Text
-
I
.r--
PRESERVICE INSPECTION PROGRAM FOR THE
}
VIRGIL.C. SUMMER' STATION i
(REVISION 2) i OWNER:
South Carolina Electric and Gas Company P.O.. Box 328 Main Street Columbia, South Carolina 29218 i
PLANT:
V.C. Summer Station l
Located - Twenty-Six' Miles Northwest of Columbia in Jenkinsville, South Carolina t
CAPACITY: 900 MWe h
A3[F1 PREPARED BY:
Qt
\\'
[
PLAN APPROVALS:
e//25/W IG3ERVLCE INSPECTION COORDINATOR
'DATE f/
5 QA GROUP SUPERVISOR DATE (0Y4 v/>WPi MANAGER, V.C.
SUMMER NUCLEAR
' 'DATE i
.l ST ION
.Y 4 tf f/
MANAGER, NUCLEAR ENGINEERING DATE (
l CONCURRENCE:
c.
h 8/
AUTHORIZED @ CLEAR INSERVICE DATE INSPECTOR
\\
,,s...
i s, q
- 5195050296
I
/
fm. -
TABLE OF CONTENTS d
l PAGE SECTION A
+
Introduction AP-014 "Preservice Inspection Program"................. A-1 through A-3 SECTION B NDE
.1.
Introduction....................................... B-3 through B-7B 2.
Tables of Class 1 and 2 Systems..................... B'-8 through B-27 and Components 3.
Relief Request...................................... B-28 through B-41 4.
PSI Weld Reference Index........................... B-42 through B-49 5.
PSI File No. t6 Weld No. Index..................... B-50 through B-55B 6.
Scoped Drawings.................................... B-56 through B-74 7.
Isometric Drawings a.
Regular Program................................ B-75 through B-186 b.
Augmented Program.............................. B-187 through B-198 e
SECTION C HYDROSTATIC TESTING (s,)
Introduction........................................... C-2 Index.................................................. C-3 1.
ISI Hydro Reference Index......................... C-4 through C-10A 2.
Scoped Drawings
.....................................C'11 through C-69 3.
Sample PSI File Packet............................. C-70 through C-87 4.
Sample PSI Routing Sheet........................... C-89 through C-90 5.
Sample Data Sheets................................. C-92 through C-93 6.
Sample Completed Procedure.......................... C-94 through C-109 SECTION D PUMPS Introduction.......................................... D-2 Index................................................. D-3 1.
List of Pumps..................................... D-4 through D-8 2.
Symbols (De f ini t io n s )'............................. D-9 through D-10 3.
ISI Test Quantities............................... D-12 l
4.
Sample Data Sheet................................. D-14 through D-15 a.
Preservice/ Baseline Data Sheet 5.
Relief Request (Deleted)
Revision 2........... D-17
)
1 l
o (REVISION 2)
JU
..e.
t
-I TABLE OF CONTENT (Continued) t i
i SECTION E^
VALVES.
Introduction.......................................
E-2 through.E-3'.
Index..............................................
E-4
- 1.. List of Drawings................................
E-5 through E-7 i
2.
List.of Valve Categories.......................- E-8 through E-9..
l' 3.
Sample. Data Sheet a.
Preservice/ Baseline Data Sheet E-ll
[
4.
List of Definitions'and Valve Tables
. E-13 through E-14 i
Symbols..................'......................
.5.
List of Valves................................. E-15 through E l 6.
Relief Request (Deleted)
Revision 2........
E-46 through E-75 l'i i
SECTION:F COMPONENT SUPPORTS l
l Introduction.......................................
F-2 r
Index..............................................
F-3
'l 1.
Component Supported Reference Index............
F-4. through F-23 i
(Scoped Drawings)
(Deleted - Revision 2).......
F-23 2.
Sample Data Sheet F-25 l
r 1
a r I
i I,
4 Il!
F I
r t
O L
A (Revision 2)
Nr*#.
g.
er..5 w
2
-.c----i,,
u
.-.,w.
+%wa m-a
l i
i L
i 4.
Preservice/ Baseline Inspection Program i
i Baseline data to support the PSI program will be complied in accor.
dance with the 1974 edition of the code through Summer 1975 addenda.
i
-f Baseline data /preservice inspections will be performed during the l
l t
construction and start-up phases of the station, utilizing l
i Westinghouse inspection procedures and SCE&G startup functional and pre-operational test procedures. The specific procedures and example of same are listed in the-applicable sections of this plan.
c -.
e i
i 5.
Control
(
This plan, in conjunction with AP-014 (Preservice Inspection Program),
~
has been prepared as the controlling documents governing the preservice/
baseline data inspection activities at the V.C. Summer Station, j
6.
Supporting Programs
, l I
f i i All supporting programs and/or documentations referenced herein are maintained at the station.
t t :)'
Should cetain ASME Section XI Code requirements be discovered to be impractical due to unforeseen reasons during the process of perform.
ing inspections or test,
'i l
ki k ))
?t i!
i t
i A-2 (Rev. 2)
!i-i!
... - -. ~ -,..- _
g
~;, ---.,.:...,
-y
,