PNO-I-98-026, on 980701,Millstone Unit 3 Criticality Update Made.Nrc Staff Continues to Provide Augmented Insp of Unit 3 Restart Activities,Including round-the-clock Coverage of Key Operational.Licensee Plans No Press Release1998-07-0101 July 1998 PNO-I-98-026:on 980701,Millstone Unit 3 Criticality Update Made.Nrc Staff Continues to Provide Augmented Insp of Unit 3 Restart Activities,Including round-the-clock Coverage of Key Operational.Licensee Plans No Press Release PNO-I-98-025, on 980630,unit 3 Established Reactor Criticality,However Reactor Was Shut Down When Control Room Operator Noticed Spiking Intermediate Range Monitor.Licensee Troubleshooting1998-06-30030 June 1998 PNO-I-98-025:on 980630,unit 3 Established Reactor Criticality,However Reactor Was Shut Down When Control Room Operator Noticed Spiking Intermediate Range Monitor.Licensee Troubleshooting IR 05000245/19982071998-06-19019 June 1998 Insp Repts 50-245/98-207,50-336/98-207 & 50-423/98-207 on 980301-0427.Violations Noted.Major Areas Inspected:Maint, Operations,Engineering & Plant Support ML20249C6931998-06-19019 June 1998 Notice of Violations from Combined Insp on 980301-0427. Violations Noted:Prior to 980424,instrument Min Accuracy of Wind Speed Channels Were Not Measured as Required by Table 3.3-8 of Unit 2 TS 3/4.3.3.4 IR 05000423/19970831998-06-12012 June 1998 Insp Rept 50-423/97-83 on 980413-24.Violations Noted. Major Areas Inspected:Readiness of Plant Hardware,Staff & Mgt Programs to Support Safe Restart & Continued Operation of Plant Unit 3 ML20249B0421998-06-12012 June 1998 Notice of Violations from Insp on 980413-24.Violations Noted:Only 1 RCS Loop Operable W/Plant in Mode 4 on 980407 IR 05000423/19970821998-06-11011 June 1998 Insp Rept 50-423/97-82 on 980209-20.Violations Noted.Major Areas Inspected:Corrective Actions Processes 1999-09-14
[Table view] |
Text
.. .- - - .- . .
ENCLOSURE NOTICE OF VIOLATION AND' PROPOSED IMPOSITION OF CIVIL PENALTY -
Northeast Nuclear Energy Company : Docket No. 50-423 Millstone, Unit 3 License No. NPF-49' Waterford, Connecticut EA 92-166 During an NRC inspection conducted on August 18 through September 14,1992, violations of NRC requirements were identified. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1992), the Nuclear Regulatory Commission proposes to impose a civil penalty pursuant to Section 234 of the Atomic Energy Act of 1954, as amended (Act), 42 U.S.C. 2282, and 10 CPR 2.205. The particular violations and associated civil penalty are set forth below:
- 1. VIOLATIONS ASSESSED A CIVIL PENALTY A. Technical Specification 3.7.9 requires that, when the plant is in operational modes 1 through 4, two independent auxiliary building 61ter systems (ABFSs) must be operable. With one system inoperable, the system must be returned to service within seven days or the unit must be placed in hot standby within six hours and cold shutdown within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
Technical ' SpeciGcation 3.0.3 requires that, 'when a- limiting condition for operation is not met, within one hour actions must be initiated to place the unit in a mode in which the specincation does not apply.
Contrary to _ the above, between July 11, 1992, and August 24, _1992, two independent trains of the ABFS were not operable because the variable inlet vanes -
(VIVs) to the 61ter exhaust fans were manually set at 100 percent rather than in.
automatic and actions were not initiated within one hour to place the unit'in a mode in which the speciGcation did not apply.
B. 10 CFR Part 50, Appendix B, Criterion XI, Test Control requires, in part, that measures be established to assure that testing is performed to demonstrate that- ,
systems will function satisfactorily in service in accordance with procedures that incorporate the appropriate plant design considerations.
OFFICIAL RECORD COPY p: PROP-MS3.ABF 930}O70017 921228
{DR ADOCK 0500o423 PDR
Enclosure 2 Northeast Utilities Quality Assurance Program (QAP) Topical Report, Section 11,
" Test Control," which, in part, implements 10 CFR Part 50, Appendix B, Criterion XI specifies that tests be performed to verify that systems will function satisfactorily in service in accordance with plant design documents.
Surveillance Procedures SP 3646A.17, " Train A Engineered Safety Features with Loss of Power," SP 3646A.18," Train B Engineered Safety Features with Loss of Power," and SP 3614I.3, " Supplemental Leak Collection and Release System,"
implement, in part, Section 11 of the Northeast Utilitics QAP Topical Report and verify, respectively, the requirements of Technical Specification (TS) 4.7.9.d(2) and TS 4.6.6.1.d(3) for satisfactory operation of the auxiliary building filter system (ABFS) and the supplementarj leak collection and release system (SLCRS).
Contrary to the above, since initial plant startup in January 1986, testing procedures performed to demonstrate that the ABFS and SLCRS function satisfactorily in service were not adequate, in that they did not incorporate appropriate plant design considerations. Surveillance procedures, SP 3646A.17, SP 3646A.18, and SP 36141.3, did not align the systems in a configuration that would demonstrate their accident functions and, therefore, did not identify system degradation and design problems that prevented these systems from performing their safety functions. Specifically, the systems were tested in the automatic control modes, even though they were normally operated with the VIVs in a fixed open mode and the SCLRS could not draw the design vacuum within the required time of 50 seconds due to ABFS fan control time delays.
These violations have been categorized in the aggregate as a Severity Level III problem (Supplement I).
Cumulative Civil Penalty - $62,500 II. VIOLATION NOT ASSESSED A CIVIL PENALTY Technical Specification 6.8.1 requires that written procedures be established, implemented, and maintained covering maintenance activities delineated in Appendix A of Regulatory Guide 1.33, Revision 2, February 19'78.
Administrative Controls Procedure (ACP) QA-2.02C, " Work Orders," Revision 30, implements the work control process and requires that work orders include a job description, retest performance, lifted lead control, documentation of actual work performed, and work order inclusion in the permanent plant record.
OFFICIAL RECORD COPY p: PROP-MS3.ABF
4 Enclosure 3 Contrary to the above, from May 17, 1992, through May 24, 1992, the work control process for preventive maintenance of the A hydrogen recombiner was inadequate, in that the job description and retest requirements were not provided, lifted lead control was not maintained, a post-maintenance retest was neither specified nor performed, and the work order was discarded rather than placed in the permanent plant record. This resulted in rendering the A hydrogen recombiner inoperable when it was required during plant power operation between May 17,1992, and August 21,1992, in addition, both trains of the hydrogen recombiner system were inoperable while preventive maintenance was performed on the B hydrogen recombiner when the plant operated at 100 percent power between August 12 and August 17, 1992.
This is a Severity Level IV Violation (Supplement 1).
Pursuant to the provisions of 10 CFR 2.201, Northeast . Nuclear Energy Company (Licensee) is hereby required to submit a written statement or explanation to the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, within 30 days of the date of this Notice of Violation and Proposed imposition of Civil Penalty (Notice). This reply should be clearly marked as a " Reply to a Notice of Violation" and should include for each alleged violation:
(1) admission or denial of the alleged violation, (2) the reasons for the violation if admitted, and if denied, the reasons why, (3) the corrective steps that have been taken and the results achieved, (4) the corrective steps that will be taken to avoid further violations, and (5) the date when full compliance will be achieved. If an adequate reply is not received within the time specified in this Notice, an order or a demand for information may be issued as to why the license should not be modified, suspended, or revoked or why such other action as may be proper should not be taken. Consideration may be given to extending the response time for good cause shown.
Under the authority of Section 182 of the Act,42 U.S.C. 2232, this response shall be submitted under oath or aftirmation.
Within the same time as provided for the response required above under 10 CFR 2.201, the Licensee may pay the civil penalty by letter addressed to the Director, Office of Enforcement, U.S. Nuclear Kegulatory Commission, with a check, draft, money order, or electronic transfer payable to the Treasurer of the United States in the amount of the civil penalty proposed above, or may protest imposition of the civil penalty in whole or in part, by a written answer addressed to the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission. Should the Licensee fail to answer within the time specified, an order imposing the civil penalty will be issued. Should the Licensee clect to file an answer in accordance with 10 CFR 2.205 protesting the civil penalty, in whole or in part, such answer should be clearly marked as an " Answer to a Notice of Violation" and may: (1) deny the violations listed in this Notice, in whole or in part, (2) demonstrate extenuating circumstances, (3) show error in this Notice, or (4) show other reasons why the penalty should not be imposed. In addition to protesting the civil penalty in whole or in part, such answer may request remission or mitigation of the penalty.
OFFICIAL RECORD COPY p: PROP-MS3.ABF
1 i
Enclosure 4 In requesting mitigation of the proposed penalty, the factors addressed in Section V.B of 10 CFR Part 2, Appendix C (1992), :hould be addressed. Any written answer in accordance with 10 CFR 2.205 should be set forth separately from the statement or explanation in reply pursuant to 10 CFR 2.201, but may incorporate parts of the 10 CFR 2.201 reply by specific reference (e.g., citing page and paragraph numbers) to avoid repetition. The attention of the Licensee is directed to the other provisions of 10 CFR 2.205, regarding the procedure for imposing a civil penalty.
Upon failure to pay any civil penalty due which subsequently has been determined in accordance with the applicable provisions of 10 CFR 2.205, this matter may be referred to the Attorney _
General, and the penalty, unless compromised, remitted, or mitigated, may be collected by civil action pursuant to Section 234c of the Act,42 U.S.C. 2282(c).
The response noted above (Reply to Notice of Violation, letter with payment of civil penalty, and Answer to a Notice of Violation) should be addressed to: Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C.
20555 with a copy to the Regional Administrator, U.S. Nuclear Regulatory Commission, Region 1,475 Allendale Road, King of Prussia, Pennsylvania 19406 and a copy to the Senior Resident inspector, Millstone Station.
Dated at King of Prussia, Pennsylvania thisagdday of December 1992 OFFICIAL RECORD COPY p: PROP-MS3.ABF
_ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _