ML20126J762
| ML20126J762 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 07/08/1980 |
| From: | Riggs R Office of Nuclear Reactor Regulation |
| To: | Berlinger C Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8105050248 | |
| Download: ML20126J762 (1) | |
Text
. -
-. - 7 kIS( Nd
.s v,,-
JUL 8 1980 MENORANDlm FOR:
C. Berlinger,. Acting Chief Operating Experience Evaluation Branch Division of Safety Technology
.FROM:
R. Riggs, Operating Experience Evaluation Branch
$UBJECT:
REACTOR PROTECTION SYSTEM (RPS) DELAY ~ TIME In accordance with the attached letter dated April 23, 1980; M. Cooney (Philadelphia Electric Company) to B. Grier (0!E). the Peach Botten Units 2 and 3 reload safety analyses were based on a RPS delay time of 50 milli-second. Centrary to the above letter, this discrepancy between the analyses delay time (50 millisecond) and the Tech Spec value (100 millisecond) was picked up by the NRC reviewer (R. Riggs) on the Peach Botton 2 Reload 4 submittal.
Discussions between the licensee MRC Project Manager (D. Verre111), and NRC reviewer (R. Riggs), and subsequent discussions with GE prompted the above letter. As a result of these discussions. the Peach Botton Unit 2 i
Reload 4 SER included eer evaluation and ACPR allowance to adjust for this -
k discrepancy. The 015-2 Branch Chief (T. Tppelite) and Peach Botton Project Manager were made aware that these conditions may exist at othez BWR facilities.
I am assuming that the PM's of the vereces BWR plants will have determined if any corrective action (pt adjustment) is required at other operating SWR's.
i Therefort, no further action in the part of 0EER is required.
F R. Riggs Operating Experience Evaluation Branch j
Attachment:
l As stated.
1 cc:
T. Ippolite
- s e
co
- o. verroiti
'h.
R. Bevan Y
P:
R. Clark J
J J. Hanson S-
,?
I P. Polk O
APil 2 71981W' T. Kavern
-Y "
yI R. Riggs U
NOTE; w/o attachment N
s orrscE >..? I.
{$$.... +
SURN AME k. b..Ri g@
../3/80P5* g e g h,. h.,
7 oaTc >
P4RC FORM 316 (946) NRCM 0240
. DUA COVERNMENT PRINTING OFFICE: 1979 789 369
... _ _